Path:
Home >
GB/T >
Page30 > GB/T 41037-2021
Price & Delivery
US$559.00 · In stock · Download in 9 secondsGB/T 41037-2021: Assurance requirements for system in package for space applications
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 41037-2021 | English | 559 |
Add to Cart
|
5 days [Need to translate]
|
Assurance requirements for system in package for space applications
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 41037-2021 (GB/T41037-2021) |
| Description (Translated English) | Assurance requirements for system in package for space applications |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | V25 |
| Word Count Estimation | 29,288 |
| Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 41037-2021: Assurance requirements for system in package for space applications
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Assurance requirements for system in package for space applications
ICS 49:060
CCSV25
National Standards of People's Republic of China
System-in-Package (SiP) Assurance Requirements for Aerospace
Published on 2021-12-31
2022-07-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms, Definitions and Abbreviations 1
3:1 Terms and Definitions 1
3:2 Abbreviations 2
4 Basic requirements 2
5 SiP Assurance Process 2
6 SiP Process Capability Guarantee4
6:1 SiP Process Capability Recognition 4
6:2 Maintenance of SiP Process Capability 4
7 SiP Device Guarantee5
7:1 Requirements Analysis 5
7:2 Design Assurance 5
7:3 Evaluation and Verification 7
7:4 Identification 8
7:5 Quality Assurance of Installed Products8
8 Guaranteed results9
Appendix A (Informative) SiP Process Capability Domain Definition 10
Appendix B (Informative) SiP Process Capability Area Evaluation Test Vehicle (TVCE) 15
Appendix C (normative) SiP Process Capability Area Assessment Test Implementation and Reporting Requirements 18
Appendix D (Informative) SiP Process Capability Area Approval Test 23
foreword
This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules of Standardization Documents"
drafted:
Please note that some content of this document may be patented: The issuing agency of this document assumes no responsibility for identifying patents:
This document is proposed and managed by the National Standardization Technical Committee of Aerospace Technology and Its Application (SAC/TC425):
This document is drafted by: China Academy of Space Technology:
The main drafters of this document: Gu Hantian, Zhang Wei, Zhu Hengjing, Zhang Yanwei, Kuang Qianwei, Zhu Ming, Jiang Jindong, Zhang Liang, Wang Zhibin:
System-in-Package (SiP) Assurance Requirements for Aerospace
1 Scope
This document specifies the basic requirements, assurance process, process capability assurance, device assurance, assurance of system-in-package (SiP) assurance for aerospace applications
related requirements for results:
This document applies to the assurance work of hermetic SiP devices with complex functional structures: Others integrate optoelectronics, micro-electromechanical systems, etc:
The SiP device with heterostructure is used for reference:
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text: Among them, dated citations
documents, only the version corresponding to that date applies to this document: For undated references, the latest edition (including all amendments) applies to
this document:
GB/T 4589:1-2006 Semiconductor Devices Part 10: General Specification for Discrete Devices and Integrated Circuits
GB/T 7826 System Reliability Analysis Technique Failure Mode and Effects Analysis (FMEA) Procedure
GB/T 7829 Fault Tree Analysis Program
GB/T 25000:1 System and Software Engineering System and Software Quality Requirements and Evaluation (SQuaRE) Part 1: SQuaRE Guidelines
GB/T 28172 Embedded Software Quality Assurance Requirements
GB/T 29074 Requirements for the identification of aerospace components
3 Terms, Definitions and Abbreviations
3:1 Terms and Definitions
The terms and definitions defined in GB/T 29074 and GB/T 25000:1 and the following terms and definitions apply to this document:
3:1:1
System-in-package systeminpackage; SiP
Provides a collection of different functional components that relate to a system or subsystem function and are assembled in a unit:
Note: A SiP can optionally contain passive components, microelectromechanical systems (MEMS), optical components, other packages and devices:
3:1:2
processcapabilitydomainanditsboundaries
The production line elements within a certain range determined by the SiP production plant are solidified by the Process Validation Document (PID) and passed through the specified process performance:
The scope of the process technology determined by the force approval process:
Note: The process technology category should have clear and quantifiable evaluation boundaries:
3:1:3
processcapabilityevaluation
The SiP manufacturer formulates an evaluation test program for the determined process capability domain and its boundaries, adopts the test carrier, and conducts tests according to the specified requirements:
The evaluation test is carried out, and the general name of the evaluation conclusion is given:
3:1:4
processcapabilityapproval
For the production line, it is characterized by the process characteristics of the products produced by the production line:
...