SH/T 3082-2019 PDF English
Price & Delivery
US$459.00 · In stock · Download in 9 secondsSH/T 3082-2019: Design specification for instrumentation power supply in petrochemical industry
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
SH/T 3082: Historical versions
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| SH/T 3082-2019 | English | 459 | Add to Cart | 4 days [Need to translate] | Design specification for instrumentation power supply in petrochemical industry |
| SH/T 3082-2003 | English | 919 | Add to Cart | 4 days [Need to translate] | Design code for instrument power supply in petrochemical industry |
| SH 3082-1997 | English | RFQ | ASK | 6 days [Need to translate] | Code for the design of instrument power supply for petrochemical industry |
Click to Preview a similar PDF
Basic data
| Standard ID | SH/T 3082-2019 (SH/T3082-2019) |
| Description (Translated English) | Design specification for instrumentation power supply in petrochemical industry |
| Sector / Industry | Petrochemical Industry Standard (Recommended) |
| Classification of Chinese Standard | P72 |
| Classification of International Standard | 25.040.01 |
| Word Count Estimation | 20,275 |
| Date of Issue | 2019-08-02 |
| Date of Implementation | 2020-01-01 |
| Older Standard (superseded by this standard) | SH/T 3082-2003 |
| Quoted Standard | GB 50052; GB 50054; GB 50217; GB 14048.2; DL/T 1074; SH/T 3038; SH/T 3081; SH/T3164 |
| Regulation (derived from) | Natural Resources Department Announcement No. 7 of 2019 |
| Issuing agency(ies) | Ministry of Industry and Information Technology |
| Summary | This standard specifies the power supply range, load level, power quality, configuration plan, power supply system design, power supply equipment selection and power supply system wiring design principles and basic requirements for petrochemical instrument power supplies. This standard is applicable to the engineering design of the power supply system of the instrument and control system in the new construction, expansion and reconstruction projects of petrochemical and coal-based oil and chemical products. |