HOME   Cart(1)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 21663-2019 English PDF

US$519.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 21663-2019: Specific requirements for small capacity cylindrical rotor synchronous machines
Status: Valid

GB/T 21663: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 21663-2019English519 Add to Cart 5 days [Need to translate] Specific requirements for small capacity cylindrical rotor synchronous machines Valid GB/T 21663-2019
GB/T 21663-2008English759 Add to Cart 4 days [Need to translate] Specific requirements for small capacity cylindrical rotor synchronous machines in energy save and environment protection projects Obsolete GB/T 21663-2008

PDF similar to GB/T 21663-2019


Standard similar to GB/T 21663-2019

GB/T 24625   GB/T 15548   GB/T 24625   GB/T 12974.2   

Basic data

Standard ID GB/T 21663-2019 (GB/T21663-2019)
Description (Translated English) Specific requirements for small capacity cylindrical rotor synchronous machines
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K21
Classification of International Standard 29.160.20
Word Count Estimation 26,222
Date of Issue 2019-10-18
Date of Implementation 2020-05-01
Older Standard (superseded by this standard) GB/T 21663-2008
Quoted Standard GB/T 191; GB/T 755; GB/T 1029; GB/T 6075.1; GB/T 7064; GB/T 10069.1; GB/T 10585; GB/T 11348.1; GB/T 20160; GB/T 20835; GB 50150; JB/T 6204; JB/T 7784; JB/T 8446; JB/T 8991
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration
Summary This standard specifies the general requirements and technical requirements for small-capacity hidden pole synchronous generators. This standard is applicable to 50Hz small-capacity three-phase hidden pole synchronous generators with a capacity of 10MVA and below, and is a supplement to GB/T 755. For motors with a rated frequency of 60Hz, please refer to the implementation.

GB/T 21663-2019: Specific requirements for small capacity cylindrical rotor synchronous machines

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specific requirements for small capacity cylindrical rotor synchronous machines ICS 29.160.20 K21 National Standards of People's Republic of China Replace GB/T 21663-2008 Technical requirements for small-capacity hidden-pole synchronous generators Published on.2019-10-18 2020-05-01 implementation State market supervision and administration China National Standardization Administration issued

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General requirements 2 4.1 General 2 4.2 Specifications, Series 2 4.3 Motor Ventilation Cooling Type 2 4.4 Conditions of Use 2 4.5 Temperature rise and temperature limit of each part of the motor 3 5 Technical requirements 3 5.1 rated condition 3 5.2 rated voltage 3 5.3 Power factor 3 5.4 rated speed 3 5.5 Voltage and frequency changes during operation 3 5.6 Direction of rotation and phase sequence 4 5.7 stator winding connection, output voltage 4 5.8 Excitation mode and requirements for excitation system 4 5.9 Motor insulation 4 5.10 Prevention of shaft current 5 5.11 Overspeed test 5 5.12 Critical speed 5 5.13 Output Figure 5 5.14 Unbalanced load 6 5.15 Noise 6 5.16 Stator overcurrent 7 5.17 Rotor overcurrent 7 5.18 Sudden short circuit 7 5.19 Short circuit ratio 7 5.20 Direct-axis transient reactance (X'd) and straight-axis transient transient reactance (X′′d) 7 5.21 Short-circuit ratio, direct-axis transient reactance, tolerance of straight-axis super-transient reactance 7 5.22 Number of mechanical starts of the rotor 8 5.23 Requirements for Exciter 8 5.24 short-time boost voltage test 8 5.25 Vibration limit 8 5.26 Irregularity of Voltage Waveforms Total Harmonic Distortion (THD) 8 5.27 stator winding three-phase DC resistance allowable deviation 8 5.28 cooler 9 5.29 Bearing oil temperature and bearing temperature limit 9 5.30 Checking the temperature of each part of the generator 9 5.31 Grid 9 5.32 Asynchronous operation 10 5.33 Loss of Magnetic Operation 10 5.34 Test inspection items and acceptance rules 10 5.35 Nameplate, production number 11 5.36 Packing, transport, storage and maintenance 12 5.37 Complete supply range 12 5.38 Spare parts and spare parts 12 5.39 Random installation drawings and technical documents 12 5.40 Basic Requirements for Motor Design Information 12 5.41 Warranty period 12 5.42 Reliability 13 Appendix A (Normative) Synchronous generator withstand voltage test limits and temperature rise limits 14 Appendix B (informative) Complete supply range 15 Appendix C (informative) Spare parts and spare parts 16 Appendix D (informative) Random installation drawings and technical documents 17 Appendix E (informative) The basic requirements information required by the purchaser, prime mover and motor supplier when ordering 18

