Path: Home > GB/T > Page1 > GB/T 43187-2023
GB/T 43187-2023 English PDF
Price & DeliveryUS$470.00 · In stock · Download in 9 secondsGB/T 43187-2023: On-board wireless communication terminal Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 43187-2023 | English | 470 |
Add to Cart
|
0-9 seconds. Auto-delivery.
|
On-board wireless communication terminal
|
GB/T 43187-2023: On-board wireless communication terminal ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT43187-2023
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 43.040
CCS T 36
On-board Wireless Communication Terminal
Issued on. SEPTEMBER 7, 2023
Implemented on. SEPTEMBER 7, 2023
Issued by. State Administration for Market Regulation;
Standardization Administration of the People’s Republic of China.
Table of Contents
Foreword... 3
1 Scope... 4
2 Normative References... 4
3 Terms and Definitions... 6
4 Symbols and Abbreviations... 6
5 Technical Requirements... 7
6 Test Methods... 18
7 Inspection Rules... 29
Appendix A (informative) Durability Test... 31
Appendix B (informative) Durability Test Calculation Model... 33
1 Scope
This document specifies the technical requirements of on-board wireless communication
terminal (hereinafter referred to as the terminal), and describes the test methods and inspection
rules of the terminal.
This document is applicable to cellular mobile communication on-board wireless terminal.
Other types of terminals may take this as a reference.
2 Normative References
The contents of the following documents constitute indispensable clauses of this document
through the normative references in the text. In terms of references with a specified date, only
versions with a specified date are applicable to this document. In terms of references without a
specified date, the latest version (including all the modifications) is applicable to this document.
GB/T 1865-2009 Paints and Varnishes - Artificial Weathering and Exposure to Artificial
Radiation - Exposure to Filtered Xenon-arc Radiation
GB/T 2828.1 Sampling Procedures for Inspection by Attributes - Part 1.Sampling Schemes
Indexed by Acceptance Quality Limit (AQL) for Lot-by-lot Inspection
GB/T 18655-2018 Vehicles, Boats and Internal Combustion Engines - Radio Disturbance
Characteristics - Limits and Methods of Measurement for the Protection of On-board Receivers
GB/T 19951-2019 Road Vehicles - Disturbances Test Methods for Electrical / Electronic
Component from Electrostatic Discharge
3 Terms and Definitions
The following terms and definitions are applicable to this document.
3.1 on-board wireless communication terminal
On-board wireless communication terminal refers to an electronic equipment installed on
vehicles that can establish connections and exchange information through technologies like
cellular mobile communication.
4 Symbols and Abbreviations
The following symbols and abbreviations are applicable to this document.
ACLR. Adjacent Channel Leakage Power Ratio
BER. Bit Error Rate
5 Technical Requirements
5.1 Functional Requirements
5.1.1 The terminal shall have a self-check function. If a fault occurs, the driver shall be
prompted acoustically or optically through the terminal (or a system associated with it). The
fault prompt mode shall be explained in the instruction manual of the automobile product.
5.1.4 The terminal shall only use SMD SIM cards for communication.
5.1.5 The terminal shall have a backup antenna, and the backup antenna shall at least support
all 4G frequency bands in Table 1, so as to avoid communication function failure caused by
disconnection of the external antenna. If the vehicle is equipped with a backup antenna with the
same function, it shall be deemed to satisfy the requirements.
5.2 Performance Requirements
Classification System Frequency Band
5.3.2 Dustproof and waterproof performance
5.3.2.1 Dustproof performance
In accordance with 6.4.2.1, carry out the test. The protection degree shall comply with the
stipulations of IP5KX in GB/T 30038-2013.After the test, the terminal shall satisfy the
requirements of 5.2.
5.3.2.2 Waterproof performance
For terminals installed in exposed locations in the passenger compartment, in accordance with
6.4.2.2, carry out the test. The protection degree shall comply with the stipulations of IPX2 in
GB/T 30038-2013.After the test, the terminal shall satisfy the requirements of 5.2.
Terminals installed in non-exposed locations in the passenger compartment are exempted from
this requirement.
5.3.4 Environmental weather resistance
5.3.4.1 Scope of temperature and humidity
The range of temperature and humidity of the storage environment and the operating
environment of the terminal shall comply with the stipulations of Table 8.
5.3.4.2 Low-temperature storage
In accordance with 6.4.4.1, carry out the test. After the test, the terminal shall satisfy the
requirements of 5.2.
5.3.4.7 Rapid temperature changes of specified conversion time
In accordance with 6.4.4.6, carry out the test. After the test, the terminal shall satisfy the
requirements of 5.2.
5.3.4.8 Temperature cycle of specified change rate
In accordance with 6.4.4.7, carry out the test. During and after the test, the terminal shall satisfy
the requirements of 5.2.Through negotiation between the supply-side and the demand-side, the
lower limit of the maximum transmit power tolerance value during the test can be reduced by
2 dB.
