HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (6 Jul 2025)

DL/T 5410-2009 English PDF


DL/T 5410-2009: Engineering geological investigation specification for medium-small hyower projects
Status: Obsolete
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
DL/T 5410-2009EnglishRFQ ASK 3 days [Need to translate] Engineering geological investigation specification for medium-small hyower projects Obsolete DL/T 5410-2009

PDF Samples

Basic data

Standard ID DL/T 5410-2009 (DL/T5410-2009)
Description (Translated English) Engineering geological investigation specification for medium-small hyower projects
Sector / Industry Electricity & Power Industry Standard (Recommended)
Classification of Chinese Standard P59
Classification of International Standard 27.140
Word Count Estimation 132,121
Date of Issue 2009-07-22
Date of Implementation 2009-12-01
Quoted Standard GB 50287; GB 18306; GB 50021; DL 5180; DL/T 5185; DL/T 5388; CJJ 57; DL/T 5206; DL/T 5020; DL/T 5212; DL/T 5109; GB 50025
Drafting Organization China Hydropower Engineering Consulting Group Kunming Survey and Design Institute
Administrative Organization Hydropower Planning and Design of Electric Power Industry Technical Standards Committee
Regulation (derived from) National Energy Board Notice No. 1 of 2009
Summary This standard provides small and medium hydropower projects (hereinafter referred to as hydropower projects) each survey and design phase of the mission, work content, survey methods, and technical requirements. This standard applies to small and medium hydropower project engineering geological survey work.

Similar standards

NB 35047   SL 314   SL 282   DL/T 5407   DL/T 5406   DL/T 5400