US$359.00 · In stock · Download in 9 secondsGB/T 34867.1-2017: Procedures for measurement and verification of motor-system energy-savings -- Part 1: Test procedures on working site for energy efficiency of motor
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 34867.1-2017 | English | 359 |
Add to Cart
|
4 days [Need to translate]
|
Procedures for measurement and verification of motor-system energy-savings -- Part 1: Test procedures on working site for energy efficiency of motor
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 34867.1-2017 (GB/T34867.1-2017) |
| Description (Translated English) | Procedures for measurement and verification of motor-system energy-savings -- Part 1: Test procedures on working site for energy efficiency of motor |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | K22 |
| Classification of International Standard | 29.160.30 |
| Word Count Estimation | 18,137 |
| Date of Issue | 2017-11-01 |
| Date of Implementation | 2018-05-01 |
| Regulation (derived from) | National Standard Announcement 2017 No. 29 |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 34867.1-2017: Procedures for measurement and verification of motor-system energy-savings -- Part 1: Test procedures on working site for energy efficiency of motor
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Procedures for measurement and verification of motor-system energy-savings-Part 1. Test procedures on working site for energy efficiency of motor
ICS 29.160.30
K22
National Standards of People's Republic of China
Energy saving measurement and verification method of motor system
Part 1. Motor site energy efficiency testing methods
Part 1.Testproceduresonworkingsiteforenergyefficiencyofmotor
Posted.2017-11-01
2018-05-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General Provisions 2
5 Determination of the test boundary 2
6 test location requirements 2
7 test instruments and reading requirements 2
8 test items and working procedures 3
9 Field Energy Efficiency Testing 3
Energy efficiency test methods and measurement uncertainty 5
11 on-site energy consumption test 6
Appendix A (informative) Motor no-load current and load loss recommended value 8
References 14
Foreword
This section GB/T 34867 "motor system energy saving measurement and test methods" part 1.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part is proposed by China Electrical Equipment Industry Association.
This part of the National Standardization Technical Committee rotating electrical (SAC/TC26) centralized.
This section drafted unit. Shanghai Electrical System Engineering Research Center Co., Ltd. energy efficiency, Shanghai Branch of the energy efficiency test system limited
Division, Jiangsu Universal Special Electric Co., Ltd., Shandong Huali Electric Group Co., Ltd., Zhejiang Jinlong Electric Co., Ltd., Anhui Ming
Teng permanent magnetic Mechanical and Electrical Equipment Co., Ltd., International Copper Association, Lanzhou Electric Co., Ltd., Guangzhou Zhiyuan Electronics Co., Ltd., Siemens
(China) Co., Ltd.
The main drafters of this section. Strong male, Wu Yanhong, Zhu Wenqin, Wang Qingdong, leaves, Merlot, Zhou Sheng, Wang Gen, Pan Wenwen, He Wenqi,
Yan Xiaoping.
Energy saving measurement and verification method of motor system
Part 1. Motor site energy efficiency testing methods
1 Scope
GB/T 34867 provisions of this part of the motor system, motor field efficiency and energy consumption test methods, including. General provisions,
Test boundary determination, test location requirements, test instrumentation and reading requirements, test items and work procedures, on-site energy efficiency testing, energy efficiency
Test methods and measurement uncertainty, on-site energy consumption test.
This section applies to drag the fan, pumps, compressors and other equipment, single-speed AC three-phase motor field test, variable speed motor can also be
Reference to use.
Note. In this section, energy efficiency is efficiency.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
Economic operation of three-phase asynchronous motors GB/T 12497-2006
GB/T 17167-2006 Energy consumption per unit of energy measuring instruments and management of general rules
GB/T 28750-2012 energy saving measurement and verification technology
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Motor system
By the motor, the device being driven, transmission, control (speed) devices and pipe network load, etc., through the electric motor into electricity
Mechanical energy, and then through the drag device (such as fans, pumps, compressors, machine tools, conveyors, etc.) work to achieve the desired function of the system.
[GB/T 29314-2012, Definition 3.1]
3.2
Test the boundary of the boundaryoftest
Boundary and geographic location of the equipment or system associated with the motor and its associated energy used to achieve the test.
3.3
Baseline baselineperiod
To compare and determine the amount of energy savings, energy-saving measures before the implementation of the time period.
[GB/T 28750-2012, Definition 3.3]
3.4
Statistical report period
To compare and determine the project energy saving, energy-saving measures after the implementation of the time period.
[GB/T 28750-2012, Definition 3.4]
...