HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB 18599-2020 PDF English

US$200.00 · In stock · Download in 9 seconds
GB 18599-2020: Standard for pollution control on the non-hazardous industrial solid waste storage and landfill
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB 18599: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB 18599-2020English200 Add to Cart 0-9 seconds. Auto-delivery Standard for pollution control on the non-hazardous industrial solid waste storage and landfill Valid
GB 18599-2001English70 Add to Cart 0-9 seconds. Auto-delivery [Including 2013XG1] Standard for pollution control on the storage and disposal site for general industrial solid wastes Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB 18599-2020
      

Similar standards

GB 20952   GB 18483   GB 16297   GB 45841   

GB 18599-2020: Standard for pollution control on the non-hazardous industrial solid waste storage and landfill


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB18599-2020
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS Replacing GB 18599-2001 Standard for Pollution Control on the Non-hazardous Industrial Solid Waste Storage and Landfill This electronic version is a release draft. Please refer to the official standard published by China Environment Publishing Group Issued on. NOVEMBER 26, 2020 Implemented on. JULY 1, 2021 Issued by. Ministry of Ecology and Environment of the People’s Republic of China; State Administration for Market Regulation.

Table of Contents

Foreword... 3 1 Scope... 5 2 Normative References... 5 3 Terms and Definitions... 6 4 Requirements for Site Selection of Storage and Landfill Facilities... 8 5 Technical Requirements for Storage and Landfill Facilities... 9 6 Admission Requirements... 11 7 Operation Requirements for Storage and Landfill Facilities... 12 8 Pollution Control Requirements for Mining with Backfilling and Backfilling... 13 9 Requirements for Closure and Land Reclamation... 14 10 Requirements for Pollutant Monitoring... 15 11 Implementation and Supervision... 18 Appendix A (informative) Description of Single Composite Liner System... 19

Foreword

In order to implement the laws and regulations, such as. Environmental Protection Law of the People’s Republic of China, Law of the People’s Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste, Law of the People’s Republic of China on the Prevention and Control of Water Pollution, Law of the People’s Republic of China on the Prevention and Control of Air Pollution, Law of the People’s Republic of China on the Prevention and Control of Soil Pollution, etc., prevent and control environmental pollution, improve the quality of the ecological environment, and promote the advancement of non- hazardous industrial solid waste storage and landfill technology, this Standard is formulated. This Standard specifies the environmental protection requirements for the site selection, construction, operation, closure, land reclamation and other processes of non-hazardous industrial solid waste storage and landfill facilities, the environmental protection requirements for the mining with backfilling and backfilling of non-hazardous industrial solid waste that replaces storage and landfill disposal, as well as monitoring requirements, implementation and supervision, etc. This Standard is mandatory. This Standard was first published in 2001.This is the first revision. The main content of this revision. ---The title of the Standard is modified into Standard for Pollution Control on the Non- hazardous Industrial Solid Waste Storage and Landfill; ---The definition of non-hazardous industrial solid waste storage facility and landfill is clarified; ---The definition of Class I and Class II non-hazardous industrial solid waste is clarified; ---The requirements for the site selection of non-hazardous industrial solid waste storage facility and landfill are refined; ---The technical requirements for pollution control on the mining with backfilling and backfilling of non-hazardous industrial solid waste are added; ---The technical requirements for pollution control on the non-hazardous industrial solid waste storage facility and landfill during the operation, closure and later management are improved; ---The technical requirements for pollution control on the land reclamation of non- hazardous industrial solid waste storage facility and landfill are added. Appendix A of this Standard is informative. The pollutant emission limit specified in this Standard is the basic requirement. For air and water pollutant control items that are not specified in this Standard, provincial people’s governments may formulate local pollutant emission standards; for air and water pollutant control items that are specified in this Standard, local pollutant emission standards that are more rigorous than this Standard may be formulated. The Department of Solid Waste and Chemicals and the Department of Regulations and Standards of the Ministry of Ecology and Environment organized the formulation of this Standard. The main drafting organizations of this Standard. Chinese Research Academy of Environmental Sciences; Shanghai Jiao Tong University; CECEP CleanTech Development Co., Ltd.; Solid Waste and Chemical Management Technology Center of the Ministry of Ecology and Environment. This Standard was approved by the Ministry of Ecology and Environment on November 26, 2020. This Standard shall be implemented from July 1, 2021.From the date of implementation of this Standard, Standard for Pollution Control on the Storage and Disposal Site for General Industrial Solid Wastes (GB 18599-2001) shall be abolished. Each locality may implement this Standard in advance with the approval of the provincial people’s governments in accordance with the local ecological and environmental protection demands, and economic and technical conditions. This Standard shall be interpreted by the Ministry of Ecology and Environment. Standard for Pollution Control on the Non-hazardous Industrial Solid Waste Storage and Landfill

