|
US$639.00 ยท In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 7190.1-2018: Mechanical draft cooling towers -- Part 1: Medium and small open cooling towers Status: Valid GB/T 7190.1: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 7190.1-2018 | English | 639 |
Add to Cart
|
5 days [Need to translate]
|
Mechanical draft cooling towers -- Part 1: Medium and small open cooling towers
| Valid |
GB/T 7190.1-2018
|
| GB/T 7190.1-2008 | English | RFQ |
ASK
|
6 days [Need to translate]
|
Glass fiber reinforced plastic cooling tower -- Part 1: Middle and small glass fiber reinforced plastic cooling tower
| Obsolete |
GB/T 7190.1-2008
|
| GB/T 7190.1-1997 | English | 959 |
Add to Cart
|
6 days [Need to translate]
|
Glass fiber reinforced plastic cooling tower--Part 1: Middle-small type glass fiber reinforced plastic cooling tower
| Obsolete |
GB/T 7190.1-1997
|
| GB/T 7190-1987 | English | RFQ |
ASK
|
3 days [Need to translate]
|
Glass fiber reinforced plastic cooling tower
| Obsolete |
GB/T 7190-1987
|
PDF similar to GB/T 7190.1-2018
Basic data | Standard ID | GB/T 7190.1-2018 (GB/T7190.1-2018) | | Description (Translated English) | Mechanical draft cooling towers -- Part 1: Medium and small open cooling towers | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | Q23 | | Classification of International Standard | 83.120 | | Word Count Estimation | 32,320 | | Date of Issue | 2018-12-28 | | Date of Implementation | 2019-11-01 | | Older Standard (superseded by this standard) | GB/T 7190.1-2008 | | Regulation (derived from) | National Standard Announcement No. 17 of 2018 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 7190.1-2018: Mechanical draft cooling towers -- Part 1: Medium and small open cooling towers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Mechanical draft cooling towers--Part 1. Medium and small open cooling towers
ICS 83.120
Q23
National Standards of People's Republic of China
Replace GB/T 7190.1-2008
Mechanical ventilation cooling tower
Part 1. Small and medium-sized open cooling tower
Part 1. Mediumandsmalopencoolingtowers
Published on.2018-12-28
2019-11-01 implementation
State market supervision and administration
China National Standardization Administration issued
Foreword
GB/T 7190 "Mechanical Ventilation Cooling Tower" is divided into three parts.
--- Part 1. Small and medium-sized open cooling towers;
--- Part 2. Large open cooling towers;
--- Part 3. Closed cooling tower.
This part is the first part of GB/T 7190.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part replaces GB/T 7190.1-2008 "glass fiber reinforced plastic cooling towers Part 1. Small and medium-sized glass fiber reinforced plastics
Cooling Tower".
The main changes in this section compared with GB/T 7190.1-2008 are as follows.
--- The standard name was modified by "Glass fiber reinforced plastic cooling tower Part 1. Small and medium-sized glass fiber reinforced plastic cooling tower"
Mechanical Ventilation Cooling Tower Part 1. Small and Medium Open Cooling Towers;
--- Revised the scope of application, modify the "mixed structure open cooling tower" to "countercurrent, cross flow mechanical ventilation open cooling tower" (see
Chapter 1, Chapter 1 of the.2008 edition);
--- Removed the reference standard for glass fiber reinforced plastic raw and auxiliary materials, increased the structure of fiber reinforced composite pultruded profiles, noise
Reference standards for acoustic measurement correction techniques (see Chapter 2, Chapter 2 of the.2008 edition);
--- Added five terms and definitions such as "mechanical ventilation open cooling tower", deleted the "humidity of wet air" and "nozzle" terminology
Some terms and definitions have been modified (see Chapter 3, Chapter 3 of the.2008 edition);
--- Standard design conditions are modified to standard operating conditions and are classified into standard operating conditions I and standard operating conditions II (see 5.1.1,.2008 edition)
5.1.1);
---The noise index level is changed from ultra low noise, low noise, common type and industrial type to II, III, IV and V, respectively.
