US$279.00 · In stock · Download in 9 secondsGB/T 37911.2-2019: Application interface of BDS timing for power system -- Part 2: Testing specification
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 37911.2-2019 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Application interface of BDS timing for power system -- Part 2: Testing specification
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 37911.2-2019 (GB/T37911.2-2019) |
| Description (Translated English) | Application interface of BDS timing for power system -- Part 2: Testing specification |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | M50 |
| Classification of International Standard | 33.200 |
| Word Count Estimation | 14,137 |
| Date of Issue | 2019-08-30 |
| Date of Implementation | 2020-03-01 |
| Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 37911.2-2019: Application interface of BDS timing for power system -- Part 2: Testing specification
---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT37911.2-2019
(Power system Beidou satellite timing application interface Part 2. Inspection specifications)
ICS 33.200
M50
National Standards of People's Republic of China
Power system Beidou satellite timing application interface
Part 2. Test Specifications
ApplicationinterfaceofBDStimingforpowersystem-
Part 2. Testing specification
Published on.2019-08-30
2020-03-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword I
Introduction II
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Abbreviations 3
5 Composition 3
5.1 Overview 3
5.2 Beidou satellite timing time synchronization device composition 3
5.3 Beidou satellite timing application interface composition 4
6 Testing requirements 4
6.1 Environmental conditions 4
6.2 Test Equipment 5
7 Test Method 6
7.1 Test principle 6
7.2 Interface Test 6
7.3 Functional Test 8
7.4 Environmental Test 9
7.5 Power Adaptation Test 9
7.6 Insulation performance test 9
7.7 Mechanical performance test 10
7.8 Electromagnetic Compatibility Test 10
Foreword
GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is divided into the following two parts.
--- Part 1. Technical specifications;
--- Part 2. Test specifications.
This part is the second part of GB/T 37911.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents.
This part is proposed and managed by the Ministry of Industry and Information Technology of the People's Republic of China.
This section drafted by. China Electric Power Research Institute, National Electric Power Dispatch and Communication Center, State Grid Electric Power Research Institute, North China Electric Power
Engineering Co., Ltd., China Electronics Technology Standardization Institute, Beijing Sifang Jibao Automation Co., Ltd., Zhengzhou Wickham Technology Co., Ltd.
Co., Ltd., Wuhan Zhongyuan Huadian Technology Co., Ltd., China Southern Power Grid Super High Voltage Transmission Company, Shandong Kehui Power Automation Unit
Co., Ltd., Xuchang Kaipu Electrical Testing Technology Co., Ltd., Guodian NARI Technology Co., Ltd.
The main drafters of this section. Lu Tianjian, Nan Guilin, Shi Yuxiang, Zhang Daonong, Chen Qian, Hu Wei, Yang Yuqing, Deng Zhigang, Liu Lin, Wang Junyong,
Yu Yuehai, Wu Shuqin, Dong Yantao, He Chun, Xiong Chunhui, Han Shijie, Xu Zhijing, Yang Wei, Li Jinsong.
introduction
The purpose of compiling GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is to standardize the Beidou satellite navigation system as a standard
The application of quasi-time source in China's power system, and clarify the technical requirements and detection methods of the power system for the Beidou satellite timing application interface.
Multi-time source management of strong power systems to meet the needs of power system for time synchronization, improve power system security and stability control and accident analysis
Level, adapt to the needs of the development of China's power system.
Power system Beidou satellite timing application interface
Part 2. Test Specifications
1 Scope
This part of GB/T 37911 specifies the group of the power system Beidou satellite timing application interface and the Beidou satellite timing time synchronization device.
Formation, testing requirements, test methods, etc.
This part is applicable to the detection of the Beidou satellite timing application interface of the power system and the Beidou satellite timing time synchronization device.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2887-2011 General specification for computer sites
GB/T 9361-2011 Computer Site Safety Requirements
GB/T 13729-2002 Telecontrol terminal equipment
GB/T 17626.2-2018 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626.3-2016 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test
GB/T 17626.4-2018 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test
GB/T 17626.5-2008 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
GB/T 17626.6-2017 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity of RF field induction
GB/T 17626.8-2006 Electromagnetic compatibility test and measurement technology Power frequency magnetic field immunity test
GB/T 17626.9-2011 Electromagnetic compatibility test and measurement technology Pulse magnetic field immunity test
GB/T 17626.10-2017 Electromagnetic compatibility test and measurement technique Damping oscillating magnetic field immunity test
GB/T 17626.12-2013 Electromagnetic compatibility test and measurement technology ringing wave immunity test
GB/T 17626.29-2006 Electromagnetic compatibility test and measurement technology DC power input port voltage dip, short interruption and
Immunity test for voltage changes
GB/T 19391-2003 Global Positioning System (GPS) terms and definitions
GB/T 26866-2011 Time synchronization system test specification for power systems
GB/T 37911.1-2019 Power system Beidou satellite timing application interface Part 1. Technical specifications
DL/T 1100.1-2018 Time synchronization systems for power systems - Part 1. Technical specification
3 Terms and definitions
The following terms and definitions as defined in GB/T 19391-2003 and DL/T 1100.1-2018 apply to this document. For convenience
For use, some of the terms and definitions in GB/T 19391-2003 and DL/T 1100.1-2018 are repeated below.
