HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

DZ/T 0213-2020 English PDF

US$829.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
DZ/T 0213-2020: Specifications for limestone and cement-ingredients mineral exploration
Status: Valid

DZ/T 0213: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
DZ/T 0213-2020English829 Add to Cart 6 days [Need to translate] Specifications for limestone and cement-ingredients mineral exploration Valid DZ/T 0213-2020
DZ/T 0213-2002English160 Add to Cart 0--9 seconds. Auto-delivery Specifications for metallurgic, chemical limestone and dolomite, cement-materials mineral exploration Obsolete DZ/T 0213-2002

Standard similar to DZ/T 0213-2020

DZ/T 0207   DZ/T 0209   DZ/T 0206   

Basic data

Standard ID DZ/T 0213-2020 (DZ/T0213-2020)
Description (Translated English) Specifications for limestone and cement-ingredients mineral exploration
Sector / Industry Geological Industry Standard (Recommended)
Classification of Chinese Standard D13
Classification of International Standard 73.020; 73.080
Word Count Estimation 36,311
Date of Issue 2020-04-30
Date of Implementation 2020-04-30
Older Standard (superseded by this standard) DZ/T 0213-2002
Quoted Standard GB 6566; GB 6722; GB/T 12719; GB/T 13908; GB/T 17766; GB 18306; GB/T 18341; GB/T 25283; GB/T 33444; GB 50295; DZ/T 0033; DZ/T 0078; DZ/T 0079; DZ/T 0130.1; DZ/T 0130.2; DZ/T 0130.3; DZ/T 0130.4; DZ/T 0130.5; DZ/T 0130.6; DZ/T 0130.7; DZ/T 0130.8
Regulation (derived from) Ministry of Natural Resources Announcement No. 26, 2020
Issuing agency(ies) Ministry of Natural Resources
Summary This standard specifies requirements for the purpose and stage of exploration for geological exploration of limestone and cement ingredient minerals, the degree of exploration and research, the degree of exploration control, green exploration, exploration work and its quality, feasibility evaluation, resource reserve type conditions, and resource reserve estimation. This standard is applicable to various stages of geological prospecting, resource reserve estimation and achievement evaluation of limestone and cement ingredient minerals.
DZ/T 0213-2002 DZ NATIONAL GEOLOGY AND MINERAL RESOURCES INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 73.020; 73.080 D 13 Specifications for Metallurgic, Chemical Limestone and Dolomite, Cement-Materials Mineral Exploration ISSUED ON. DECEMBER 17, 2002 IMPLEMENTED ON. MARCH 01, 2003 Issued by. Ministry of Land and Resource of PRC 3. No action is required - Full-copy of this standard will be automatically & immediately delivered to your EMAIL address in 0~60 minutes.

Table of Contents

Foreword ... 4 1 Scope ... 5 2 Normative References ... 5 3 Target Tasks of Exploration ... 6 4 Study Degree of Exploration Work ... 6 4.1 Geological study ... 6 4.2 Test requirements for ore processing technology ... 10 4.3 Mining technology condition ... 11 4.4 Comprehensive exploration and evaluation... 12 4.5 Adopt new technology and new method ... 12 4.6 Situations of scattered small mines ... 13 5 Requirements for Exploration Study Degree ... 13 5.1 Exploration type ... 13 5.2 Confirmation principle of exploration engineering spacing ... 13 5.3 Confirmation of control degree ... 14 6 Exploration Work and Quality Requirements ... 15 6.1 Main geological map ... 15 6.2 Prospecting engineering ... 15 6.3 Geophysical prospecting ... 15 6.4 Chemical sampling ... 16 6.5 Sample processing ... 17 6.6 Chemical analysis quality inspection ... 17 6.7 Rock-ore physical properties test ... 19 6.8 Original geological record, comprehensive data arrangement ... 19 7 Feasibility Evaluation Work ... 20 7.1 Meaning ... 20 7.2 Overview study ... 20 7.3 Pre-feasibility study ... 21 7.4 Feasibility study ... 21 8 Resources/Reserves Classification and Type Conditions... 22 8.1 Resource/Reserve classification basis ... 22 8.2 Resource/Reserve type ... 23 9 Resources/Reserves Estimation ... 26 9.1 Industrial Indicators of Resources/Reserves ... 26 9.2 General principles of resources/reserves estimation ... 27 9.3 Confirming the requirements for resources/reserves estimation parameters ... 27 9.4 Resources/Reserves estimation result table ... 27 10 Preparation of Exploration Geological Report ... 27 Appendix A (Normative) Solid Mineral Resources/Reserves Classification ... 28 Appendix B (Informative) Exploration Type and Engineering Spacing Reference ... 29 B.1 Major geological factors for classification of exploration type ... 29 B.2 Metallurgic, chemical limestone and dolomite, cement material mineral exploration type (see Table B.1) ... 30 B.3 Exploration engineering spacing ... 31 Appendix C (Informative) Chemical Analysis Items and Inspection Analysis Correction Factor ... 33 C.1 Chemical analysis items ... 33 C.2 Inspection analysis correction coefficient (see Table C.3) ... 34 Appendix D (Informative) General Industrial Indicators ... 35 D.1 Quality requirements ... 35 D.2 Requirements for mining technical conditions... 37 Specifications for Metallurgic, Chemical Limestone and Dolomite, Cement-Materials Mineral Exploration

