|
US$244.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41888-2022: Ships and marine technology - Methodology for ship launching utilizing air bag Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 41888-2022 | English | 244 |
Add to Cart
|
3 days [Need to translate]
|
Ships and marine technology - Methodology for ship launching utilizing air bag
| Valid |
GB/T 41888-2022
|
PDF similar to GB/T 41888-2022
Basic data | Standard ID | GB/T 41888-2022 (GB/T41888-2022) | | Description (Translated English) | Ships and marine technology - Methodology for ship launching utilizing air bag | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | U06 | | Classification of International Standard | 47.020.01 | | Word Count Estimation | 14,126 | | Date of Issue | 2022-10-14 | | Date of Implementation | 2022-10-12 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 41888-2022: Ships and marine technology - Methodology for ship launching utilizing air bag---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Ships and marine technology -- Methodology for ship launching utilizing air bag
ICS 47.020.01
CCSU06
National Standards of People's Republic of China
Ship and Offshore Technology Ship Airbag Launching Process
(ISO 17682.2013, IDT)
Published on 2022-10-12
2022-10-12 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Requirements before the ship is launched2
5 Facilities and equipment requirements 2
6 Ship launching procedure 4
7 Safety measures5
Appendix A (Informative) Airbag Arrangement 6
Appendix B (Informative) Example 8 of Rolling Friction Coefficient (μ) of Typical Airbag
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
This document is equivalent to ISO 17682.2013 "Ship and Offshore Technology Ship Airbag Launching Process".
The following minimal editorial changes have been made to this document.
--- "For example, moving from the slipway to the water's edge" in 3.2 is changed to Note;
--- "Unit is meter" in 3.6 is changed to Note.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed and managed by the National Standardization Technical Committee of Ocean Ships (SAC/TC12).
This document is drafted by. China National Shipbuilding Industry Research Institute of Comprehensive Technology and Economics, Jinan Changlin Airbag Container Factory Co., Ltd., Shanghai Shipping Transport Co., Ltd.
Loss Science Research Institute Co., Ltd.
The main drafters of this document. Zhu Jiashuai, Sun Juxiang, Liu Wei, Li Heng, Wu Zhongdai, Han Bing.
Ship and Offshore Technology Ship Airbag Launching Process
1 Scope
This document specifies general requirements for launching ships with airbags, including, for example, airbags, slides, winches, ship launching procedures and safety measures
Ships and facilities such as facilities.
This document applies to ships that meet the requirements of 4.1 and are launched with airbags.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
ments)
launchingairbags)
Note. GB/T 33487-2017 Ships and Offshore Technology Ship Launching Airbags (ISO 14409.2011, MOD)
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
ship launching shiplaunching
The process of bringing a ship into the water from land to keep the ship afloat.
3.2
shipshifting
The process of moving a ship from one place to another.
Note. For example moving from the slipway to the water's edge.
3.3
slipway
A ramp for launching a ship, including the part that extends into the water.
Note. The part on the shore, including the slipway, is called the main slide, and the part extending into the water is called the secondary slide.
3.4
Before launching, the airbag is inflated to raise the ship. When the bottom of the ship is higher than the pier, the pier is withdrawn, and the airbag is properly deflated so that the ship is seated on the airbag.
process.
3.5
ground anchor
A structure located in front of the slipway and built in the slipway for mooring, the semicircular part above the ground is used to hold the wire rope and tow
ship.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41888-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41888-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 41888-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41888-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|