US$259.00 · In stock · Download in 9 secondsGB/T 9082.1-2011: wickless heat pipes
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
GB/T 9082.1: Historical versions
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 9082.1-2011 | English | 259 |
Add to Cart
|
3 days [Need to translate]
|
wickless heat pipes
|
| GB/T 9082.1-1988 | English | 199 |
Add to Cart
|
2 days [Need to translate]
|
Aluminium tubes used for wickless gravity heat pipes
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 9082.1-2011 (GB/T9082.1-2011) |
| Description (Translated English) | wickless heat pipes |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | J75 |
| Classification of International Standard | 27.060.30 |
| Word Count Estimation | 11,111 |
| Date of Issue | 2011-05-12 |
| Date of Implementation | 2011-10-01 |
| Older Standard (superseded by this standard) | GB/T 9082.1-1988 |
| Quoted Standard | GB/T 191; GB/T 2828.1-2003; GB/T 14811-2008; GB/T 14812-2008; GB/T 14813-2008 |
| Regulation (derived from) | Announcement of Newly Approved National Standards No. 6 of 2011 |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
| Summary | This standard specifies the core structure ductless heat pipe (hereinafter referred to as the heat pipe) technical requirements, test items, test methods and delivery preparations. This standard applies to non- tube core heat pipe design, manufacture and acceptance. |
GB/T 9082.1-2011: wickless heat pipes
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
wickless heat pipes
ICS 27.060.30
J75
National Standards of People's Republic of China
Replacing GB/T 9082.1-1988
No heat pipe die
Issued on. 2011-05-12
2011-10-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard replaces GB/T 9082.1-1988 "die without gravity heat pipe aluminum pipe."
This standard and GB/T 9082.1-1988 compared to the main changes are as follows.
--- Modify the standard name;
--- Modify the scope of application;
--- Update the normative references;
--- Modify the product requirements, a clear test methods;
--- Modify the test conditions, the test items and methods;
--- Increasing the heat pipe start-up performance, and Appendix aproach to test different methods of heat pipe start performance;
--- Increased the heat pipe casing and the working fluid compatibility requirements, in the form of appendix gives the shell and tube heat working fluid combinations.
The Standard Appendix A, Appendix B is an informative annex.
The standard proposed by China Aerospace Science and Technology Corporation.
The standard by the China Institute of Aerospace Standardization.
This standard drafting unit. China Academy of Space Technology in general, Nanjing St. Connaught heat pipe Co., Nanjing University of Technology.
The main drafters. Zhang, Shaoxing Guo, Miaojian India, Yang Jun, the LI.
This standard replaces the standards previously issued as follows.
--- GB/T 9082.1-1988.
No heat pipe die
1 Scope
This standard specifies the structure die without heat pipe (hereinafter referred to as the heat pipe) technical requirements, test items, test methods and delivery preparation.
This standard applies to non-die heat pipe design, manufacture and acceptance.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 191 Packaging - Pictorial signs
GB/T 2828.1-2003 Sampling procedures for inspection - Part 1. by acceptance quality limit (AQL) retrieval batch test sample
plan
GB/T 14811-2008 term heat pipe
GB/T 14812-2008 Test method for heat pipe heat transfer performance
GB/T 14813-2008 Test method for heat pipe life
3 Terms and Definitions
Terms and definitions GB/T 14811-2008 defined apply to this document.
4. Technical Requirements
4.1 Materials and Structures
4.1.1 refrigerants
Heat pipe working fluid selection based on application requirements, to meet the requirements of the heat pipe heat transfer in the working temperature range, and the shell material and welding phase
Content, the media frequently refer to Appendix A, Table A.1.
4.1.2 shell
Heat pipe shell material and structure depending on the application need to choose, within the operating temperature range of the structural strength of the envelope should meet the requirements, and
Compatible with the working fluid, commonly used shell material, see Appendix A, Table A.1.
4.1.3 Compatibility
Prescribed lifetime of the heat pipe working fluid should not react chemically with the shell and welding materials to produce a sufficient amount of disruption to normal operation
The non-condensable gas, start-up performance, isothermal heat transfer performance and maximum heat flow should satisfy the provisions of 4.5.1,4.5.2 and 4.5.3. Shell and tube
Recommended combinations working fluid in Appendix A.
4.2 Dimensions and tolerances
4.2.1 heat pipe dimensions and connection size shall comply with the design requirements.
...