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard replaces GB/T 21663-2008 "Small-capacity energy-saving and environmentally-friendly hidden-pole synchronous generator technical requirements", and GB/T 21663- Compared to.2008, the main technical changes are as follows. --- Revised the efficiency rating of some generators (see Chapter 4, Chapter 4 of the.2008 edition); --- Increased corona test requirements (see Chapter 5); --- Increased rotor overcurrent requirements (see Chapter 5); --- Increased grid-connected, asynchronous operation requirements (see Chapter 5); --- Increased maintenance measures during long-term downtime (see Chapter 5); --- Increased the basic requirements information required by the purchaser, prime mover and generator supplier when ordering (see Appendix E). This standard was proposed by the China Electrical Equipment Industry Association. This standard is under the jurisdiction of the National Large Generator Standardization Technical Committee (SAC/TC511). This standard was drafted. Shandong Qilu Motor Manufacturing Co., Ltd. (Shandong Jinan Power Equipment Co., Ltd.), Huadian Electric Power Research Northeast Branch of Harbin Institute Co., Ltd., Harbin Electric Machinery Research Institute, Nanjing Steam Turbine Motor (Group) Co., Ltd., Hangzhou Hangfa Power Generation Equipment Co., Ltd., Dongfang Electric Group Dongfeng Motor Co., Ltd., Luoyang Zhongzhong Power Equipment Co., Ltd., Beijing Beizhong Steam Turbine Co., Ltd. Responsible company, Shanghai Electric Power Equipment Co., Ltd. Shanghai Generator Factory, Shandong Electric Power Engineering Consulting Institute Co., Ltd., Lanzhou Electric Co., Ltd. Limited company, Wolong Electric Nanyang Explosion-proof Group Co., Ltd., Harbin Electric Machinery Co., Ltd., Dongfang Electric Group Dongfang Motor has Limited company, State Grid Shandong Electric Power Company Electric Power Research Institute, Guangzhou Qizhi Electric Automation Co., Ltd. The main drafters of this standard. Zhang Zhonghai, Li Lin, Wang Jianjun, Xue Shoudong, Sun Yutian, Jiang Xinglin, Wang Yuhua, Guo Jian, Zhang Genxian, Li Qing, Wei Yanfei, Fu Wei, Gao Xiaohui, Wu Xuandong, Jiao Xiaoxia, Li Jixia, Sun Shumin, He Wenwei, Zhou Wei. The previous versions of the standards replaced by this standard are. ---GB/T 21663-2008. Technical requirements for small-capacity hidden-pole synchronous generators

1 Scope

This standard specifies the general requirements and technical requirements for small-capacity hidden-pole synchronous generators. This standard is applicable to 50Hz small-capacity three-phase hidden-pole synchronous generators with a capacity of 10MVA and below. It is a supplement to GB/T 755. Charge. For motors with a rated frequency of 60 Hz, refer to the implementation.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 191 packaging storage and transportation icon GB/T 755 rotary motor rating and performance GB/T 1029 three-phase synchronous motor test method GB/T 6075.1 Mechanical vibrations - Evaluation of vibrations of machines - Part 1 . General GB/T 7064 hidden pole synchronous generator technical requirements GB/T 10069.1 Determination of noise and noise - Part 1 GB/T 10585 Basic technical requirements for excitation systems for small and medium-sized synchronous motors GB/T 11348.1 Measurement and evaluation of radial vibrations of rotating shafts - Part 1. General GB/T 20160 Rotating Motor Insulation Resistance Test GB/T 20835 Generator Stator Core Magnetization Test Guide GB 50150 Electrical installation engineering electrical equipment handover test standard JB/T 6204 high voltage AC motor stator coil and winding insulation withstand voltage test specification JB/T 7784 Turbine Synchronous Generator AC Exciter Technical Conditions JB/T 8446 hidden pole synchronous generator rotor turn-to-turn short circuit determination method JB/T 8991 Generator Tin Weld Head Detection Method

3 Terms and definitions

The following terms and definitions defined in GB/T 755 apply to this document. 3.1 Small-capacity hidden-pole synchronous generator smalcapacitycylindricalrotorsynchronousmachines The capacity is 10MVA and below, mainly used for urban central heating, cogeneration, surplus (waste) thermal power generation, blast furnace gas residual pressure turbine Small 2-pole on energy-saving and environmental protection projects for comprehensive energy utilization such as electricity (TRT), biomass power generation, and gas-steam combined cycle power generation Hidden pole synchronous generator. 3.2 Mechanical start mechanicalstart The process in which the rotor speed is increased from zero or low speed (usually the crank speed) to the rated speed.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 21663-2019_English be delivered?

Answer: Upon your order, we will start to translate GB/T 21663-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 21663-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 21663-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 21663-2019?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 21663-2019 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.