Path:
Home >
GB/T >
Page106 > GB/T 45754-2025
Price & Delivery
US$539.00 · In stock · Download in 9 secondsGB/T 45754-2025: Technical specifications for equipment of converter primary flue gas dry cleaning and recovery system
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 45754-2025 | English | 539 |
Add to Cart
|
5 days [Need to translate]
|
Technical specifications for equipment of converter primary flue gas dry cleaning and recovery system
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 45754-2025 (GB/T45754-2025) |
| Description (Translated English) | Technical specifications for equipment of converter primary flue gas dry cleaning and recovery system |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | Z05 |
| Classification of International Standard | 13.020 |
| Word Count Estimation | 26,220 |
| Date of Issue | 2025-05-30 |
| Date of Implementation | 2025-09-01 |
| Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 45754-2025: Technical specifications for equipment of converter primary flue gas dry cleaning and recovery system
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 13.020
CCSZ05
National Standard of the People's Republic of China
Converter primary flue gas dry purification and gas recovery system
Equipment Specifications
Released on 2025-05-30
2025-09-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of contents
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 2
4 System composition and performance parameters 2
4.1 System composition 2
4.2 Performance parameters 4
5 Technical Requirements 4
5.1 General requirements 4
5.2 Technical requirements for main mechanical equipment 5
5.3 Technical requirements for hydraulic equipment 12
5.4 Technical requirements for electrical equipment 12
5.5 Safety and environmental protection requirements 13
6 Test methods 13
6.1 Withstand voltage test 13
6.2 No-load test 13
6.3 Load test 15
7 Inspection Rules 16
8 Marking, packaging, transportation and storage 16
8.1 Sign 16
8.2 Packaging 16
8.3 Transportation17
8.4 Storage 17
Reference 18
Figure 1 Typical process layout of converter primary flue gas dry purification and gas recovery system equipment 3
Figure 2 Evaporative cooler 5
Figure 3 Cylindrical electrostatic precipitator 6
Figure 4 Fan system 9
Figure 5 Gas switching station 10
Figure 6 Gas cooler 11
Figure 7 Dispersion chimney 12
Table 1 Performance parameters 4
Table 2 Installation requirements 7
Table 3 Evaporative cooler no-load test 14
Table 4 Fan no-load test 14
Table 5 No-load test run of gas switching station 14
Table 6 No-load test run of gas cooler 14
Table 7 No-load test run of the chimney 15
Table 8 Load test 15
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document is proposed and coordinated by the National Technical Committee for Metallurgical Equipment Standardization (SAC/TC409).
This document was drafted by. China Heavy Machinery Research Institute Co., Ltd., Xi'an Jiaotong University, Taiyuan Tongze Intelligent Engineering Co., Ltd.
Company, Yanshan University, Taiyuan University of Technology, Anshan Iron and Steel Co., Ltd., Qingdao Special Steel Co., Ltd., Anyang Iron and Steel Group Xinyang Iron and Steel Co., Ltd.
Company, Zhejiang Yiwu Xingyao Fan Co., Ltd., Jiangsu Shentong Valve Co., Ltd., Erzhong (Deyang) Heavy Equipment Co., Ltd., Shaanxi Metallurgical
Jin Design Institute Co., Ltd., Xi'an Haiwei Xincheng Inspection and Testing Consulting Co., Ltd., and Shanghai Xizhong Institute Heavy Machinery Complete Equipment Co., Ltd.
The main drafters of this document are. Li Yonghui, Li Xinqiang, Qiu Mingjun, He Bo, Wu Jianbing, Guo Qichao, Wu Liang, Hong Jun, Lin Qiyin, Yao Jing, Wang Yonggang,
Zhao Shengdun, Zhang Yupu, Liu Jie, Lai Zhiqiang, Zhai Yujie, Zhang Juan, Li Chaoyang, Wang Tao, Wang Shuqian, Zheng Yunxing, Tao Youzhi, Zhang Yong, Liu Baolong, Wei Lixin,
Wang Xin, Yang Chaogang, Li Ting, Liu Yaxing, Wang Yongfei, Zhang Xingye, Qiu Lipeng, Hu Yanghu, Ren Kaiyou, Zhou Junmin, Liu Tongsheng, Gu Dapeng, Lei Gang,
Liu Junping, Li Wanjun, Ai Hua, Du Xuebin, Cui Mingyuan, Xu Dan, Bian Jing, Xu Wenfei, Cui Ning, Zhang Lei, Ren Zhongkai, Zhao Song, Zhao Jie, Zhang Luman,
Yang Guojun, Gao Lu, and Wang Jiaqing.
Converter primary flue gas dry purification and gas recovery system
Equipment Specifications
1 Scope
This document specifies the composition, performance parameters and technical requirements of the equipment for the dry purification of primary flue gas and gas recovery system of the converter, and describes the relevant
The relevant test methods are specified, and the inspection rules, marking, packaging, transportation and storage are stipulated.
This document applies to the manufacture and installation of equipment for dry purification of primary flue gas and gas recovery system of converter.
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 191 Pictorial markings for packaging, storage and transportation
GB/T 985.1 Recommended grooves for gas welding, arc welding, gas shielded welding and high energy beam welding
GB/T 985.2 Recommended groove for submerged arc welding
GB/T 3766 General rules and safety requirements for hydraulic transmission systems and their components
GB 4053 (all parts) Safety requirements for fixed steel ladders and platforms
GB/T 4830 Industrial Automation Instrument Gas Source Pressure Range and Quality
GB/T 4879 Anti-rust packaging
GB 6222 Gas Safety Regulations for Industrial Enterprises
GB/T 7935 General technical requirements for hydraulic components
GB/T 13283 Accuracy grades of test instruments and display instruments for industrial process measurement and control
GB/T 13931 Test method for performance of electrostatic precipitator
GB/T 14039-2002 Code for solid particle contamination level of hydraulic transmission oil
GB/T 16845 Dust Collector Terminology
GB/T 25133 Flushing method for hydraulic system assembly pipelines
GB/T 37400.1 General technical requirements for heavy machinery Part 1.Product inspection
GB/T 37400.3 General technical requirements for heavy machinery Part 3.Welded parts
GB/T 37400.6 General technical requirements for heavy machinery Part 6.Steel castings
GB/T 37400.8 General technical requirements for heavy machinery Part 8.Forgings
GB/T 37400.9 General technical requirements for heavy machinery Part 9.Cutting parts
GB/T 37400.10 General technical requirements for heavy machinery Part 10.Assembly
GB/T 37400.11 General technical requirements for heavy machinery Part 11.Piping
GB/T 37400.12 General technical requirements for heavy machinery Part 12.Painting
GB/T 37400.13 General technical requirements for heavy machinery Part 13.Packaging
GB/T 37400.16 General technical requirements for heavy machinery Part 16.Hydraulic system
GB/T 41318 Ventilation Muffler
GB 50051 Chimney Design Code
GB 50052 Design specification for power supply and distribution systems
GB 50057 Code for Lightning Protection Design of Buildings
...