US$1089.00 · In stock Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40689-2021: Smart city - Technical requirements of management and service platform for device connection Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 40689-2021 | English | 1089 |
Add to Cart
|
8 days [Need to translate]
|
Smart city - Technical requirements of management and service platform for device connection
| Valid |
GB/T 40689-2021
|
PDF similar to GB/T 40689-2021
Basic data Standard ID | GB/T 40689-2021 (GB/T40689-2021) | Description (Translated English) | Smart city - Technical requirements of management and service platform for device connection | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | L70 | Word Count Estimation | 60,693 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 40689-2021: Smart city - Technical requirements of management and service platform for device connection ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Smart city - Technical requirements of management and service platform for device connection
ICS 35.240.01
CCSL70
National Standards of People's Republic of China
Smart city equipment connection management and
Service platform technical requirements
Released on 2021-10-11
2022-05-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Abbreviations 2
5 Overall framework of the platform 3
5.1 Overview 3
5.2 Overall Framework 3
6 Platform function requirements 4
6.1 IoT layer 4
6.2 Data layer 9
6.3 Service layer 11
6.4 Visualization layer 13
6.5 Operation and maintenance management 14
6.6 Security Management 15
7 Platform interface requirements 16
7.1 Interface categories 16
7.2 General interface requirements 16
7.3 Dd interface requirements 16
7.4 Da interface requirements 18
7.5 Dr interface requirements 21
Appendix A (informative) Dd interface example 22
Appendix B (informative) Da interface example 31
Appendix C (informative) Dr interface reference list 56
Reference 57
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents.
This document was proposed and managed by the National Information Technology Standardization Technical Committee (SAC/TC28).
Drafting organizations of this document. Huawei Technologies Co., Ltd., China Electronics Standardization Research Institute, China Electronics Technology New Smart City Research Institute
Co., Ltd., Tencent Cloud Computing (Beijing) Co., Ltd., Beijing Telecom Planning and Design Institute Co., Ltd., Inspur Software Technology Co., Ltd., China Mobile
Xiong'an Information and Communication Technology Co., Ltd., Weifang City Big Data Bureau, Taiji Computer Co., Ltd., and Construction Comprehensive Survey Research and Design Institute have
Co., Ltd., Taihua Wisdom Industry Group Co., Ltd., Shenzhen Longhua District Government Service Data Administration, Shenzhen Tianzhi Information Engineering Consulting
Co., Ltd., Zhong Ruixin Digital Technology Co., Ltd., Beijing Ruicheng Times Information Technology Co., Ltd., Beijing Tsinghua Tongheng Planning and Design Institute
Co., Ltd., Shenzhen Ganwei Software Technology Co., Ltd., Chengdu Qinchuan Internet of Things Technology Co., Ltd., Shandong Computing Center (National Super
Level Computing Jinan Center), China United Network Communications Co., Ltd. Smart City Research Institute, Zhejiang Dahua Technology Co., Ltd., Shandong Provincial Standard
Zhunhua Research Institute, Shenzhen Institute of Standards and Technology, China Electronics Technology Group Corporation Information Science Research Institute, University of Science and Technology of China, Guangzhou
Guangdian Express Financial Electronics Co., Ltd., Nanjing Nanda Smart City Planning and Design Co., Ltd., Zhongxing Technology Co., Ltd.,
Chengdu Zhongke Daqi Software Co., Ltd., Beijing SuperMap Software Co., Ltd.
The main drafters of this document. Corning, Wang Dun, Zhang Hongwei, Cui Hao, Liu Wen, Chen Jiaxi, Li Yun, Liu Xingchuan, Zhou Bo, Peng Gefei, Gao Youjun,
Feng Xiaopeng, Hu Yannian, Feng Xiaomeng, Dong Nan, Zheng Qirong, Kang Liu, Liu Wei, Zhang Guoqiang, Wang Bing, Wang Feifei, Yang Kui, Lu Jing, Zheng Qingguo, Wang Jue,
Zhang Lei, Zhuang Guangxin, Liang Fang, Li Junlan, Li Yongtao, Yu Jing, Wang Shuguang, Bi Jianxiu, Wang Yiqun, Li Cunguo, Xiong Yan, Hong Jiang, Dong Li, Liu Xiaoyong,
Liu Dayang, Wei Dong, Li Min, Jiang Hongyue, Li Shaohua.
Smart city equipment connection management and
Service platform technical requirements
1 Scope
This document gives the overall framework of the smart city equipment connection management and service platform, and specifies the functional requirements and interface requirements.
This document is applicable to the planning, construction, operation and maintenance of smart city equipment connection management and service platform projects.
2 Normative references
The content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 22080-2016 Information Technology Security Technical Information Security Management System Requirements
GB/T 22239-2019 Information Security Technology Network Security Level Protection Basic Requirements
GB 35114-2017 Public Security Video Surveillance Network Information Security Technical Requirements
GB/T 35319-2017 IOT system interface requirements
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Device
Terminals with communication capabilities or gateways with communication capabilities and computing capabilities.
Note. In addition to communication capabilities, the equipment may also have the capabilities of sensing, control, data acquisition, data storage, data processing, and data encryption.
3.2
Smart city equipment connection management and service platform smartcitymanagementandserviceplatformfordeviceconnec-
tion
An information system that realizes the integration and openness of smart city equipment and industry applications. It provides multiple lines through different communication protocols and open interfaces.
Industry equipment (3.1) connection management, data management functions, provide data and service support capabilities for industry applications.
3.3
Thing-model
An object model that abstractly describes the attributes, states, and functions of equipment (3.1).
3.4
Edgemanagement
A distributed computing that provides management functions for perception, transmission, and decision-making at the edge of the network.
Note. The management function can occur on the edge side or close to the edge side, and its proximity is determined by the needs of the system.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40689-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 40689-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 40689-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40689-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|