GB/T 29549.2-2013 PDF English
Price & Delivery
US$719.00 · In stock · Download in 9 secondsGB/T 29549.2-2013: Specifications for offshore modular drilling rigs on fixed platforms -- Part 2: Construction
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 29549.2-2013 | English | 719 | Add to Cart | 6 days [Need to translate] | Specifications for offshore modular drilling rigs on fixed platforms -- Part 2: Construction |
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 29549.2-2013 (GB/T29549.2-2013) |
| Description (Translated English) | Specifications for offshore modular drilling rigs on fixed platforms -- Part 2: Construction |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | E92 |
| Classification of International Standard | 75.180.10 |
| Word Count Estimation | 31,328 |
| Quoted Standard | GB 7691; GB/T 8423; GB/T 8923; GB/T 13288; GB 50166; GB/T 29549.1-2013; SY/T 0407; SY/T 5612; SY/T 5964; SY/T 6223; SY/T 6416; SY/T 6461; SY/T 6586; SY/T 10002; SY/T 10008; SY/T 10010; SY/T 10030; SY/T 10042; YB 3301 |
| Regulation (derived from) | National Standards Bulletin 2013 No. 9 |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
| Summary | This standard specifies the fixed platform module for offshore oil rigs (hereinafter referred to as module rigs) structures, pipelines, manufacturing and outfitting equipment installation and commissioning requirements. This section applies to the module |
GB/T 29549.2-2013: Specifications for offshore modular drilling rigs on fixed platforms -- Part 2: Construction
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specifications for offshore modular drilling rigs on fixed platforms.Part 2. Construction ICS 75.180.10 E92 National Standards of People's Republic of China Offshore oil fixed platform module drilling rig Part 2. Construction Part 2. Construction 2013-06-09 release 2014-01-01 Implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface III 1 Scope 1 2 normative reference document 1 3 terms, definitions and abbreviations 1 3.1 Terms and definitions 1 3.2 Abbreviations 2 4 basic requirements 2 4.1 Submission and approval of construction documents 2 4.2 Inspection, storage and traceability of materials and equipment 5 module structure construction 2 5.1 Construction site 2 5.2 prefabricated steel structure 5.3 Overall assembly 3 5.4 Welding 4 5.5 Welding inspection 4 6 module pipeline prefabrication and installation 6 6.1 Pipeline Prefabrication 6 6.2 Pipeline installation 6 6.3 Pressure test 7 6.4 Pipeline purge and cleaning 8 7 module outfitting construction 9 7.1 Installation 9 7.2 Quality inspection 9 8 module corrosion 10 8.1 Surface treatment 10 8.2 Painting Construction 10 Installation and commissioning of equipment 9.1 Installation of equipment 11 9.2 Equipment commissioning 12 10 module weighing, loading and fixing 16 10.1 Weighing 16 10.2 Shipping Method Selection 16 10.3 Submission and Approval of Shipping Documents 16 10.4 Loading and fixing 16 Appendix A (informative) Typical quality assurance and control documents 17 Appendix B (Informative Annex) List of Typical Construction Design Documents 18 Appendix C (informative) Typical DES build assembly flow chart 24 Appendix D (informative) Typical DSM build assembly flow chart 25 Appendix E (informative) Typical shipments and fixed design documents