6 Test Methods
6.1 Test Conditions
6.1.1 Test environmental conditions
If there are no other provisions, the test environmental conditions shall comply with the
stipulations of Table 10.
6.1.2 Test voltage
Temperature Relative Humidity Air Pressure
If there are no other provisions, the test voltage shall comply with the stipulations of Table 11.
6.1.3 DUT working modes
6.1.4 Construction of test environment
6.1.4.1 General requirements
In accordance with Figure 1, construct the test environment. The test environment shall reduce
the presence of co-channel or adjacent-channel interference.
6.1.4.2 Special requirements
6.1.5 Frequency band selection principle
In accordance with the grouping rules of 7.1, in the vehicle-regulated environmental evaluation
of 6.4, the frequency band shall be selected by the tester. Priority shall be given to 4G and / or
5G frequency band for the tests.
6.4 Vehicle-regulated Environmental Evaluation Test
6.4.1 Electrical properties test
6.4.1.2 Overvoltage test
6.4.1.2.1 Under the condition (Tmax 20 C)
DUT operates in working mode 3.2.In accordance with the method of 4.3.1.1.2 or 4.3.2.2 in
GB/T 28046.2-2019, carry out the test. During the test, randomly select a frequency band
supported by DUT, in accordance with Table 12, continue the properties test, until the test is
completed. After the test, randomly select a frequency band supported by DUT, in accordance
with Table 12, carry out the properties test.
6.4.1.4 Slow drop and rise test of supply voltage
DUT operates in working mode 3.2.In accordance with the method of 4.5.2 in GB/T 28046.2-
2019, carry out the test. After the test, randomly select a frequency band supported by DUT, in
accordance with Table 12, carry out the properties test.
6.4.1.5 Transient changes test of supply voltage
6.4.1.6 Reverse voltage test
DUT operates in working mode 3.2.In accordance with the method of 4.7.2 in GB/T 28046.2-
2019, carry out the test. After the test, randomly select a frequency band supported by DUT, in
accordance with Table 12, carry out the properties test.
6.4.1.7 Load dump test
DUT operates in working mode 3.2.In accordance with the method of 4.6.4.2 in GB/T 28046.2-
2019, carry out the test. After the test, randomly select a frequency band supported by DUT, in
accordance with Table 12, carry out the properties test.
6.4.1.10 Shor-circuit protection test
DUT operates in working mode 3.2.In accordance with the method of 4.10.2.1 in GB/T
28046.2-2019, carry out the test. After the test, randomly select a frequency band supported by
DUT, in accordance with Table 12, carry out the properties test.
6.4.1.11 Insulation resistance test
Set DUT to working mode 1.1.In accordance with the method of 4.12.2 in GB/T 28046.2-2019,
carry out the test. After the test, switch DUT to working mode 3.2, randomly select a frequency
band supported by DUT, in accordance with Table 12, carry out the properties test.
6.4.2 Dustproof and waterproof performance test
6.4.3.3 Free fall test
Set DUT to working mode 1.1.In accordance with the method of 4.3.2 in GB/T 28046.3-2011,
carry out the test. After the test, switch DUT to working mode 3.2, randomly select a frequency
band supported by DUT, in accordance with Table 12, carry out the properties test.
6.4.4 Environmental weather resistance test
6.4.4.1 Low-temperature storage test
Set DUT to working mode 1.1.In accordance with the lower limit of storage temperature
specified in Table 8 and the method of 5.1.1.1.2 in GB/T 28046.4-2011, carry out the test. After
the test, let it stand for 2 h to return to normal temperature, switch DUT to working mode 3.2,
randomly select a frequency band supported by DUT, in accordance with Table 12, carry out
the properties test.
7 Inspection Rules
7.1 Sampling and Grouping of Type Test
For the type test, take samples from the terminals that have passed the exit-factory inspection
in accordance with the single sampling scheme specified in GB/T 2828.1.
7.2 Qualification Determination
The type test items of the terminals shall all comply with the specified requirements. If one item
is disqualified, re-take a double number of samples to conduct a re-inspection of the disqualified
items. If there are still disqualified items, then, the batch of samples shall be determined as
disqualified.
...... Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 43187-2023 be delivered?Answer: The full copy PDF of English version of GB/T 43187-2023 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 43187-2023_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 43187-2023_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 43187-2023 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of GB/T 43187-2023?A step-by-step guide to download PDF of GB/T 43187-2023_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as USD, Euro, KRW, JPY, AUD, CAD, RMB, IDR, INR, THB, HKD etc.). Step 2: Search keyword "GB/T 43187-2023". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 | Steps 4~6 | Step 7 | Step 8 | Step 9
|