SH/T 3039-2018 PDF English
Price & Delivery
US$279.00 · In stock · Download in 9 secondsSH/T 3039-2018: Specification for seismic design of non-buried pipe in petrochemical industry
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
SH/T 3039: Historical versions
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| SH/T 3039-2018 | English | 279 | Add to Cart | 3 days [Need to translate] | Specification for seismic design of non-buried pipe in petrochemical industry |
| SH/T 3039-2003 | English | 559 | Add to Cart | 3 days [Need to translate] | General seismic design rule of non-buried pipe for petrochemical industry |
Click to Preview a similar PDF
Basic data
| Standard ID | SH/T 3039-2018 (SH/T3039-2018) |
| Description (Translated English) | Specification for seismic design of non-buried pipe in petrochemical industry |
| Sector / Industry | Petrochemical Industry Standard (Recommended) |
| Classification of Chinese Standard | P72 |
| Classification of International Standard | 75.180 |
| Word Count Estimation | 12,182 |
| Date of Issue | 2018-07-04 |
| Date of Implementation | 2019-01-01 |
| Older Standard (superseded by this standard) | SH/T 3039-2003 |
| Regulation (derived from) | Ministry of Industry and Information Technology Announcement No.36 of 2018 |
| Issuing agency(ies) | Ministry of Industry and Information Technology |
| Summary | This standard specifies the basic requirements for seismic action, seismic checking and seismic measures for non-buried pipelines in petrochemical industry. This standard is applicable to the seismic design of non-buried metal pipelines in petrochemicals where the basic seismic acceleration is not more than 0.40g, or the seismic fortification intensity is 9 degrees or less, and the nominal pressure is not more than 42MPa. Not suitable for seismic design of long-distance pipelines. |