GB 50339-2013 PDF English (GB 50339-2003: Older version)


Search result: GB 50339-2013 (GB 50339-2003 Older version)
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB 50339-2013405 Add to Cart Auto, < 3 mins Cade for acceptance of quality of intelligent building systems Valid
GB 50339-2003RFQ ASK 3 days Code for acceptance of quality of intelligent building systems Obsolete

Similar standards: GB 50516   GB/T 50312   GB 50472   GB 50348   

GB50339-2013: PDF in English

GB 50339-2013 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA UDC P GB 50339-2013 Code for Acceptance of Quality of Intelligent Building Systems ISSUED ON: JUN 26, 2013 IMPLEMENTED ON: FEBRUARY 1, 2014 Issued by: Ministry of Housing and Urban-Rural Construction of the People’s Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China. Table of Contents 1 General Provisions ... 7 2 Terminologies and Symbols ... 8 2.1 Terminologies ... 8 2.2 Symbols ... 8 3 Basic Requirements ... 9 3.1 General Requirements ... 9 3.2 Quality Control of Engineering Implementation ... 10 3.3 System Checking and Measuring ... 12 3.4 Acceptance of Subsection (Sub-subsection) Project ... 13 4 Intelligent Integration System ... 16 5 Communication Access System ... 18 6 Telephone Switching System ... 19 7 Information Network System ... 20 7.1 General Requirements ... 20 7.2 Computer Network System Checking and Measuring ... 20 7.3 Network Security System Checking and Measuring ... 22 8 Generic Cabling System ... 24 9 Mobile Communication Indoor Coverage System ... 26 10 Satellite Communication System ... 27 11 Cable Television and Satellite Television Receiving System ... 28 12 Public Address System ... 31 13 Conference System ... 33 14 Guidance and Information Display System ... 36 15 Clock System ... 37 16 Information Technology Application System ... 39 17 Building Equipment Monitoring System ... 41 18 Fire Alarm System ... 44 19 Security and Protection System ... 45 20 Emergency Response System ... 48 21 Machine Room Engineering ... 49 22 Lightning Protection and Earthing ... 51 Appendix A Records of Quality Management and Inspection in Construction Site ... 52 Appendix B Records of Project Implementation and Quality Control ... 53 Appendix C Checking and Measuring Records ... 59 Appendix D Acceptance Record of Subsection (Sub-subsection) Project ... 79 Wording Explanation of This Code ... 82 List of Quoted Standards ... 83 Code for Acceptance of Quality of Intelligent Building Systems 1 General Provisions 1.0.1 This code is formulated with view to strengthening the quality management of intelligent building systems, standardizing the quality acceptance of intelligent building systems, specifying the organization procedures and qualification evaluation criteria of the quality checking and acceptance of intelligent building systems and guaranteeing the quality of intelligent building systems. 1.0.2 This code is applicable to the quality acceptance of intelligent building systems in constructed, renovated and extended engineering. 1.0.3 The quality acceptance of intelligent building systems shall not only meet those specified in this code, but also meet those specified in the relevant current standards of the nation. 2 Terminologies and Symbols 2.1 Terminologies 2.1.1 System checking and measuring After the installation, debugging, self-checking and trial running of intelligent building system have been completed, certain methods, instruments and equipment will be adopted to conduct overall checking and testing on the system functions and performance and to provide conclusion. 2.1.2 Rectification Modification and adjustment on the rejected item of the engineering to make it be qualified. 2.1.3 Trial running The continuous operation process of system within specified time after the installation, debugging and self-checking of intelligent building system. 2.1.4 Project supervision An organization dispatched by supervision organization to be responsible for the performance of supervision contract of engineering project. 2.1.5 Acceptance group A temporary institution formed by relevant personnel under the organization of the development organization and undertaking the acceptance works during engineering acceptance. 2.2 Symbols HFC - Hybrid Fibre Coax ICMP - Internet Control Message Protocol IP - Internet Protocol PCM - Pulse Code Modulation QoS - Quality of Service VLAN - Virtual local Area Network inspection record shall meet the following requirements: l The equipment and material receiving inspection record shall be filled in by the construction organization, the inspection conclusion shall be made by the supervision engineer of supervision (development) organization (professional engineer of the project), and the record format shall meet those specified in Table B.0.1 of Appendix B of this code; 2 The equipment unpacking inspection record shall meet the requirements of the current national standard “Code for Installation of Intelligent Building Systems” (GB 50606). 