Path:
Home >
GB/T >
Page30 > GB/T 39346-2020
Price & Delivery
US$339.00 · In stock · Download in 9 secondsGB/T 39346-2020: Space hall electric propulsion power processing unit test method
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 39346-2020 | English | 339 |
Add to Cart
|
4 days [Need to translate]
|
Space hall electric propulsion power processing unit test method
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 39346-2020 (GB/T39346-2020) |
| Description (Translated English) | Space hall electric propulsion power processing unit test method |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | V25 |
| Classification of International Standard | 49.035 |
| Word Count Estimation | 18,174 |
| Date of Issue | 2020-11-19 |
| Date of Implementation | 2021-06-01 |
| Quoted Standard | GB/T 13722-2013; GB/T 14714-2008 |
| Regulation (derived from) | National Standard Announcement No. 26 of 2020 |
| Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
| Summary | This standard specifies the test methods for the functions and main performance parameters of the space hall electric propulsion power processing unit (hereinafter referred to as the "power processing unit"). This standard applies to the testing of power processing units. |
GB/T 39346-2020: Space hall electric propulsion power processing unit test method
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Space Hall electric propulsion power processing unit test method)
ICS 49.035
V25
National Standards of People's Republic of China
Space Hall electric propulsion power processing unit test method
2020-11-19 released
2021-06-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅰ
1 Scope 1
2 Normative references 1
3 Terms, definitions and abbreviations 1
3.1 Terms and definitions 1
3.2 Abbreviations 2
4 General requirements 2
4.1 Test equipment 2
4.2 Test site 2
4.3 Test environment conditions 2
4.4 Tester 2
5 Power processing unit and its test items 3
5.1 Power processing unit system configuration 3
5.2 Power processing unit composition 3
5.3 Test item 3
6 Test method 6
6.1 Overall function and performance test 6
6.2 Performance test of voltage source module 9
6.3 Performance test of current source module 12
6.4 Performance test of pulse voltage source module 14
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents.
This standard was proposed and managed by the National Aerospace Technology and Application Standardization Technical Committee (SAC/TC425).
Drafting organizations of this standard. 771 Research Institute of the Ninth Research Institute of China Aerospace Science and Technology Corporation, China Aerospace Science and Technology Corporation
The Eighth Research Institute of the company.
The main drafters of this standard. Zhang Xinping, Liao Yan, Cheng Weimin, Zhang Jianyu, Zhang Min, Shi Leilei, Wei Liqiu, Yang Xu, Cai Zheng, Cui Xiaochuan, Li Zhi,
Zhao Yuping, Yang Yang, Song Dan.
Space Hall electric propulsion power processing unit test method
1 Scope
This standard specifies the functions and main performance parameters of the space hall electric propulsion power processing unit (hereinafter referred to as "power processing unit")
testing method.
This standard applies to the testing of power processing units.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this document.
For undated references, the latest version (including all amendments) applies to this document.
GB/T 13722-2013 Technical requirements and test methods for mobile communication power supplies
GB/T 14714-2008 General specification for switching power supply for microcomputer system equipment
3 Terms, definitions and abbreviations
3.1 Terms and definitions
The following terms and definitions defined in GB/T 13722-2013 and GB/T 14714-2008 apply to this document.
3.1.1
Output voltage accuracy
The accuracy of the measured value of the output voltage of the power module relative to the set value is calculated according to formula (1).
3.1.2
Output current accuracy
The accuracy of the measured value of the output current of the power module relative to the set value is calculated according to formula (2).
3.1.3
Minimum control step
Under the premise of ensuring the linearity of the output voltage/current, the minimum output voltage/current step amplitude can be set.
...