Scope

This Standard specifies the degree of exploration study, exploration quality, classification and type condition of resources/reserves, estimation of resources/reserves, etc. for metallurgical, chemical limestone and dolomite, cement- material mineral (calcareous material, clay material, and siliceous material)1); and provides the deposit exploration type for analogy, and exploration engineering spacing for reference. This Standard is applicable to the metallurgic, chemical limestone and dolomite, cement-materials mineral exploration, resource/reserves estimation; applicable to the acceptance and review for the exploration design and exploration result report of metallurgic, chemical limestone and dolomite, cement-material mineral; can also serve as the basis for assessing and estimating the mineral resources/reserves during the financing and the like activities of mining rights transferring, and mineral exploration and mining.

Normative References

The provisions in following documents become the provisions of this Standard through reference in this Standard. For dated references, the subsequent amendments (excluding corrigendum) or revisions do not apply to this Standard, however, parties who reach an agreement based on this Standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies. GB/T 13908-2002 General Requirements for Solid Mineral Exploration GB/T 17766-1999 Classification for Resources/Reserves of Solid Fuels and Mineral Commodities GB/T 12719-91 Exploration Specification of hydrogeology and Engineering Geology in Mining Areas 1) Cement-material mineral generally includes. calcareous material – limestone, argillaceous limestone, marble; clay material – clay, loess, mudstone, silt rock, shale, phyllite; siliceous material – sand, sandstone. 3 Target Tasks of Exploration The exploration work can be divided into four phases, namely, pre-survey, general survey, detailed survey, and prospecting. The target tasks in each phase are as follows. 3.1 Pre-survey phase. through comprehensive study of geological data in the area, preliminary field observation, very small amount of engineering verification, analogy and prediction of the known deposit with the similar geological characteristics, propose the area with larger mineral resources potentials for the general survey. 3.2 General survey phase. through adopting outcrop inspection, geological mapping, limited number of sampling work, and the like field work against the area with larger mineral source potentials confirmed in the pre-survey phase, generally find out the geology and tectonics in the general survey area; generally understand the orebody shape, production condition, and quality characteristics; generally learn exploring technology of the deposit; conduct the mineral processing and separation analogy study; propose whether it is worth for the further detailed survey, and encircle the range for the detailed survey area. 3.3 Detailed survey phase. adopt several exploration methods and measures against the detailed survey area encircled by the general survey; take certain network degree system to sample; basically identify the geological and tectonic characteristics, and control situation for the orebody, which mainly includes orebody shape, occurrence, size, and mineral quality; basically confirm the continuity of the orebody; basically find out the technical conditions of deposit mining; conduct the mineral processing and separation analogy and laboratory flow test study; make the assessment for whether it has industrial value or whether it can be used in the near future. If necessary, encircle exploration range; and provide basis for pre-feasibility study, master mine planning, and preparation of mine project proposals. For the mining areas that directly provide mining and utilization, it shall meet the requirements of mine construction design. 3.4 Prospecting phase. through encrypting various sampling projects against the exploration area proposed by the detailed survey, identify the deposit geological characteristics in detailed; confirm the orebody shape, occurrence, size, change regularity of down-strike and inclination, spatial location and ore quality characteristics; confirm the continuity of orebody; find out the technical conditions of orebody mining; so that provide basis for the feasibility study or mine construction design. 4 Study Degree of Exploration Work 4.1 Geological study 4.1.1 area geology occurrence, thickness, ore composition, ore type and distribution; generally, identify the grain size, mineral composition, chemical composition of loose clay material, siliceous material, and the plasticity of clay material; generally, learn the type and distribution of ore-bearing rock, as well as the mineral composition, chemical composition, structure and tectonics of ore-bearing rock. During the detailed survey phase, it shall basically identify the orebody shape, scale, occurrence, thickness and change regularity; basically identify the ore type, grade, distribution and change regularity; basically identify ore mineral composition, chemical composition, structure and tectonics; study the grain size, mineral composition, chemical composition of loose clay material and siliceous material, as well as the plasticity of clay material; basically identify the ore-bearing rock type, scale, occurrence, distribution regularity; basically identify the ore-bearing rock mineral composition, chemical composition, st...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of DZ/T 0213-2020_English be delivered?

Answer: Upon your order, we will start to translate DZ/T 0213-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of DZ/T 0213-2020_English with my colleagues?

Answer: Yes. The purchased PDF of DZ/T 0213-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version DZ/T 0213-2020?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version DZ/T 0213-2020 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.