1 Scope

This document specifies the environmental protection requirements for the site selection, construction, operation, closure, land reclamation and other processes of non-hazardous industrial solid waste storage and landfill facilities, the environmental protection requirements for the mining with backfilling and backfilling of non-hazardous industrial solid waste that replaces storage and landfill disposal, as well as monitoring requirements, implementation and supervision, etc. This Standard is applicable to the pollution control and environmental management of the site selection, construction, operation, closure and land reclamation of newly constructed, reconstructed and expanded non-hazardous industrial solid waste storage and landfills facilities, the pollution control and environmental management of the operation, closure and land reclamation of existing non-hazardous industrial solid waste storage and landfill facilities, as well as the pollution control and environmental management of the mining with backfilling and backfilling of non-hazardous industrial solid waste that replaces storage and landfill disposal. If special national environmental protection standards are issued for specific non-hazardous industrial solid waste storage and landfill, the special environmental protection standards shall be implemented during the storage and landfill processes. This Standard does not apply to the pollution control in the process of storing non-hazardous industrial solid waste in warehouses and packaging tools (cans, barrels and packaging bags, etc.). The storage process shall satisfy the corresponding environmental protection requirements, such as. seepage prevention, rain prevention and dust prevention, etc.

2 Normative References

The following documents are indispensable to the application of this Standard. In terms of references with a specified date, only versions with a specified date are applicable to this document. In terms of references without a specified date, the latest version (including all the modifications) is applicable to this document. GB 8978 Integrated Wastewater Discharge Standard GB 12348 Emission Standard for Industrial Enterprises Noise at Boundary GB 14554 Emission Standards for Odor Pollutants GB 15562.2 Graphical Signs for Environmental Protection Solid Waste Storage (disposal) Site GB 15618 Soil Environmental Quality - Risk Control Standard for Soil Contamination of Agricultural Land GB 16297 Integrated Emission Standard of Air Pollutants GB 16889 Standard for Pollution Control on the Landfill Site of Municipal Solid Waste GB 36600 Soil Environmental Quality - Risk Control Standard for Soil Contamination of Development Land GB/T 14848 Standard for Groundwater Quality GB/T 15432 Ambient Air - Determination of Total Suspended Particulates - Gravimetric Method

3 Terms and Definitions

3.1 non-hazardous industrial solid waste Industrial solid waste generated by enterprises in the industrial production process and not classified as hazardous waste. 3.2 storage The activity of temporarily placing solid waste in a specific facility or location. 3.3 landfill The activity of placing solid waste in landfills that comply with the provisions and requirements on environmental protection. 3.7 class II non-hazardous industrial solid waste Non-hazardous industrial solid waste with the concentration of one or more characteristic pollutants in the leachate obtained in accordance with the method specified in HJ 557 exceeding the maximum allowable emission concentration in GB 8978 (the maximum allowable emission concentration of Class II pollutants shall implement Level-1 standard), and a pH value beyond the range of 6 ~ 9. 3.8 class I non-hazardous industrial solid waste storage and landfill facility Non-hazardous industrial solid waste storage and landfill facility that can accept the various types of non-hazardous industrial solid waste specified in 6.1 of this Standard and comply with the relevant technical requirements for pollution control in this Standard. 3.10 mining with backfilling In order to satisfy the demands of mining technology, and for the purpose of supporting surrounding rock, preventing rock movement, and controlling ground pressure, the activity of filling the goaf by utilizing non-hazardous industrial solid waste as the filling material. 3.11 backfilling In projects such as reclamation, landscape restoration, construction land leveling, agricultural land leveling, and landform protection to prevent surface subsidence, for the purpose of land reclamation, the activity of utilizing non-hazardous industrial solid waste to replace soil, sand, stone and other production materials to fill underground goal spaces, open-pit mining surface excavation areas, borrow pits, underground mining subsidence areas and natural potholes. 3.12 native foundation The undisturbed rock and soil layer located under the anti-seepage liner.

4 Requirements for Site Selection of Storage and Landfill

Facilities 4.1 The site selection of non-hazardous industrial solid waste storage and landfill facilities shall comply with the requirements of laws and regulations on environmental protection, and relevant statutory planning. 4.5 The storage and landfill facilities shall not be located in rivers, lakes, canals, channels, beaches and bank slopes below the highest water level of reservoirs, as well as within the submerged areas and protected areas of artificial water storage facilities, for example, reservoirs in national and local long-term planning. 4.6 The above provisions on site selection do not apply to the mining with backfilling and backfilling of non-hazardous industrial solid waste.

