US$199.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36011-2018: Sampling check and routine test method for programmable controllers Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 36011-2018 | English | 199 |
Add to Cart
|
3 days [Need to translate]
|
Sampling check and routine test method for programmable controllers
| Valid |
GB/T 36011-2018
|
PDF similar to GB/T 36011-2018
Basic data Standard ID | GB/T 36011-2018 (GB/T36011-2018) | Description (Translated English) | Sampling check and routine test method for programmable controllers | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | N10 | Classification of International Standard | 25.040 | Word Count Estimation | 10,182 | Date of Issue | 2018-03-15 | Date of Implementation | 2018-10-01 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 36011-2018: Sampling check and routine test method for programmable controllers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Sampling check and routine test method for programmable controllers
ICS 25.040
N10
National Standards of People's Republic of China
Programmable controller sampling inspection and routine test methods
Published by.2018-03-15
2018-10-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Administration released
Directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Sampling and routine test requirements 1
4.1 Sample Inspection Requirements 1
4.2 Routine Test Requirements 1
5 Sample Inspection Implementation Rule 2
6 Sampling and routine tests 2
6.1 Sampling inspection 2
6.2 Routine Test 3
7 Sampling check and routine test summary 3
Reference 5
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by China Machinery Industry Federation.
This standard is under the jurisdiction of the National Industrial Process Measurement, Control, and Automation Standardization Technical Committee (SAC/TC124).
This standard was drafted by. Institute of Instrumental Technology, Institute of Mechanical Technology, Liaoning University, Shenyang Institute of Automation, Chinese Academy of Sciences
Institute of Technology, Beijing and Lishi System Engineering Co., Ltd., Zhejiang Institute of Control Research Co., Ltd., Central South University, Beijing Dingshi Innovation Technology Co., Ltd.,
Rockwell Automation (China) Co., Ltd. and Schneider Electric (China) Co., Ltd.
The main drafters of this standard are. Wang Linxuan, Xu Yidong, Song Yan, Xu Degang, Lei Zhijun, Li Hongwei, Peng Guomao, Hua Wei, Wang Yong, and Yan Xiaofeng.
Zheng Qiuping, Shi Baoku.
Programmable controller sampling inspection and routine test methods
1 Scope
This standard specifies the sampling and inspection of the programmable controller's climate and environment adaptability, mechanical environment adaptability, and electromagnetic environment adaptability.
Methods, and routine test methods such as appearance, identification, input/output functions, communications, and electrical safety.
This standard applies to sampling inspection and routine testing of the programmable controller before leaving the factory.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 13264-2008 Sampling procedures and sampling tables for small batches of defective products
GB/T 15969.2-2008 programmable logic controller part 2. equipment requirements and testing
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Routine test routinetest
The equipment is tested according to the specified requirements before leaving the factory.
3.2
Test procedure testprocedure
Before the test, the test to be carried out and the test conditions to be carried out jointly prepared by the manufacturer, the tester and the buyer (user)
statement.
4 Sampling and routine test requirements
4.1 Sample Inspection Requirements
Sampling tests are conducted for environmental suitability.
Environmental adaptability tests include climate environment adaptability, mechanical environment adaptability and electromagnetic environment adaptability. Climate and environment adaptability requirements
Including. high temperature, low temperature, temperature cycle, temperature shock, alternating damp heat, etc.; mechanical environment adaptability requirements include. vibration, impact, drop, etc.; electromagnetic
Environmental adaptability requirements include. emission limits, electrostatic discharge immunity, radio frequency electromagnetic field radiation immunity, electrical fast burst immunity, surges
Impact immunity, induced disturbance immunity of the RF field, voltage dips, short interruptions, and voltage changes.
4.2 Routine test requirements
4.2.1 Basic Routine Test Requirements
Check the appearance, product information, packaging, product identification, product consistency, and material compatibility.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36011-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36011-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 36011-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36011-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|