|
US$419.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 43219-2023: Guidance to the inspection of mechanical sampling systems for moving stream of coal Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 43219-2023 | English | 419 |
Add to Cart
|
4 days [Need to translate]
|
Guidance to the inspection of mechanical sampling systems for moving stream of coal
| Valid |
GB/T 43219-2023
|
PDF similar to GB/T 43219-2023
Basic data | Standard ID | GB/T 43219-2023 (GB/T43219-2023) | | Description (Translated English) | Guidance to the inspection of mechanical sampling systems for moving stream of coal | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | D21 | | Classification of International Standard | 73.040 | | Word Count Estimation | 22,269 | | Date of Issue | 2023-09-07 | | Date of Implementation | 2024-04-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 43219-2023: Guidance to the inspection of mechanical sampling systems for moving stream of coal ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 73.040
CCSD21
National Standards of People's Republic of China
Inspection Guidelines for Mobile Coal Stream Mechanized Sampling System
Published on 2023-09-07
2024-04-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration Committee
Table of contents
PrefaceⅠ
Introduction II
1 Scope 1
2 Normative reference documents 1
3 Terms and Definitions 1
4 General inspection rules 2
4.1 General 2
4.2 Precision check 2
4.3 Bias check 2
4.4 General requirements 2
5 Establishment of inspection procedures 2
5.1 General 2
5.2 External verification3
5.3 Internal verification3
5.4 Run Check 3
6 Inspection Procedure 3
6.1 External verification3
6.2 Internal verification 4
6.3 Run Check 4
7 Quality Control 5
7.1 General 5
7.2 Sampling ratio 5
7.3 Coefficient of variation 5
7.4 Extraction ratio 5
8 Inspection records 8
Appendix A (informative) Example 9 of inspection items for mechanized sampling system
Appendix B (informative) Operation check record example 12
Appendix C (Informative) Sample 15 of Sampling Inspection Records
Appendix D (Normative) Sampling Ratio Control Chart 17
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents.
This document is proposed by the China Coal Industry Association.
This document is under the jurisdiction of the National Coal Standardization Technical Committee (SAC/TC42).
This document was drafted by. Coal Science and Technology Research Institute Co., Ltd.
The main drafters of this document. Pi Zhongyuan, Han Liting, Fu Hao, Mao Guangjian, and He Chengyou.
Introduction
The coal mechanized sampling system mainly includes the moving coal flow mechanized sampling system and the stationary coal mechanized sampling system. However, in the coal machine
There are also problems in the construction and use of mechanized sampling systems, such as improper selection, untimely and irregular performance testing, and failure to detect in time during operation and management.
Problems and other situations affect the normal use and standardized operation of the mechanized sampling system.
The external verification and internal verification specified in this document mainly focus on whether the mechanized sampling system meets the requirements of the corresponding standards and whether it meets the
Inspection and evaluation based on specified operating conditions and design requirements. External verification can help evaluate the compliance, suitability of mechanized sampling systems
Usability and effectiveness; internal verification can help evaluate the effectiveness of the continuous operation of the mechanized sampling system, identify possible problems and improve them; operation
The inspection mainly focuses on the equipment, facilities and samples in all aspects of the entire process before each sampling operation of the mechanized sampling system, during the sampling process and after operation.
Inspection and evaluation of product quality can help discover problems existing in the daily use of mechanized sampling systems, infer the causes of problems and
Improve.
Inspection Guidelines for Mobile Coal Stream Mechanized Sampling System
1 Scope
This document specifies the general inspection principles, establishment of inspection procedures, inspection procedures, quality control and
Inspection records.
This document is applicable to the mobile coal flow mechanized sampling system and the stationary coal mechanized sampling system for reference.
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations
For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to
this document.
GB/T 19494.1 Mechanized coal sampling Part 1.Sampling methods
GB/T 19494.2 Mechanized sampling of coal Part 2.Preparation of coal samples
GB/T 19494.3 Mechanized coal sampling Part 3.Precision determination and bias test
GB/T 30730 Technical conditions for coal mechanized sampling system
3 Terms and definitions
The terms and definitions defined in GB/T 19494.1 and the following apply to this document.
3.1
external auditexternalaudit
Personnel with corresponding professional capabilities and not directly related to the management and operation of the mechanized sampling system to be verified shall conduct inspections of the mechanized sampling system.
Inspection and assessment of compliance with the provisions of corresponding documents and system applicability.
Note. These documents mainly include GB/T 19494.1, GB/T 19494.2, GB/T 19494.3, GB/T 30730, etc.
3.2
internal auditinternalaudit
Technical personnel with corresponding professional abilities who are not responsible for the daily operation of this mechanized sampling system (such as sampling technology managers, technical personnel in charge
personnel, specialized workers, etc.) to inspect and evaluate whether the mechanized sampling system meets the operating specifications and operating conditions specified in the document.
Note. Operating specifications include performance test reports, procedures and work instructions formulated by the operating unit, operation and maintenance operation manuals and instructions provided by the manufacturer, etc.
3.3
Before, during and after each operation of the mechanized sampling system, the operators evaluate the operating conditions of the equipment and facilities in all aspects of the entire process.
and inspection of sampling conditions.
Note. Operators include those responsible for monitoring the operation of the sampling system, sample taking and collection.
3.4
sampling ratio samplingratio
FSR
The mechanized sampling system ultimately retains the ratio of the actual mass of the sample to the amount of coal represented by the sample.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 43219-2023_English be delivered?Answer: Upon your order, we will start to translate GB/T 43219-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 43219-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 43219-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|