5 Technical Requirements for Storage and Landfill Facilities

5.1 General Provisions 5.1.1 In accordance with different technical requirements for pollution control on construction, operation and closure, etc., the storage and landfill facilities are classified into Class I and Class II facilities. 5.1.2 The flood control standards of the storage and landfill facilities shall be designed in accordance with the flood level with a recurrence interval of not less than 50 years, unless the national standards have proposed higher requirements. 5.1.3 Generally speaking, the storage and landfill facilities shall include the following units. 5.1.4 The construction schemes for the storage and landfill facilities shall include construction quality assurance and construction quality control, clarify environmental protection clauses and responsibilities, and serve as the basis for environmental protection acceptance upon completion of the project. Meanwhile, they may also be used as the main content of construction environmental supervision. 5.1.8 For non-hazardous industrial solid waste with properties similar to domestic waste generated in activities that provide services for daily life, such as. food manufacturing, textile clothing and apparel industry, paper making and paper products industry, agricultural and sideline food processing industry, etc., as well as non-hazardous industrial solid waste (except coal gangue) with an organic matter content exceeding 5%, the direct storage and landfill disposal shall comply with the requirements of GB 16889. 5.2 Technical Requirements for Class I Non-hazardous Industrial Solid Waste Storage and Landfill Facilities 5.3 Technical Requirements for Class II Non-hazardous Industrial Solid Waste Storage and Landfill Facilities 5.3.1 Class II non-hazardous industrial solid waste storage and landfill facilities shall adopt a single composite liner system as the anti-seepage liner and comply with the following technical requirements. 5.3.2 The surface of the foundation layer of Class II non-hazardous industrial solid waste storage and landfill facilities shall be kept at a distance of more than 1.5 m from the annual highest groundwater level. When the distance between the surface of the foundation layer of Class II non-hazardous industrial solid waste storage and landfill facilities and the annual highest groundwater level is less than 1.5 m, a groundwater drainage system shall be constructed. The groundwater drainage system shall ensure that the groundwater level is maintained 1.5 m below the surface of the foundation layer during the operation period of Class II non-hazardous industrial solid waste storage and landfill facilities.

6 Admission Requirements

6.1 Non-hazardous industrial solid waste entering Class I non-hazardous industrial solid waste storage and landfill facilities shall simultaneously satisfy the following requirements. 6.3 Non-hazardous industrial solid waste specified in 5.1.8 can only be stored and landfilled in Class II non-hazardous industrial solid waste storage and landfill facilities after being treated and satisfying the requirements of 6.2. 6.4 Incompatible non-hazardous industrial solid waste shall set up different partitions for storage and landfill operations.

7 Operation Requirements for Storage and Landfill Facilities

7.1 Before the storage and landfill facilities are put into operation, enterprises shall formulate an emergency plan for environmental emergencies or formulate a special chapter of environmental emergency plan in the emergency plan to explain various possible environmental emergency scenarios and emergency response measures. 7.2 The storage and landfill facilities shall develop operation plans, and operation management personnel shall regularly participate in enterprise on-the-job training. 7.4 The graphical signs for the environmental protection of the storage and landfill facilities shall comply with the provisions of GB 15562.2 and shall be regularly inspected and maintained. 7.5 The storage and landfill facilities that may easily generate dust shall take effective dust suppression measures, such as. zoning operations, covering and water sprinkling, etc., to prevent dust pollution. Tailings ponds shall take measures, such as. uniform ore drawing and water sprinkling, etc. to prevent dust pollution from dry beaches. 7.6 Pollutant emission control requirements

8 Pollution Control Requirements for Mining with Backfilling and Backfilling

8.1 For Class I non-hazardous industrial solid waste, the mining with backfilling or backfilling operation can be performed in accordance with the following ways. 8.2 For Class II non-hazardous industrial solid waste, as well as Class I non-hazardous industrial solid waste that does not comply with the mining with backfilling or backfilling ways in 8.1, before the mining with backfilling or backfilling activity, an environmental background survey shall be carried out. In addition, in accordance with the relevant standards, for example, 8.3 No other solid waste other than additives required for the mining with backfilling operation shall be added to the filling materials. 8.4 After the backfilling operation of non-hazardous industrial solid waste is completed, land reclamation shall be immediately implemented (except underground backfilling), and land reclamation shall comply with the provisions of 9.9 of this Standard. 8.5 For non-hazardous industrial solid waste with properties similar to domestic waste generated in activities that provide services for daily life, such as.

9 Requirements for Closure and Land Reclamation

9.1 When the service period of the storage and landfill facilities expires or they no longer assume new storage and landfill tasks, closure operation shall be initiated within 2 years, and corresponding pollution prevention and control measures shall be taken to prevent environmental pollution and ecological damage. The closure plan can be implemented in phases. The closure time and process of tailings ponds shall also comply with the relevant administrative regulations and management regulations on closure. 9.5 After closure, it is still necessary to maintain and manage the covering layer, so as to prevent uneven settlement and cracking of the covering layer. 9.6 Markers shall be set up in the storage and landfill facilities after closure to indicate the closure time and matters that shall be paid attention to when using the land. 9.7 After closure, the leachate treatment system and wastewater discharge monitoring system shall continue to normally operate, until no leachate is generated for 2 consecutive years or the leachate generated can be stably discharged and up to standards without treatment. 9.8 After closure, if the non-hazardous industrial solid waste needs to be mined and re-utilized, an environmental impact assessment shall be conducted. 9.10 Once a historical storage facility of non-hazardous industrial solid waste has been assessed to ensure that the environmental risks are acceptable, closure or land reclamation operations can be carried out. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB 18599-2020 be delivered?

Answer: The full copy PDF of English version of GB 18599-2020 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB 18599-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB 18599-2020_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB 18599-2020 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB 18599-2020?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 18599-2020 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB 18599-2020?

A step-by-step guide to download PDF of GB 18599-2020_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB 18599-2020".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9