HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (6 Oct 2024)

QC/T 1150-2021 related PDF English

QC/T 1150-2021 (QC/T1150-2021, QCT 1150-2021, QCT1150-2021) & related versions
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)See DetailStatusSimilar PDF
QC/T 1150-2021English260 Add to Cart 0-9 seconds. Auto delivery. Fuel system technical specifications of methanol vehicle QC/T 1150-2021 Valid QCT 1150-2021
Buy with any currencies (Euro, JPY, KRW...): QC/T 1150-2021    Preview this PDF: QC/T 1150-2021



QC/T 1150-2021: PDF in English (QCT 1150-2021)
QC/T 1150-2021 QC AUTOMOBILE INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 43.080.01 CCS T 47 Technical specifications of methanol automobile fuel system ISSUED ON: MARCH 05, 2021 IMPLEMENTED ON: JULY 01, 2021 Issued by: Ministry of Industry and Information Technology of PRC Table of Contents Foreword ... 5  1 Scope ... 6  2 Normative references ... 6  3 Terms and definitions ... 7  4 Technical requirements ... 8  5 Test method ... 14  Appendix A (Normative) Specification for life cycle test of methanol pipe joints ... 19  Technical specifications of methanol automobile fuel system 1 Scope This document specifies the terms and definitions, technical requirements, test methods of methanol automobile fuel system. This document applies to vehicles, which are equipped with methanol single- fuel engines or diesel/methanol dual-fuel engines. 2 Normative references The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, for dated reference documents, only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document. GB/T 1690 Rubber, vulcanized or thermoplastic - Determination of the effect of liquids GB/T 4334 Corrosion of metals and alloys - Test methods for intergranular corrosion of austenitic and ferritic-austenitic (duplex) stainless steels GB/T 5563 Rubber and plastic hoses and hose assemblies - Hydrostatic testing GB/T 5567 Rubber and plastic hoses and hose assemblies - Determination of resistance to vacuum GB 7258 Technical specifications for safety of power-driven vehicles operating on roads GB/T 7762 Rubber, vulcanized or thermoplastic - Resistance to ozone cracking - Static strain testing GB/T 11547 Plastic - Methods of test for the determination of the effects of immersion in liquid chemicals GB/T 14905 Rubber and plastics hoses - Determination of adhesion between components 4.2.1 The methanol automobile fuel system shall be manufactured, in accordance with the product drawings and other technical documents, which are approved by the prescribed procedures. The safety protection of the fuel system shall meet the requirements of GB 7258. 4.2.2 All electrical components, in the methanol automobile fuel system, shall meet the requirements of QC/T 413. 4.2.3 All parts of the methanol automobile fuel system, in contact with methanol, shall be resistant to methanol corrosion and swelling. Rubber parts shall comply with the requirements of GB/T 1690; plastic parts shall comply with the requirements of GB/T 11547; metal parts shall comply with the requirements of GB/T 4334. Use the M100 automobile methanol fuel, to carry out 120 h immersion test, at the test temperature of 40 °C ± 2 °C; the mass change rate of the specimen, before and after immersion, shall not exceed 5%; the volume change rate shall not exceed 15%; the mechanical properties change shall not exceed 10%. 4.2.4 The methanol box shall have the function of pressure regulating and control. 4.2.5 The working environment temperature shall meet the following requirements: a) Parts installed in the engine compartment: -40 °C ~ 120 °C; b) Parts installed in other parts: -40 °C ~ 85 °C. 4.2.6 The methanol automobile fuel system shall have a methanol evaporation control device. 4.2.7 There shall be obvious warning signs, at the methanol fuel filling port. 4.2.8 The design and installation of methanol automobile fuel system's pipelines shall ensure the safety and reliability of the pipeline of whole vehicle. 4.2.9 Methanol delivery pipes and other fuel pipes shall be clearly distinguished or marked in appearance. 4.3 System requirements 4.3.1 Technical requirements for methanol box assembly 4.3.1.1 The appearance of the metal methanol box assembly, the material of the methanol box, the cleanliness of the interior of the methanol box, the methanol box cover and the filling port, the safety performance of the methanol box, shall meet the requirements of 4.2 ~ 4.4 and 4.6 ~ 4.7 in QC/T 644-2014. 4.3.1.2 The performance of the plastic methanol box assembly shall be implemented in accordance with the provisions of GB 18296. 4.3.1.3 The methanol box assembly shall be equipped with a fuel evaporation exhaust port, which shall be located above the methanol liquid level, when the rated capacity of the methanol box is reached. The methanol vapor shall be able to exit the methanol box, through the evaporation exhaust port. 4.3.2 Technical requirements for methanol level sensor 4.3.2.1 Normal working environment of methanol level sensor, appearance, state of movable part, basic error, insulation pressure resistance, resistance to temperature change, temperature influence, humidity resistance and resistance to cyclic humidity change, vibration resistance, durability, airtightness shall meet the requirements of 4.2 ~ 4.10 and 4.12 in QC/T 823-2009. 