HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 13539.4-2016 English PDF

US$874.00 · In stock
Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 13539.4-2016: Low-voltage fuses -- Part 4: Supplementary requirements for fuse-links for the protection of semiconductor devices
Status: Valid

GB/T 13539.4: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 13539.4-2016English874 Add to Cart 7 days [Need to translate] Low-voltage fuses -- Part 4: Supplementary requirements for fuse-links for the protection of semiconductor devices Valid GB/T 13539.4-2016
GB/T 13539.4-2009EnglishRFQ ASK 4 days [Need to translate] Low-voltage fuses -- Part 4: Supplementary requirements for fuse-links for the protection of semiconductor devices Obsolete GB/T 13539.4-2009
GB/T 13539.4-2005English959 Add to Cart 4 days [Need to translate] Low voltage fuses -- Part 4: the requirements of the protection of semiconductor devices fuse supplement Obsolete GB/T 13539.4-2005
GB 13539.4-1992English719 Add to Cart 5 days [Need to translate] Low-voltage fuses Supplementary requirements for fuse-links for the protection of semiconductor devices Obsolete GB 13539.4-1992

PDF similar to GB/T 13539.4-2016


Standard similar to GB/T 13539.4-2016

GB/T 14048.5   GB/T 14048.6   GB 16916.1   GB/T 13539.7   GB/T 13539.6   GB/T 13539.5   

Basic data

Standard ID GB/T 13539.4-2016 (GB/T13539.4-2016)
Description (Translated English) Low-voltage fuses -- Part 4: Supplementary requirements for fuse-links for the protection of semiconductor devices
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K31
Classification of International Standard 29.120.50
Word Count Estimation 44,447
Date of Issue 2016-04-25
Date of Implementation 2016-11-01
Older Standard (superseded by this standard) GB/T 13539.4-2009
Quoted Standard IEC 60269-1-2006; IEC 60269-2-2006; IEC 60269-3; IEC 60417; ISO 3
Adopted Standard IEC 60269-4-2012, IDT
Regulation (derived from) National Standard Announcement No
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard applies to fuse-links mounted on equipment with a semiconductor device which is suitable for circuits whose nominal voltage does not exceed 1000V AC or 1500V DC. If applicable, can also be used for higher nominal voltage circuits.

GB/T 13539.4-2016: Low-voltage fuses -- Part 4: Supplementary requirements for fuse-links for the protection of semiconductor devices


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Low-voltage fuses.Part 4. Supplementary requirements for fuse-links for the protection of semiconductor devices ICS 29.120.50 K31 National Standards of People's Republic of China Replacing GB/T 13539.4-2009 Low voltage fuses Part 4. fuse for protection of semiconductor equipment The supplementary requirements Low-voltagefuses- Part 4. Supplementaryrequirementsforfuse-linksfortheprotectionof (IEC 60269-4..2012, IDT) 2016-04-25 release.2016-11-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People 's Republic of China China National Standardization Management Committee released Directory Preface I 1 General 1 2 terms and definitions 2 3 normal working conditions 2 4 Classification 4 5 Fuse Features 4 6 logo 7 7 Design of the standard conditions 8 8 Test 8 Appendix AA (informative) Guidelines for the coordination of fuse links and semiconductor equipment APPENDIX BB (Normative Appendix) The manufacturer shall use the fuse for the protection of semiconductor equipment listed in the product manual (sample) Of the information Appendix CC (Normative Appendix) Example of Standardized Fuse for Semiconductor Equipment Protection Reference 39