Change some indicators and increase the level I noise level (see 5.2, 5.2 of.2008 edition);
--- Increase the energy efficiency rating and divide it into 1st, 2nd, 3rd, 4th and 5th grades according to the power consumption ratio (see 5.3,.2008 edition)
5.3);
--- The drift rate was revised from 0.015% to 0.010% (see 5.4, 5.4 of the.2008 edition);
--- Increased the performance requirements of composite parts such as molded and pultruded profile products, and removed the properties of resin content, curing degree and Barcol hardness
Requirements (see 5.5, 5.5.2, 5.5.3, 5.5.5 for the.2008 edition);
--- Increase the appearance of metal parts and hot dip galvanizing layer requirements, remove the provisions on the handling of embedded parts (see 5.5.2, 5.6 of the.2008 version);
--- Modify the type test and decision rules (see 7.3.3.2, 7.3.3b of the.2008 edition);
--- Increased environmental conditions for use of cooling tower products (see 9.7);
--- The test report is given in the corresponding appendix (see Appendix A, Appendix C, Appendix D, Appendix E, Appendix F, 9.7 of.2008 edition);
--- The calculation method of the cross-flow tower cooling number is modified from the table look-up method to the analytical method (see A.6.4,.2008 edition of A.6.4);
--- Added cooling capacity calculation example (see Appendix B);
--- Revised the power consumption ratio calculation formula (see Appendix E, Appendix D of the.2008 edition).
This part was proposed by the China Building Materials Federation.
This part is under the jurisdiction of the National Fiber Reinforced Plastics Standardization Technical Committee (SAC/TC39).
This section is responsible for drafting units. Beijing FRP Research and Design Institute Co., Ltd., China Institute of Water Resources and Hydropower Research, Shanghai University of Technology,
Tsinghua University, China Architectural Design Institute Co., Ltd.
Participated in the drafting of this section. Jiangsu Seagull Cooling Tower Co., Ltd., Guangzhou Kancent Technology Development Co., Ltd., Shanghai Jinri Cooling
Equipment Co., Ltd., Hunan Yuanheng Technology Co., Ltd., Dalian Sidde Environmental Equipment Co., Ltd., Xinling Air Conditioning (Fogang) Co., Ltd.
Zhejiang Jinling Refrigeration Engineering Co., Ltd., Zhejiang Shangfeng Cooling Tower Co., Ltd., Zhejiang Dongjie Cooling Tower Co., Ltd.
The main drafters of this section. Yin Zheng, Zhao Shun'an, Liu Yunan, Zhang Lichen, Feng Peng, Xu Wenlong.
The previous versions of the standard replaced by this section are.
---GB/T 7190-1987;
---GB/T 7190.1-1997, GB/T 7190.1-2008.
Mechanical ventilation cooling tower
Part 1. Small and medium-sized open cooling tower
1 Scope
This part of GB/T 7190 specifies the product classification and marking, requirements, test methods, inspection rules and standards for small and medium-sized open cooling towers.
Zhi, packaging, transportation, storage and others.
This section is applicable to counter-flow, cross-flow mechanical ventilation open cooling towers with single tower cooling water volume less than 1000m3/h and water-filled packing.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 1449 fiber reinforced plastic bending performance test method
GB/T 2518 continuous hot-dip galvanized steel sheet and strip
GB/T 8924 Fibre reinforced plastics - Determination of burning performance - Oxygen index method
Technical requirements and test methods for hot-dip galvanized coating of GB/T 13912 metal-clad steel parts
GB/T 31539-2015 Structural fiber reinforced composite pultruded profiles
HJ706 Environmental Noise Monitoring Technical Specification Noise Measurement Correction
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Mechanical ventilation open cooling tower mechanicaldraftopenedcoolingtower
A device or device that uses forced air ventilation and direct contact heat exchange between the cooling water and the air to transfer the heat of the cooling water to the atmosphere.
3.2
Filler diameter fildepth
The horizontal packing of each side of the cross-flow cooling tower does not include the horizontal distance between the inlet and outlet sections between the inlet and outlet air.
3.3
Gas-water ratio air/waterratio
The ratio of the mass air flow (kg/h) of the tower to the cooling water mass flow (kg/h).
3.4
Thermal performance curve thermalperformancecurves
Cooling tower cooling number and gas-water ratio curve.
3.5
Standard working conditions
Uniform operating conditions for evaluating cooling tower performance, including tower air dry bulb temperature, wet bulb temperature, atmospheric pressure, tower water temperature, and tower
Water temperature.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 7190.1-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 7190.1-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 7190.1-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 7190.1-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 7190.1-2018?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 7190.1-2018 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|