Path:
Home >
GB/T >
Page499 > GB/T 44579-2024
Price & Delivery
US$359.00 · In stock · Download in 9 secondsGB/T 44579-2024: Water distribution and collection devices of thermoplastics materials
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 44579-2024 | English | 359 |
Add to Cart
|
4 days [Need to translate]
|
Water distribution and collection devices of thermoplastics materials
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 44579-2024 (GB/T44579-2024) |
| Description (Translated English) | Water distribution and collection devices of thermoplastics materials |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | G33 |
| Classification of International Standard | 83.140.30 |
| Word Count Estimation | 18,158 |
| Date of Issue | 2024-09-29 |
| Date of Implementation | 2025-04-01 |
| Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 44579-2024: Water distribution and collection devices of thermoplastics materials
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Water distribution and collection devices of thermoplastics materials
Thermoplastic manifolds
ICS 83.140.30
CCS G33
National Standard of the People's Republic of China
Released on 2024-09-29
2025-04-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface ... Ⅲ
1 Scope ... 1
2 Normative references ... 1
3 Terms and Definitions 2
4 Symbols and abbreviations ... 2
4.1 Symbols 2
4.2 Abbreviations ... 2
5 Materials and components ... 3
5.1 Manifold ... 3
5.2 Valves ... 3
5.3 Seals ... 3
6 Design ... 3
7 Requirements ... 4
7.1 Appearance ... 4
7.2 Color ... 4
7.3 Dimensions ... 4
7.4 Hydrostatic strength ... 5
7.5 Physical and mechanical properties of manifolds 6
7.6 Sealing of assemblies 7
7.7 Hydraulic balance performance ... 7
7.8 Transmittance ... 7
7.9 Hygiene requirements 7
7.10 Thermal Cycle Test ... 7
7.11 Pull-off test 8
8 Test methods ... 8
8.1 State Adjustment ... 8
8.2 Appearance and color ... 8
8.3 Dimensions ... 8
8.4 Hydrostatic strength ... 8
8.5 Melt mass flow rate change rate ... 8
8.6 Oxidation Induction Time 8
8.7 Ash content ... 8
8.8 Density ... 8
8.9 Vicat softening temperature 9
8.10 Oven test ... 9
8.11 Drop test 9
8.12 Pigment Dispersion ... 9
8.13 Sealing test 9
8.14 Hydraulic balance performance 9
8.15 Transmittance ... 9
8.16 Hygiene requirements 9
8.17 Thermal Cycle Test 9
8.18 Pull-off test 9
9 Inspection Rules ... 10
9.1 Inspection categories 10
9.2 Batching and Grouping 10
9.3 Factory Inspection 10
9.4 Type inspection 10
9.5 Decision Rules 11
10 Marking, packaging, transportation and storage 11
10.1 Logo 11
10.2 Packaging ... 11
10.3 Transportation 11
10.4 Storage 11
11 Technical Description ... 11
Appendix A (Informative) Technical Description ... 12
References ... 13
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting is required.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by China Light Industry Federation.
This document is under the jurisdiction of the National Technical Committee for Standardization of Plastic Products (SAC/TC 48).
This document was drafted by. Shanghai Xinling Valve Co., Ltd., Shanghai Baidie Pipe Technology Co., Ltd., Zhejiang Weixing New Building Materials Co., Ltd.
Co., Ltd., Aikang Enterprise Group (Zhejiang) Co., Ltd., Fiso Measurement and Control Technology (Suzhou) Co., Ltd., Tianjin Junxing Pipe Industry Group
Group Co., Ltd., Zhejiang Zhongcai Pipeline Technology Co., Ltd., Hangzhou Hefeng Plastic Co., Ltd., and Jiangsu Pinsheng Pipe Industry Co., Ltd.
The main drafters of this document are. Zhu Liping, Chai Gang, Jin Tiebiao, Yang Xingyue, Zhang Xian, Wu Xiaofen, Wang Baiti, Zhu Xiaoyong, Yang Yichen,
Tang Hui.
Thermoplastic manifolds
1 Scope
This document specifies the materials, design, requirements, and test methods of thermoplastic manifolds and manifolds (hereinafter referred to as "manifolds")
Methods, inspection rules, marking, packaging, transportation and storage.
This document applies to the manufacture and testing of manifolds in building hot and cold water, drinking water, heating/cooling, water treatment and other systems.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies.
in this document.
GB/T 1033.1 Plastics - Determination of density of non-cellular plastics - Part 1.Immersion method, liquid pycnometer method and titration method
GB/T 2828.1 Sampling procedures for inspection by attributes Part 1.Sampling plans for batch inspection based on acceptance quality limit (AQL)
GB/T 2918 Standard environment for conditioning and testing of plastic specimens
GB/T 3682.1 Plastics - Determination of melt mass flow rate (MFR) and melt volume flow rate (MVR) of thermoplastics
Part 1.Standard methods
GB/T 6111 Determination of the resistance to internal pressure of thermoplastic piping systems for fluid transportation
GB/T 8801 Drop test method for rigid polyvinyl chloride (PVC﹘U) pipe fittings
GB/T 8802 Determination of Vicat softening temperature of thermoplastic pipes and fittings
GB/T 8803 Injection molding rigid polyvinyl chloride (PVC﹘U), chlorinated polyvinyl chloride (PVC﹘C), acrylonitrile﹘butadiene﹘benzene
Ethylene terpolymer (ABS) and acrylonitrile-styrene-acrylate terpolymer (ASA) pipes and fittings - Hot oven test method
GB/T 8806 Determination of dimensions of plastic parts for plastic piping systems
GB/T 9345.1-2008 Determination of ash content in plastics Part 1.General method
GB/T 10002.1-2023 Rigid polyvinyl chloride (PVC﹘U) pipes for water supply
GB/T 10002.2 Rigid polyvinyl chloride (PVC﹘U) pipe fittings for water supply
GB/T 13663.3 Polyethylene (PE) piping systems for water supply Part 3.Pipe fittings
GB/T 15820 Pull-out test for connections between polyethylene pressure pipes and fittings
GB/T 17219 Safety evaluation standard for drinking water transmission and distribution equipment and protective materials
GB/T 18251 Determination of the dispersion of pigments or carbon black in polyolefin pipes, fittings and compounds
GB/T 18742.3 Polypropylene piping systems for hot and cold water Part 3.Fittings
GB/T 18993.3 Chlorinated polyvinyl chloride (PVC﹘C) piping systems for hot and cold water Part 3.Pipe fittings
GB/T 19278 General terms and definitions for thermoplastic pipes, fittings and valves
GB/T 19466.6 Plastics Differential Scanning Calorimetry (DSC) Part 6.Oxidation Induction Time (Isothermal OIT) and Oxidation
Determination of induced temperature (dynamic OIT)
GB/T 19473.3 Polybutylene (PB) piping systems for hot and cold water Part 3.Pipe fittings
GB/T 19993 Thermal cycle test method for thermoplastic piping systems for hot and cold water - pipe and fitting combination systems
GB/T 20207.2 Acrylonitrile﹘butadiene﹘styrene (ABS) pressure piping systems Part 2.Fittings
GB/T 21300 Determination of opacity of plastic pipes and fittings
GB/T 28494 Thermoplastic stop valve
...