JTGB06-2007 PDF English
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| JTG B06-2007 | English | RFQ | ASK | 13 days [Need to translate] | Highway engineering infrastructure project budget budgeting |
Click to Preview a similar PDF
Basic data
| Standard ID | JTG B06-2007 (JTGB06-2007) |
| Description (Translated English) | Highway engineering infrastructure project budget budgeting |
| Sector / Industry | Highway & Transportation Industry Standard |
| Classification of Chinese Standard | P66 |
| Classification of International Standard | 93.080.01 |
| Word Count Estimation | 89,840 |
| Date of Issue | 2007-10-19 |
| Date of Implementation | 2008-01-01 |
| Regulation (derived from) | ?Ministry of Transport Announcement 2011 No.83 |
| Issuing agency(ies) | Ministry of Transport |
| Summary | This standard applies to new construction and renovation of infrastructure projects in highway engineering estimates, budgeting and management. Rural roads can refer to these Measures, the specific calculation method and billing standards by the provinces, autonomous regions and municipalities directly under the transportation department to develop. Budget or the revised estimate is preliminary design documents or technical design documents important part. Budget should be controlled in the approved construction project feasibility study report investment estimate is allowed to float amplitude range. Budget after approval is the basic construction project investment ceiling construction project investment plan is prepared to identify and control the construction project investment basis, is to control the construction design and construction drawing budget is based, is a measure of design options and choose the most economic rationality Good design is based, is assessing the effects of the construction project investment basis. Design units should be different design stages of preparation of budget estimates and revised estimates. Preparation of budget estimates or the revised estimate should be fully informed of the location of construction conditions, to master the basic data, the correct reference to the provisions of the quota, the standard fee, wages and materials, equipment prices price, according to provisions of this approach for the preparation, so that budget can be a complete accurately reflect the design content. |