Home Cart Quotation Policy About-Us
www.ChineseStandard.net
Database: 221581 (27 Mar 2026)
SEARCH
Path: Home > GB/T > Page316 > GB/T 46150.1-2025

GB/T 46150.1-2025 PDF English

Price & Delivery

US$519.00 · In stock · Download in 9 seconds
GB/T 46150.1-2025: Boilers and pressure vessels - Part 1: Performance requirements
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Std IDVersionUSDBuyDeliver [PDF] inTitle (Description)
GB/T 46150.1-2025English519 Add to Cart 5 days [Need to translate] Boilers and pressure vessels - Part 1: Performance requirements

Click to Preview a similar PDF

Basic data

Standard ID GB/T 46150.1-2025 (GB/T46150.1-2025)
Description (Translated English) Boilers and pressure vessels - Part 1: Performance requirements
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard J74;J98
Classification of International Standard 23.020.30; 27.060.30
Word Count Estimation 26,214
Date of Issue 2025-08-29
Date of Implementation 2025-08-29
Issuing agency(ies) State Administration for Market Regulation, National Standardization Administration

GB/T 46150.1-2025: Boilers and pressure vessels - Part 1: Performance requirements


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT46150.1-2025
ICS 23.020.30;27.060.30 CCSJ74;J98 National Standard of the People's Republic of China Boilers and pressure vessels Part 1.Performance requirements (ISO 16528-1.2007,MOD) Released on August 29, 2025 Implementation on August 29, 2025 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Units of measurement 3 5 Classification of boilers and pressure vessels 3 6 Obligations and Responsibilities 3 7 Failure Mode 5 8 Technical Requirements 6 9 Conformity Assessment 12 Appendix A (Informative) Common Failure Modes and Limit States 13 Appendix B (Informative) Selection of Standards 18 Reference 21 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 1 of GB/T 46150 Boilers and Pressure Vessels. GB/T 46150 has been published in the following parts. --- Part 1.Performance requirements; --- Part 2.GB/T 46150.1 Conformity inspection procedure requirements. This document is modified to adopt ISO 16528-1.2007 “Boilers and pressure vessels — Part 1.Performance requirements”. Compared with ISO 16528-1.2007, this document has the following structural adjustments. --- Chapters 3 to 9 correspond to Chapters 2 to 8 of ISO 16528-1.2007. The technical differences between this document and ISO 16528-1.2007 and their reasons are as follows. ---Changed the scope of pressure vessels and boilers to be consistent with the requirements of Chinese regulations; --- Added the normative reference documents GB/T 2900.48 and GB/T 26929 related to terminology, and deleted "boiler" and "pressure vessel" The terms and definitions of "construction", "maximum allowable pressure", "owner", etc., and the terms "inspection", "manufacturer", and "third-party inspection agency" have been changed. In order to adapt to my country's technical conditions, the definition of "certification" has been changed to be consistent with the current version of the relevant international standards. maintain consistency with the definition of “certificate”; ---Changes to the user and construction party (contractor/design client), manufacturing unit and third-party inspection agency (supervision and inspection agency) The responsibilities of the designer have been increased to adapt to my country's technical conditions; --- Added some technical requirements related to materials, design, manufacturing, appearance inspection and non-destructive testing, final inspection and testing to meet the requirements of In response to my country's technical conditions, improve operability; --- Deleted the manufacturing unit inspection in the conformity assessment and added supervisory inspection to adapt to my country's technical conditions and improve operability; --- Increased failure modes that may be caused by damage and improved operability; --- Deleted the explanatory content in the background and introduction, deleted the standard type, added some principle requirements for standard selection, added boiler and The design principles of pressure vessels under complex working conditions are to adapt to my country's technical conditions and improve operability. The following editorial changes have been made to this document. ---Added references. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the National Technical Committee for Standardization of Boilers and Pressure Vessels (SAC/TC262). This document was drafted by. China Special Equipment Testing and Research Institute, Hefei General Machinery Research Institute Co., Ltd., State Administration for Market Regulation Bureau, Sinopec Engineering Construction Co., Ltd., China Huanqiu Engineering Corporation Beijing Branch, First Heavy Industries Group Dalian Nuclear Power Petrochemical Co., Ltd., Harbin Boiler Plant Co., Ltd., China Petroleum & Chemical Corporation. The main drafters of this document are. Jia Guodong, Chen Xuedong, Shao Shanshan, Shi Jin, Li Jun, Yuan Shaoyun, Jiang Xiaowen, Zhou Fengge, Tang Hui, Yuan Yilin, Zhou Yu, Xu Feng, Ren Gang, Xie Guoshan, Wang Hui, and Han Zhiyuan.

