GB/T 33783-2017 PDF English
Price & Delivery
US$319.00 · In stock · Download in 9 secondsGB/T 33783-2017: Testing guideline for programmable logic device software
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 33783-2017 | English | 319 | Add to Cart | 4 days [Need to translate] | Testing guideline for programmable logic device software |
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 33783-2017 (GB/T33783-2017) |
| Description (Translated English) | Testing guideline for programmable logic device software |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | L77 |
| Classification of International Standard | 35.080 |
| Word Count Estimation | 16,151 |
| Date of Issue | 2017-05-31 |
| Date of Implementation | 2017-12-01 |
| Quoted Standard | GB/T 8566-2007; GB/T 11457-2006; GB/T 20158-2006; GB/T 33781-2017; GB/T 33784-2017 |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
| Summary | This standard specifies the purpose, content, management, level, process, type and method of programmable logic device software testing. This standard applies to the testing of programmable logic device software. |
GB/T 33783-2017: Testing guideline for programmable logic device software
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Testing guideline for programmable logic device software ICS 35.080 L77 National Standards of People's Republic of China Programmable Logic Device Software Testing Guide 2017-05-31 released 2017-12-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface III 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 Test purpose 1 5 test content 2 6 Test Management 2 6.1 Process Management 2 6.2 Configuration Management 3 6.3 Review management 3 7 Test Level 3 7.1 Unit Test 3 7.2 Configuration Item Test 4 7.3 System Testing 4 Test process 4 8.1 Test planning 4 8.2 Test design and implementation 5 8.3 Test execution 5 8.4 Test summary 6 9 Test Type 6 9.1 Document review 6 9.2 Code Review 7 9.3 Code Walk 7 9.4 logic test 7 9.5 Functional tests 7 9.6 performance test 7 9.7 timing test 8 9.8 Interface Test 8 9.9 Strength test 8 9.10 Balance test 8 9.11 security test 8 9.12 Boundary Test 8 9.13 Power Analysis 9 Test Method 9 10.1 Design Check 9 10.2 function anti-true 9 10.3 Gate level protection 9 10.4 timing simulation 9 10.5 Static Timing Analysis 10.6 Logical equivalence check 10 10.7 Physical test 10 Appendix A (informative) Programmable logic device Software test level Correspondence with test type 11 Appendix B (informative) Programmable logic device Software test type Correspondence with test method 12