3.1
Coordinated Universal Time universaltimecoordinated; UTC
World time is used as the initial reference for time, and atomic time is used as the standard time based on time unit (s).
[GB/T 19391-2003, definition 5.3]
GB/T 37911.2-2019
(Power system Beidou satellite timing application interface Part 2. Inspection specifications)
ICS 33.200
M50
National Standards of People's Republic of China
Power system Beidou satellite timing application interface
Part 2. Test Specifications
ApplicationinterfaceofBDStimingforpowersystem-
Part 2. Testing specification
Published on.2019-08-30
2020-03-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword I
Introduction II
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Abbreviations 3
5 Composition 3
5.1 Overview 3
5.2 Beidou satellite timing time synchronization device composition 3
5.3 Beidou satellite timing application interface composition 4
6 Testing requirements 4
6.1 Environmental conditions 4
6.2 Test Equipment 5
7 Test Method 6
7.1 Test principle 6
7.2 Interface Test 6
7.3 Functional Test 8
7.4 Environmental Test 9
7.5 Power Adaptation Test 9
7.6 Insulation performance test 9
7.7 Mechanical performance test 10
7.8 Electromagnetic Compatibility Test 10
Foreword
GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is divided into the following two parts.
--- Part 1. Technical specifications;
--- Part 2. Test specifications.
This part is the second part of GB/T 37911.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents.
This part is proposed and managed by the Ministry of Industry and Information Technology of the People's Republic of China.
This section drafted by. China Electric Power Research Institute, National Electric Power Dispatch and Communication Center, State Grid Electric Power Research Institute, North China Electric Power
Engineering Co., Ltd., China Electronics Technology Standardization Institute, Beijing Sifang Jibao Automation Co., Ltd., Zhengzhou Wickham Technology Co., Ltd.
Co., Ltd., Wuhan Zhongyuan Huadian Technology Co., Ltd., China Southern Power Grid Super High Voltage Transmission Company, Shandong Kehui Power Automation Unit
Co., Ltd., Xuchang Kaipu Electrical Testing Technology Co., Ltd., Guodian NARI Technology Co., Ltd.
The main drafters of this section. Lu Tianjian, Nan Guilin, Shi Yuxiang, Zhang Daonong, Chen Qian, Hu Wei, Yang Yuqing, Deng Zhigang, Liu Lin, Wang Junyong,
Yu Yuehai, Wu Shuqin, Dong Yantao, He Chun, Xiong Chunhui, Han Shijie, Xu Zhijing, Yang Wei, Li Jinsong.
introduction
The purpose of compiling GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is to standardize the Beidou satellite navigation system as a standard
The application of quasi-time source in China's power system, and clarify the technical requirements and detection methods of the power system for the Beidou satellite timing application interface.
Multi-time source management of strong power systems to meet the needs of power system for time synchronization, improve power system security and stability control and accident analysis
Level, adapt to the needs of the development of China's power system.
Power system Beidou satellite timing application interface
Part 2. Test Specifications
1 Scope
This part of GB/T 37911 specifies the group of the power system Beidou satellite timing application interface and the Beidou satellite timing time synchronization device.
Formation, testing requirements, test methods, etc.
This part is applicable to the detection of the Beidou satellite timing application interface of the power system and the Beidou satellite timing time synchronization device.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2887-2011 General specification for computer sites
GB/T 9361-2011 Computer Site Safety Requirements
GB/T 13729-2002 Telecontrol terminal equipment
GB/T 17626.2-2018 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626.3-2016 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test
GB/T 17626.4-2018 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test
GB/T 17626.5-2008 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
GB/T 17626.6-2017 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity of RF field induction
GB/T 17626.8-2006 Electromagnetic compatibility test and measurement technology Power frequency magnetic field immunity test
GB/T 17626.9-2011 Electromagnetic compatibility test and measurement technology Pulse magnetic field immunity test
GB/T 17626.10-2017 Electromagnetic compatibility test and measurement technique Damping oscillating magnetic field immunity test
GB/T 17626.12-2013 Electromagnetic compatibility test and measurement technology ringing wave immunity test
GB/T 17626.29-2006 Electromagnetic compatibility test and measurement technology DC power input port voltage dip, short interruption and
Immunity test for voltage changes
GB/T 19391-2003 Global Positioning System (GPS) terms and definitions
GB/T 26866-2011 Time synchronization system test specification for power systems
GB/T 37911.1-2019 Power system Beidou satellite timing application interface Part 1. Technical specifications
DL/T 1100.1-2018 Time synchronization systems for power systems - Part 1. Technical specification
3 Terms and definitions
The following terms and definitions as defined in GB/T 19391-2003 and DL/T 1100.1-2018 apply to this document. For convenience
For use, some of the terms and definitions in GB/T 19391-2003 and DL/T 1100.1-2018 are repeated below.
3.1
Coordinated Universal Time universaltimecoordinated; UTC
World time is used as the initial reference for time, and atomic time is used as the standard time based on time unit (s).
[GB/T 19391-2003, definition 5.3]
...