US$169.00 · In stock Delivery: <= 2 days. True-PDF full-copy in English will be manually translated and delivered via email. MT 92-1984: Emulsion pump with liquid level indicator test specification Status: Obsolete
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| MT 92-1984 | English | 169 |
Add to Cart
|
2 days [Need to translate]
|
Emulsion pump with liquid level indicator test specification
| Obsolete |
MT 92-1984
|
PDF similar to MT 92-1984
Basic data | Standard ID | MT 92-1984 (MT92-1984) | | Description (Translated English) | Emulsion pump with liquid level indicator test specification | | Sector / Industry | Coal Industry Standard | | Classification of Chinese Standard | D98 | | Word Count Estimation | 3,334 | | Date of Issue | 10/19/1984 | | Date of Implementation | 1/1/1985 | | Summary | This standard applies to coal mine emulsion pump tank level indicator matching (hereinafter referred to as indicator) test. |
MT92: ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Emulsion pump with liquid level indicator test specification
People's Republic of China Coal Industry Standard
MT/T 92-84
Liquid level indicator for coal mine emulsion pump station
Test specification
Published on October 16, 1984
1985-01-01 implemented
Approved by the Ministry of Coal of the People's Republic of China
Contents
1 General 1
2 Test device and measurement accuracy 1
3 Test method 1
4 Signal requirements 3
Liquid level indicator for coal mine emulsion pump station
Test specification
This standard is applicable to the test of the liquid level indicator (hereinafter referred to as the indicator) that is matched with the liquid tank of the emulsion pump station of the coal mine.
1 General
1.1 Indicator test is divided into type test and factory test.
1.2 Type test should be performed in the following cases.
a. Trial production of new products (including transfer of old products to the factory);
b. When changing the design, process or materials of the product to affect the performance of the product;
c. When a higher-level quality management department requests a product that has been discontinued for more than three years and re-produced or mass-produced product;
d. When users have major objections to product quality.
1.3 Before the product leaves the factory, it should be tested one by one.
1.4 The number of type tests is 3, of which 1 is a continuous action test. For mass-produced products, the test results do not meet the type test
When required, six more samples are taken for retesting, of which two are for continuous action test. If it still does not meet the requirements, it is disqualified.
1.5 The test unit shall provide complete test pieces and supporting pumps, accumulators, pipe accessories and connection dimensions related to the test.
It also provides information such as instruction manuals, factory inspection records, general design drawings, consumables drawings, pumping station hydraulic system drawings, etc.
2 Test equipment and measurement accuracy
2.1 Test device
Use the matching liquid tank of the test indicator.The liquid tank should be provided with a liquid scale with a scale, and the minimum scale should not be greater than 5
mm, lower limit of liquid scale
Should be higher than the lowest indicated value of the indicator, the upper limit should not be lower than the highest indicated value of the indicator.
2.2 Instrument accuracy
Instrument accuracy should meet the requirements of the test project.
2.3 Test working fluid
2.3.1 Indicator using emulsion as working fluid, using MT
Emulsified oil and neutral soft water specified in 76-83 "Emulsified Oil for Hydraulic Supports"
An emulsion prepared at a weight ratio of 5.95.
2.3.2 Use water as indicator for working fluid.
3 Test method
3.1 Test items
The various tests of the indicator shall be carried out in accordance with the headings specified in the table.
3.2 General requirements
3.2.1 Each test of the indicator shall be carried out in the order shown in the table. The test results of all items met the requirements, and the liquid level indicator was qualified.
3.2.2 No replacement of parts is allowed during the entire test.
3.2.3 The number of measurements of each measurement parameter is not less than 3 times, and the arithmetic average value is taken as the measurement value.
3.3 Accuracy test
3.3.1 Raise the liquid level to the highest value set by the indicator, then lower the liquid level to the lowest value of the indicator, repeat it 5 times, and record its reading.
3.3.2 The highest and lowest readings should be within ± 20mm of the specified range of the highest and lowest level values.
3.3.3 The error when the indicator sends out a signal (or indication) should be within 20mm.
3.4 Continuous action test
Repeat the test 20 times according to the method of paragraph 3.3.1, and each time should meet the requirements of paragraphs 3.3.2 and 3.3.3.
3.5 Switch circuit test
3.5.1 When it is energized for more than 8 hours, the ambient temperature of the switch circuit is still normal when it is 50 ° C.
3.5.2 The amplitude is 5mm and the vibration frequency is 25 times/min. Normal operation after vibration test.
3.5.3 It can still work normally after 48h aging test.
3.6 Insulation resistance test
The test was conducted in accordance with GB 998-82 "Basic Test Methods for Low-Voltage Electrical Apparatus", and it complied with relevant regulations.
3.7 Withstand voltage test
According to GB 998-82
Tests shall be carried out in accordance with 6.3 and shall comply with the relevant regulations.
3.8 Insulation resistance test
According to GB 998-82
Tests shall be carried out in accordance with Article 6.4 and shall comply with the relevant regulations.
3.9 Immunity test
The test was conducted in accordance with Chapter 12 of GB 998-82 and it complied with the relevant regulations.
3.10 Voltage fluctuation test
Test the general requirements for electrical equipment according to coal mining work. When the test voltage is 75 ~ 110% of the rated voltage, the indicator should be able to work normally.
3.11 Explosion test
4 Signal requirements
4.1 When the liquid level reaches the highest or lowest position specified by the design, the indicator light should be on and ring.
4.2 The pump should be stopped when the liquid level reaches the dangerous position specified by the design.
4.3 The indicator light should be on, and the ring time and interval should be adjustable.
Additional information.
This standard is proposed by the Technology Development Department of the Ministry of Coal Industry.
This standard was drafted by the Taiyuan Branch of the Coal Science Research Institute.
The main drafter of this standard is Liu Zhongzhang.
This standard entrusts Taiyuan Branch of Coal Science Research Institute with interpretation.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of MT 92-1984_English be delivered?Answer: Upon your order, we will start to translate MT 92-1984_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 2 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of MT 92-1984_English with my colleagues?Answer: Yes. The purchased PDF of MT 92-1984_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|