4.3.2.2 The methanol level sensor shall be able to withstand methanol immersion. After testing in accordance with the provisions of 5.1, the metal parts and non-metal parts of the sensor shall meet the requirements of 4.2.3; the functions shall meet the requirements of 4.3 and 4.4 of QC/T 823-2009. 4.3.3 Technical requirements for methanol pump 4.3.3.1 The flow rate shall be able to meet the requirements of the maximum fuel consumption of the engine. 4.3.3.2 The methanol pump shall be marked with the flow direction of the methanol in and out. 4.3.3.3 The allowable medium of the methanol pump shall meet the requirements of M100 automobile methanol fuel. 4.3.3.4 Appearance, surface protection, materials shall meet the following requirements: a) The methanol pump shall have no obvious damage, cracks, shrinkage, deformation, corrosion, or other defects, that affect the working performance; the plastic components shall have no obvious color difference; b) The electroplated parts or chemically treated parts shall comply with the provisions of 5.2 in QC/T 625-2013; there shall be no red rust after the 96h neutral salt spray test. 4.3.3.5 The working voltage shall meet the following requirements: a) Nominal voltage: 12V, range 8V ~ 16V; After processing in accordance with the provisions of 5.3.1, the initial burst pressure of high-pressure pipelines, such as oil supply and return pipe, shall not be less than 5 MPa. The initial burst pressure of low-pressure pipelines, such as ventilation and refueling pipes, shall not be less than 0.35 MPa. 4.3.5.3 Initial bonding strength of methanol delivery pipe After processing as specified in 5.3.2, the initial bonding strength between adjacent adhesive layers shall not be less than 1.5 N/mm. 4.3.5.4 Vacuum resistance of methanol delivery pipe When tested according to the requirements of 5.3.3, the vacuum degree shall meet the requirements of Table 1 in 5.3.3; the pressure holding time shall be within the range of 15 s ~ 60 s; the steel ball of the specified diameter can pass freely. 4.3.5.5 Low temperature performance of methanol delivery pipe After treatment in accordance with the provisions of 5.3.4, the inner and outer walls of the methanol delivery hose shall be free of cracks AND meet the requirements of 4.3.5.2. 4.3.5.6 High temperature resistance of methanol delivery pipe - M100 methanol - ozone performance After testing in accordance with the provisions of 5.3.5, use a 2x magnifying glass, to check the appearance of the methanol delivery pipe; there shall be no cracks. 4.3.5.7 Heat aging resistance of methanol delivery pipe After testing in accordance with 5.3.6, there shall be no cracks or separation of the inner and outer layers of the methanol delivery pipe. 4.3.5.8 Methanol permeation resistance of methanol delivery pipe Carry out the test in accordance with 5.3.7. The permeation value of the high- pressure pipelines, such as the oil supply and return pipes, of the methanol delivery pipe shall not be greater than 15g/ (m2 • 24h); the permeation value of the low-pressure pipelines, such as ventilation and refueling pipes, shall not be greater than 5g/ (m2 • 24h). 4.3.5.9 Conductivity of methanol delivery pipeline The test is carried out at a voltage of 550 V ± 50 V, in accordance with the provisions of 5.3.8. It is required that the resistivity of the methanol delivery hose shall not be greater than 10 Ω • m. 4.3.5.10 Methanol resistance of methanol delivery pipeline After the test in accordance with 5.3.9, the burst pressure of the high-pressure pipelines, such as the oil supply and return pipes, of the methanol delivery pipe shall not be less than 3.5 MPa; the burst pressure of the low-pressure pipelines, such as ventilation and refueling pipes, shall not be less than 0.3 MPa, meanwhile they shall meet the requirements of 4.3.5.3, 4.3.5.5, 4.3.5.6. 4.3.6 Technical requirements for methanol rail The performance of the methanol rail shall meet the requirements of GB/T 25366. The methanol resistance shall meet the requirements of 4.2.3. 4.3.7 Technical requirements for methanol injector The performance of the methanol injector shall meet the requirements of GB/T 25367. The methanol resistance shall meet the requirements of 4.2.3. 4.3.8 Technical requirements for methanol pipe joints 4.3.8.1 Basic requirements When metal joints are used for methanol pipe joints, the basic requirements shall be implemented in accordance with the relevant national standards; the methanol corrosion resistance shall be implemented in accordance with the provisions of 4.2.3. When using a plastic quick-plug connector for methanol pipe joints, follow the provisions of 4.3.8.2 ~ 4.3.8.10 of this document. 