Foreword

GB 13539 "Low-voltage fuses" currently includes the following six parts. - Part 1. Basic requirements; - Part 2. Supplementary requirements for fuses used by full-time personnel (mainly for industrial fuses) Standardized fuse system display Examples A to K; - Part 3. Supplementary requirements for fuses used by unskilled personnel (mainly for fuses for household and similar purposes) Standardization Fuse System Examples A to F; - Part 4. Supplementary requirements for fuse - links for the protection of semiconductor equipment; - Part 5. Application guidelines for low - voltage fuses; Part 6. Supplementary requirements for fuse - links for the protection of solar photovoltaic systems. This section is part 4 of GB 13539. This part is drafted in accordance with the rules given in GB/T 1.1-2009. Replacement of GB/T 13539.4-2009 "Low-voltage fuses" Part 4. Supplement to fuse-links for the protection of semiconductor equipment begging". The main technical changes in this part compared to GB/T 13539.4-2009 are as follows. --- increase VSI (voltage source inverter) content, including VSI characteristics, technical requirements and test methods; --- Table 101 "Conventional time and convention of" gR "and 'gS' type fuse-links", "gR" type No fusing current Inf From 1.1In Changed to 1.13In; - Table 102 "complete test list" deleted the exchange No. 6 ~ No.10 test, added VSINo.21 test, and footnote a Modified as "if the ambient air temperature between 10 ℃ and 30 ℃, arc I2t characteristics of effective"; --- Table 103 "The same fuse-fuse series of the smallest rated current fuse test list" deleted the exchange No.6 test and DC No.11 test; --- 8.4.3.6 "Indicator device and impactor (if any) action" increase "indicates the performance and performance of the device or impactor verified by the manufacture Plant and user consultation "; --- the original table 106 "verify the AC cut-off current, I2t characteristics and arc voltage characteristics of the test parameters" deleted, changed to the new table 106 "VSI fuse breaking capacity test parameters"; --- Appendix CC "CC.3B Bolt Connection Fuse System - DIN" and "CC.5A Contact Chip Fuse System" Increased the "gR 'and' gS 'fuse-type fuse time and the agreed current" table; - Appendix CC North American fuse-link system increases the recovery voltage requirements of the breaking capacity test; --- Appendix CC Added French B-type cylindrical cap fuse system. This part uses the translation method equivalent to the use of IEC 60269-4..2012 "Low-voltage fuses Part 4. Semiconductor device protection fuse Supplementary requirements ". In this part of the normative reference to the international documents have a consistent correspondence between the following documents. --- GB/T 321-2005 priority and priority series (ISO 3. 1973, IDT); GB/T 5465.2-2008 Graphical symbols for electrical equipment - Part 2. Graphical symbols (IEC 60417DB..2007, IDT); Low - voltage fuses - Part 1. Basic requirements (IEC 60269-1..2009, IDT); GB/T 13539.2-2015 Low-voltage fuses Part 2. Supplementary requirements for fuses used by professionals (mainly Industrial Fuses) Standardized Fuse System Examples A to K (IEC 60269-2..2013, IDT); - GB 13539.3-2008 Low - voltage fuses - Part 3. Supplementary requirements for fuses used by unskilled personnel (mainly for Household and similar fuses) Standardized fuse systems Examples A to F (IEC 60269-3..2006, IDT). This part makes the following editorial changes. - to remove the preamble of international standards; --- Figure CC.6 in the upper right there are three "x" cross-section symbols, two suspects are wrong, delete; the lower right of the figure "X detail 6)" doubt, change For "X detail 5)"; - "CC.6.1" (see CC.6.4) "is incorrect and changed to" (see CC.6.3) ". This part is made by China Electrical Equipment Industry Association. This part is headed by the National Standardization Technical Committee for Fuses (SAC/TC340). This part is responsible for the drafting unit. Shanghai Electric Research Institute. This part participates in the drafting unit. Shanghai Electric Ceramics Factory Co., Ltd., People's Electric Group Co., Ltd., Hailey (China) Electronic Technology (Shanghai) Co., Ltd., Zhejiang Zhengtai Electric Appliance Co., Ltd., Zhejiang Shengtai Electric Appliance Co., Ltd., Zhejiang West melting Electric Co., Ltd., Shanghai Siemens Line Protection System Co., Ltd., Wenzhou three real Electric Co., Ltd., Zhejiang Sony fuse Co., Ltd., Yueqing Shanghai melting special fuse Co., Ltd., Xi'an in the melting Electric Co., Ltd., Cooper Xi'an fuse Co., Ltd., Shanghai Electric Equipment testing. The main drafters of this part are. Wu Qingyun, Zhang Lili, Lin Haiou, Li Quanan, Lai Wenhui, Liu Shuangku, Jia Wei, Li Chuanjiang, Li Zhenfei, Huang Xuxiong, Fan Linlin, Zheng Aiguo, Shi Xiaoguang, Zhang Yi, Yi Ying. This part of the previous version of the standard to replace the release of the situation. --- GB 13539.4-1992; --- GB/T 13539.4-2005, GB/T 13539.7-2005; --- GB/T 13539.4-2009. Low voltage fuses Part 4. fuse for protection of semiconductor equipment The supplementary requirements

1 General

In addition to the provisions of IEC 60269-1..2006, add the following requirements. The fuse for the protection of semiconductor equipment shall comply with all requirements of IEC 60269-1..2006 and shall also comply with the requirements of the Supplement Claim. 1.1 Scope and purpose The supplementary requirements of this part apply to the fuse link mounted on a device with a semiconductor device which is suitable for the nominal voltage More than AC 1000V or DC 1500V circuit. If applicable, can also be used for higher nominal voltage circuits. Note 1. Such fuse links are commonly referred to as "semiconductor fuse links". NOTE 2 In most cases, a portion of the combination can be used as a fuse base. Due to the diversity of equipment, it is difficult to make general provisions; combination equipment Whether it is suitable for the fuse base, should be consulted by the user and the manufacturer. However, if you use a separate fuse base or fuse support, they are Shall comply with the relevant requirements of IEC 60269-1..2006. Note 3. IEC 60269-6 is dedicated to the protection of solar photovoltaic systems. The purpose of this part is to determine the characteristics of the semiconductor fuse, so that under the premise of the same size, you can use the same characteristics of the other The type of fuse is replaced by a semiconductor fuse. Therefore, this section specifically provides. a) The following characteristics of the fuse link. 1) Rating; 2) temperature rise during normal operation; 3) dissipated power; 4) time-current characteristics; 5) breaking capacity; 6) cut off the current characteristics and I2t characteristics; 7) Arc voltage characteristics. b) Type test to verify the characteristics of fuse links; c) Fuse mark; d) Technical data to be provided (see Appendix BB). 1.2 Normative references The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. IEC 60269-1..2006 Low-voltage fuses Part 1. Basic requirements (Low-voltagefuses-Part 1. Generalre- quirements IEC 60269-2..2006 Low - voltage fuses - Part 2. Supplementary requirements for fuses used by full - time personnel (mainly for industrial use) Fuses) Standardized Fuse System Examples A to J (Low-voltagefuses-Part 2. Supplementaryrequirementsfor fusesforusebyauthorizedpersons (fusesmainlyforindustrialapplication) -Examplesofstandardized

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 13539.4-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 13539.4-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 13539.4-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 13539.4-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 13539.4-2016?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 13539.4-2016 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.