|
US$399.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ24978-2010: Performance assessment of fire detection and alarm system Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/Z 24978-2010 | English | 399 |
Add to Cart
|
3 days [Need to translate]
|
Performance assessment of fire detection and alarm system
| Valid |
GB/Z 24978-2010
|
PDF similar to GBZ24978-2010
Basic data | Standard ID | GB/Z 24978-2010 (GB/Z24978-2010) | | Description (Translated English) | Performance assessment of fire detection and alarm system | | Sector / Industry | National Standard | | Classification of Chinese Standard | C81 | | Classification of International Standard | 13.220.20 | | Word Count Estimation | 17,192 | | Date of Issue | 2010-08-09 | | Date of Implementation | 2010-12-01 | | Quoted Standard | GB/T 4718-2006; GB 50116; GB 50166 | | Regulation (derived from) | ?National Standard Approval Announcement 2010 No.3 (Total No.158) | | Issuing agency(ies) | Ministry of Health of the People's Republic of China | | Summary | This standard specifies the automatic fire alarm system products, requirements and methods for the design and operation evaluation. This standard applies to automatic fire reporting system for product performance, evaluate design performance and operational performance. |
GBZ24978-2010: Performance assessment of fire detection and alarm system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Performance assessment of fire detection and alarm system
ICS 13.220.20
C81
People's Republic of China national standardization of technical guidance documents
Performance Evaluation of Automatic Fire Alarm System
Posted on.2010-08-09
2010-12-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Categories 2
5 General requirements 2
6 product evaluation 2
7 Design Evaluation 4
8 Evaluation of the operation 6
Appendix A (informative) Automatic fire alarm system optimization design process 13
Foreword
Automatic fire alarm system is becoming more diverse, the system protection of objects and installation sites are also increasingly complicated, the need for automatic fire alarm system
Scientific evaluation.
This guideline is for reference only. The suggestions and opinions on this technical document are directed to the standardization administration under the State Council
Department reflected.
Appendix A of this Guidance Document is an informative annex.
This instructional technical document was submitted by the Ministry of Public Security of the People's Republic of China.
The guidance of technical documents by the National Fire Standardization Technical Committee fire detection and alarm sub-technical committee (SAC/TC113 /
SC6) centralized.
This guidance is responsible for the drafting of technical documents. Ministry of Public Security Shenyang Institute of Fire.
The guidance of technical documents to participate in the drafting unit. Liaoning Provincial Public Security Fire Corps, Gulf Security Technology Co., Ltd., Xi'an Sheng Purcell Electronics
Limited.
The main drafters of this guidance document are Mei Zhibin, Song Zhen, Song Liwei, Dong Wenhui, Guan Dawei, Chen Guang, Ding Hongjun, Liu Weihua,
Zhang Xiongfei, Gao Yong, Weng Lijian, Wu Binglong, Tian Yongli.
Performance Evaluation of Automatic Fire Alarm System
1 Scope
This Guidance Document provides the requirements and methods for evaluating the product, design and operation of an automatic fire alarm system.
This guideline is applicable to the evaluation of product performance, design performance and operating performance of automatic fire alarm system.
2 Normative references
The following documents contain provisions which, through reference in this Guidance Document, become the provisions of this Guidance Note document. All dated
Reference documents, all subsequent amendments (not including errata content), or revisions do not apply to this guidance document, however, drums
Recipients of the agreement based on this guidance document are encouraged to study whether the latest versions of these documents are applicable. All undated references
The latest version of this document applies to this guidance document.
GB/T 4718-2006 fire alarm equipment terminology
GB 50116 automatic fire alarm system design specifications
GB 50166 automatic fire alarm system construction and acceptance specification
3 Terms and definitions
GB/T 4718-2006 established and the following terms and definitions apply to the guidance of technical documents.
3.1
Subjectiveassessmentmethod
Evaluators for the evaluation system and technical documents, based on actual work experience, in accordance with certain evaluation procedures, all or part of the assessment
Price indicators to make subjective judgments and give the corresponding assessment of the conclusions of the method.
3.2
Objective assessment method
Evaluation personnel through specific tests, simulation tests or simulation calculations, the system or component of the specific evaluation index to make a conclusion
method.
3.3
Spot inspection method spotinspectionmethod
Evaluators through the actual operation of the project site inspection and testing of all or part of the system to evaluate the evaluation indicators to make conclusions
method.
3.4
Check the inspection method checkinspectionmethod
Evaluators for the evaluation system and technical documents, based on relevant national standards, according to a certain evaluation process, all or part of the assessment
Price index to make a conclusion of the evaluation method.
3.5
Equipment integrity rate equipmentavailability
System technical performance intact equipment Taiwan (only) the percentage of total equipment.
3.6
System utilization systemutilization
System controller intact working time and the ratio of working hours.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ24978-2010_English be delivered?Answer: Upon your order, we will start to translate GBZ24978-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GBZ24978-2010_English with my colleagues?Answer: Yes. The purchased PDF of GBZ24978-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|