introduction

GB/T 46150 Boilers and Pressure Vessels specifies the performance requirements for boiler and pressure vessel construction based on failure modes. GB/T 46150 is composed of two parts. --- Part 1.Performance requirements. Obligations and responsibilities of all parties involved in the construction of boilers and pressure vessels, failure modes to be considered, and The technical requirements in terms of materials, design, manufacturing, inspection, etc. are explained. --- Part 2.GB/T 46150.1 Conformity inspection procedure requirements. Provides a standardized procedure for identifying boilers and Whether the pressure vessel product standards comply with the relevant requirements of GB/T 46150.1. Boilers and pressure vessels Part 1.Performance requirements

1 Scope

This document specifies performance requirements for the construction of boilers and pressure vessels. This document applies to the construction requirements of boilers and pressure vessels, and does not include requirements for operation, maintenance and inspection of in-service equipment. The scope of pressure vessels is as follows. a) Pressure vessel body, including the groove of the first circumferential joint where the pressure vessel is welded (bonded) to the external pipe or device surface, the first threaded joint end face of the threaded connection, the first flange sealing surface of the flange connection, the special connector or pipe fitting The first sealing surface of the connection, the pressure cover of the pressure vessel opening and its fasteners, the connection between the non-pressure component and the pressure component welds; b) Safety accessories and instruments directly connected to pressure vessels; c) Non-pressure components directly connected to the pressure vessel, such as supports, skirts, etc. The scope of boiler is defined as follows. a) Boiler body, including drum (shell), start-up (steam-water) separator and water storage tank, heating surface, header and its connecting pipes, furnace, combustion chamber, The whole consists of equipment, air preheater, furnace wall, smoke (air) duct, structure (including platform and escalator), etc. b) Pipes within the boiler area, including. 1) Power station boiler, including main feed water pipe, main steam pipe, reheat steam pipe, etc. and the area within the first valve (excluding valve the branch pipe of the gate (the same below); 2) For boilers other than power station boilers, which are equipped with steam (water, oil) separation tanks (hereinafter referred to as "separate steam tanks"), including the outlet of the feed water (oil) pump The pressure pipe within the first circumferential weld connecting the outlet of the sub-cylinder and the external pipe; if there is no sub-cylinder, including The pressure pipeline from the outlet of the water (oil) pump to the main steam (water, oil) outlet valve. Note. The main feedwater pipeline refers to the pipeline from the check valve at the outlet of the feedwater pump to the inlet header of the economizer; the main steam pipeline refers to the pipeline from the outlet header of the final superheater to the steam turbine. The pipeline within the high-pressure main steam valve (for boilers operated by main pipe, to the first valve before the main pipe); the reheat steam cold section pipeline refers to the turbine exhaust check valve. The reheat steam hot section pipeline refers to the pipeline from the last stage reheater outlet header to the turbine medium pressure main steam valve. c) Safety accessories and instruments. d) Auxiliary equipment and systems. This document does not apply to nuclear components, railway and marine boilers, marine pressure vessels, gas cylinders, oxygen tanks, piping systems and mechanical equipment such as turbines. Machine and mechanical casing.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 2900.48 Electrical terminology - Boiler GB/T 26929 Terminology for Pressure Vessels

3 Terms and Definitions

The terms and definitions defined in GB/T 26929, GB/T 2900.48 and the following apply to this document.
...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 46150.1-2025_English be delivered?


Answer: Upon your order, we will start to translate GB/T 46150.1-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 46150.1-2025_English with my colleagues?


Answer: Yes. The purchased PDF of GB/T 46150.1-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
Refund Policy Privacy Policy Terms of Service