4.3.8.2 Low pressure leakage of methanol pipe joint Carry out the test in accordance with the provisions of 5.4.1; the maximum leakage, in the standard volume under the steady state, shall be 2 cm3/min. 4.3.8.3 High pressure leakage of methanol pipe joints Carry out the test in accordance with the provisions of 5.4.2. The maximum leakage, in the standard volume under the steady state, shall be 5 cm3/min. 4.3.8.4 Vacuum leakage of methanol pipe joints Carry out the test in accordance with the provisions of 5.4.3. The maximum leakage, in the standard volume under the steady state, shall be 2 cm3/min. 4.3.8.5 Assembly force requirements for methanol pipe joints After the test in accordance with 5.4.4, the maximum assembly force of the methanol pipe joint for the first time shall not be greater than 111N; after the test in accordance with 4.3.8.8 and 4.3.8.9, the maximum assembly force shall not Then perform the ozone test. 5.3.5.2 Ozone test Cut a 25 mm x 150 mm test piece longitudinally, from the outermost layer of the rubber hose. Test it in accordance with the provisions of GB/T 7762. The test steps are as follows: a) After the test piece is installed, place it in an ozone-free place, at room temperature, for 24h; then place it in an ozone box, which has an ozone volume fraction of 100 x 10-8 ± 5 x 10-8 AND a temperature of 38 °C ± 1 °C; b) After 2 weeks, take the test piece out of the ozone box. Use a 2x magnifying glass to check the appearance, after cooling at room temperature. The proximity to the device may be exempted of inspection. 5.3.6 Heat aging resistance test of methanol delivery pipe Place the finished hose, in an air aging box, which has a temperature of 125 °C ± 2 °C, for 1h. Take out the hose. Use short nylon or metal rods, to plug it at both ends. Place it again at the temperature specified above for 700h. Take out the hose. Unplug it. Cool it for 2h, at room temperature. Bend 180° for 3 times, within 4s. Check the appearance. 5.3.7 Methanol permeation resistance test of methanol delivery pipe The test temperature shall be 40 °C ± 2 °C. The test pressure shall be 14.5 kPa. The test fuel shall be M100 methanol. The sample is pretreated at 40 °C ± 2 °C for 664h; the methanol is replaced every 168h. Then carry out the permeation test immediately, for no less than 336h. For equipment requirements and test methods, refer to the provisions in Appendix A of QC/T 798-2008. The test shall be carried out on 3 specimens. Take the intermediate value of the 3 measured values as the result. 5.3.8 Conductivity test of methanol delivery pipe Insert both ends of the 610 mm long hose into the stopper. Use a pipe clamp to fix it. Place it for 10 minutes, before proceeding with the test. Install an ohmmeter at each end. Place the parts on the insulating surface. Measure the overall length of the hose, as well as the electrical resistivity between the pipe clamps. The measurement voltage shall be 550V ± 50V 5.3.9 Methanol resistance test of methanol delivery pipe Choose M100 methanol and test 1000h at 23 °C ± 2 °C. The detailed test methods and requirements shall be implemented in accordance with the item m) of part 5 in GB/T 24141.2-2009. 5.4 Test method for methanol pipe joints 5.4.1 Low pressure leakage performance test of methanol pipe joint Connect the joint, in a simulated loading state, to the pipeline, at 23 °C ± 2 °C. Fix the connected pipeline assembly on a special device. Seal one end. Use a pressurizing device to increase the pressure of the other section to 69 kPa ± 7 kPa. Measure the leakage in a steady state. 5.4.2 High pressure leakage performance test of methanol pipe joint Connect the joint, in a simulated loading state, to the pipeline, at 23 °C ± 2 °C. Fix the connected pipeline assembly on a special device. Seal one end. Use a pressurizing device to increase the pressure of the other section to 1034 kPa ± 35 kPa. Measure the leakage in a steady state. During the high pressure test, it may add appropriate safety device. 5.4.3 Vacuum leakage performance test of methanol pipe joint Connect the joint, in a simulated loading state, to the pipeline, at 23 °C ± 2 °C. Fix the connected pipeline assembly on a special device. Seal one end. Apply a 7 kPa vacuum to the other section. Measure the leakage in a steady state. 5.4.4 Assembly force test of methanol pipe joint Assemble the joint, in a simulated loading state, to the fixture, at 23 °C ± 2 °C. It shall carry out the assembly, at a rate of 51 mm/min ± 5 mm/min. Test the maximum external force, which is required for the test joint to be fully assembled to the quick-plug joint. 5.4.5 Pull-out force test of methanol pipe joint Assemble the joint, in a simulated loading state, to the fixture, at 23 °C ± 2 °C. Appropriately fix the end of the quick-plug joint, which is assembled with the pipe, to facilitate the axial extension of the quick-plug joint. Apply the extension load, at 51 mm/min ± 5 mm/min. Measure the load value, which is required to completely separate the quick-plug joint, at the connection. 5.4.6 Edge load test of methanol pipe joint Insert the quick-plug joint into the pre-prepared elbow or hose, which has one end sealed, at 23 °C ± 2 °C. Fix it to the testing equipment. Use a pressurizing device, to pressurize to 1034 kPa ± 35 kPa. At the same time, at 200N load, apply the load at rate of 12.7 mm/min ± 5 mm/min. Measure the leakage in a steady state. The value shall not be greater than 8 cm3/min, in standard volume. Visually inspect the joint and its accessories. ......

BASIC DATA
Standard ID QC/T 1150-2021 (QC/T1150-2021)
Description (Translated English) Fuel system technical specifications of methanol vehicle
Sector / Industry Automobile & Vehicle Industry Standard (Recommended)
Word Count Estimation 16,159
Date of Issue 2021-03-05
Date of Implementation 2021-07-01