Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 43695-2024 PDF English

US$230.00 · In stock · Download in 9 seconds
GB/T 43695-2024: Energy conversion efficiency requirements and measurement methods for lithium ion cells and batteries
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB/T 43695-2024230 Add to Cart Auto, 9 seconds. Energy conversion efficiency requirements and measurement methods for lithium ion cells and batteries Valid

Similar standards

GB/T 43691.1   GB/T 42729   GB/T 42728   GB/T 31036   

GB/T 43695-2024: Energy conversion efficiency requirements and measurement methods for lithium ion cells and batteries


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT43695-2024
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 29.220.99 CCS K 82 Energy Conversion Efficiency Requirements and Measurement Methods for Lithium Ion Cells and Batteries Issued on: MARCH 15, 2024 Implemented on: OCTOBER 1, 2024 Issued by. State Administration for Market Regulation; Standardization Administration of the People’s Republic of China.

Table of Contents

Foreword... 3 1 Scope... 4 2 Normative References... 4 3 Terms and Definitions... 4 4 Test Conditions... 6 4.1 Test environmental conditions... 6 4.2 Parameter measurement tolerance... 7 4.3 Sample pretreatment... 7 4.4 Sample requirements... 8 4.5 Number of samples... 8 5 Representation and Calculation Method... 8 5.1 Overview... 8 5.2 Capacity... 8 5.3 Energy... 9 5.4 Coulombic efficiency... 9 5.5 Energy efficiency... 10 6 Requirements and Measurement Methods... 10 6.1 Coulombic efficiency... 10 6.2 Energy efficiency... 11 Bibliography... 13 Energy Conversion Efficiency Requirements and Measurement Methods for Lithium Ion Cells and Batteries

1 Scope

This Document specifies the energy conversion efficiency requirements for lithium-ion cells and batteries; and describes the calculation method and measurement method. This Document applies to lithium-ion cells and batteries.

2 Normative References

There are no normative references in this Document.

3 Terms and Definitions

For the purposes of this Document, the following terms and definitions apply. 3.1 Lithium ion cell A device that relies on the movement of lithium ions between the positive and negative electrodes to achieve the mutual conversion between chemical energy and electrical energy, and is designed to be rechargeable. NOTE. The device includes electrodes, separators, electrolytes, containers and terminals, etc. 3.2 Lithium ion battery An assembly that consists of any number of lithium-ion batteries and ready for use. NOTE. The assembly includes protection circuits and may also contain packaging materials, connectors, protection devices, etc. 3.3 Coulombic efficiency; ηc The percentage of the amount of charge output when the battery is discharged to the amount of charge input when it was previously charged. NOTE 1.Unless otherwise specified, the coulombic efficiency in this document refers specifically to the efficiency at the same rate. 3.10 Cell (battery) energy; E The electrical energy input/output of a cell (battery) under specified conditions. [SOURCE. GB/T 2900.41-2008, 482-03-21, modified] 3.11 Charge energy; Ec The electrical energy input by the cell under specified conditions. 3.12 Discharge energy; Ed The electrical energy output by the cell under specified conditions. NOTE. The international unit of energy is Joule (1 J=1 Ws), but actually cell energy is usually expressed in watt-hours (Wh) (1 Wh=3,600 J). [SOURCE. GB/T 2900.41-2008, 482-03-21] 3.13 Reference test current; It The test current has the same value as the rated capacity (C). NOTE. The unit is ampere (A) or milliampere (mA). 3.14 Limited charging voltage; Ucl The rated maximum charging voltage of a cell or battery that is specified by the manufacturer. 3.15 End of discharge voltage; Ude The voltage of a cell or battery at the end of discharge as recommended by the manufacturer. 3.16 Recommendation charging current; Icr Constant charging current recommended by the manufacturer. 3.17 Recommendation discharging current; Idr Continuous discharging current recommended by the manufacturer.

4 Test Conditions

4.1 Test environmental conditions Unless otherwise specified, the test is generally carried out under the following conditions. a) Temperature. 23 ℃ ±2 ℃; b) Relative humidity. no more than 90%; c) Air pressure. 86 kPa~106 kPa. 4.2 Parameter measurement tolerance Relative to the specified value or actual value, the accuracy of all control values or measured values shall be within the following tolerance range. a) Voltage. ±0.1%; b) Current. ±1% of the used range; c) Temperature. ±2 ℃; d) Time. ±0.1%; e) Capacity. ±1%; f) Energy. ±1%. 4.3 Sample pretreatment 4.3.1 Charging procedure for pretreatment Before charging, the cell or battery should be discharged at 0.2It to the end of discharge voltage at an ambient temperature of 23 ℃ ±2 ℃. The cell or battery may be charged in the following test by the following method. At an ambient temperature of 23 ℃ ± 2 ℃, charge at a constant current of 0.2It. When the cell terminal voltage reaches the limited charging voltage; change to constant voltage for charging until the charging current is less than or equal to 0.02It, stop charging, and the maximum charging time shall not exceed 8 h. 4.3.2 Discharge procedure for pretreatment The cell is discharged at a constant current to the end of discharge voltage according to the recommendation discharging current specified by the manufacturer. 4.3.3 Time interval between charging and discharging After the cell is charged and discharged for two cycles according to the provisions of 4.3.1 and 4.3.2, it is tested according to Clauses 5 and 6.The time interval between the charging and discharging procedures is the current rate used in the previous charging process multiplied by 60 min. ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB/T 43695-2024 be delivered?Answer: The full copy PDF of English version of GB/T 43695-2024 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 43695-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 43695-2024_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 43695-2024 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB/T 43695-2024?

A step-by-step guide to download PDF of GB/T 43695-2024_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 43695-2024".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9