3.2.5 The concealed engineering (follow-up inspection) acceptance record shall be filled in by the construction organization, the inspection conclusion shall be made by the supervision engineer of supervision (development) organization (professional engineer of the project), and the record format shall meet those specified in Table B.0.2 of Appendix B of this code. 3.2.6 The installation quality and appearance quality acceptance record shall be filled in by the construction organization, the inspection conclusion shall be made by the supervision engineer of supervision (development) organization (professional engineer of the project), and the record format shall meet those specified in Table B.0.3 of Appendix B of this code. 3.2.7 The self-checking record shall be filled in by the construction organization, the inspection conclusion shall be made by the professional technical principal of the construction organization and the record format shall meet those specified in Table B.0.4 of Appendix B of this code. 3.2.8 The subitem project quality acceptance record shall be filled in by the construction organization, the inspection conclusion shall be made by the professional technical principal of construction organization, the acceptance conclusion shall be made by the supervision engineer of supervision (development) organization (professional technical principal of the project) and the record format shall meet those specified in Table B.0.5 of Appendix B of this code. 3.2.9 The trial running record shall be filled in by the construction organization, the inspection conclusion shall be made by the supervision engineer of supervision (development) organization (professional engineer of the project), and the record format shall meet those specified in Table B.0.6 of Appendix B of this code; 3.2.10 The quality control of software product shall not only cover the contents specified in 3.2.4 of this code, but also cover the document data and technical indexes; moreover, it shall meet the following requirements: l The use permit and application scope of commercial software shall meet the contract requirements; 2 As for the application software compiled in allusion to the engineering project, the function and performance testing results given in the testing report shall meet the contract requirements for the engineering project. 3.2.11 The quality control of interface shall not only cover the contents specified in 3.2.4 of this code, but also meet the following requirements: l The interface technical document shall meet the contract requirements; the interface technical document shall cover such contents as interface overview, interface block diagram, interface position, interface type and quantity, interface communication protocol, data flow direction, interface responsibility boundary, etc.; 2 The interface technical document revised according to the actual engineering project conditions shall be confirmed with the signatures of development organization, design organization, interface provision organization and construction organization; 3 The interface testing document shall meet the design requirements; the interface testing document shall cover such contents as construction of testing link, apparatuses and instruments for testing, testing methods, testing contents and testing result judgment, etc.; 4 The interface testing shall meet the requirements of interface testing document, and the testing result record shall be confirmed with the signatures of interface provision organization, construction organization, development organization and project supervision organization. 3.3 System Checking and Measuring 3.3.1 System checking and measuring shall be conducted after the system passes trial running. 3.3.2 The following data shall be submitted before system checking and measuring: 1 Engineering technical document ; 2 Equipment and material receiving inspection record and equipment unpacking inspection record; 3 Self-checking record; 4 Subitem project quality acceptance record; 5 Trial running record. 3.3.3 The organization of system checking and measuring shall meet the following requirements: 1 The development organization shall organize a project checking and measuring team; 2 A checking and measuring director shall be appointed for the project checking and measuring team; 3 The project checking and measuring team of public institutions shall be formed by qualified testing organization. 3.3.4 The system checking and measuring shall meet the following requirements: l The system checking and measuring scheme shall be compiled according to the checking and measuring items, quantity and methods specified in the engineering technical document and this code, and the scheme shall be implemented after being approved by the development organization or project supervision; 2 Checking and measuring shall be conducted according to the items listed in the system checking and measuring scheme; the dominant and general items of system checking and measuring shall meet the requirements of Appendix C of this code; 3 The system checking and measuring shall be carried out in an order of subitem project, sub-subsection project and subsection project, and ".......
Source: https://www.ChineseStandard.net/PDF.aspx/GB50339-2013