Path:
Home >
GB/T >
Page116 > GB/T 28807-2012
Price & Delivery
US$714.00 · In stock · Download in 9 secondsGB/T 28807-2012: Railway applications -- Compatibility between rolling stock and train detection systems
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See
step-by-step procedureStatus: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| GB/T 28807-2012 | English | 714 |
Add to Cart
|
3 days [Need to translate]
|
Railway applications -- Compatibility between rolling stock and train detection systems
|
Click to Preview a similar PDF
Basic data
| Standard ID | GB/T 28807-2012 (GB/T28807-2012) |
| Description (Translated English) | Railway applications -- Compatibility between rolling stock and train detection systems |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | S04 |
| Classification of International Standard | 45.060 |
| Word Count Estimation | 36,374 |
| Quoted Standard | GB/T 21562-2008; ISO/IEC 17025; IEC 60850 |
| Adopted Standard | IEC 62427-2007, IDT |
| Regulation (derived from) | National Standards Bulletin 2012 No. 28 |
| Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
| Summary | This standard specifies the main agricultural water-saving irrigation equipment evaluation project evaluation, evaluation methods and evaluation rules. This standard applies to the major agricultural water-saving irrigation equipment, including self-primi |
GB/T 28807-2012: Railway applications -- Compatibility between rolling stock and train detection systems
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Railway applications. Compatibility between rolling stock and train detection systems
ICS 45.060
S04
National Standards of People's Republic of China
Rail
Compatibility between rolling stock and train detection systems
(IEC 62427.2007, IDT)
Issued on. 2012-11-05
2013-02-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
Introduction Ⅳ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 approval process 3
4.1 Summary 3
4.2 Responsibilities 4
4.3 Recognition Process 4
Case 6 4.4 compatibility
4.5 Quality Management 6
4.6 Line 7 confirmed
4.7 Features 7
4.8 Test 7
4.9 Compatibility Analysis 7
4.10 Approval Certificate 8
5 features the train detection system 8
5.1 Objective 8
8 5.2 Physical compatibility
5.3 Electromagnetic Compatibility 9
5.4 safety factor of 11
5.5 electromagnetic sensitivity of track circuit 11
5.6 The electromagnetic wheel detector sensitivity 11
5.7 Limit train detection system 12
5.8 interference signal produced locomotives and substations 12
5.9 Characterization Report 12
6 Locomotive feature 13
6.1 Objective 13
Its characteristics and influence factors 6.2 Locomotive description 14
6.3 Configuration (design condition) 14
6.4 Test Program 14
6.5 Test Report 15
6.6 Test results archive 15
7 Traction Power Supply System features 16
7.1 Objective 16
7.2 DC traction power supply 16
7.3 AC traction power supply 16
Appendix A (informative) train detection system to determine the electromagnetic sensitivity Guide 18
Annex B (informative) Locomotive 24 Characteristics Test Guidelines
Factors Appendix C (informative) Effect of rolling stock characteristics 25
Annex D (informative) DC traction power supply 26
Annex E (informative) AC traction power supply 28
References 30
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard uses the translation method identical with IEC 62427.2007 "rail rolling stock and train detection system compatibility."
Consistency correspondence with this standard Normative documents of the following documents.
--- GB/T 1402-2010 rail traction power supply system voltage (IEC 60850.2007, MOD);
--- GB/T 27025-2008 testing and calibration laboratories General requirements (ISO /IEC 17025.2005, IDT).
This standard made the following editorial changes.
--- Remove IEC 62427.2007 Introduction, paragraph 2, the European railway rolling stock and train detection systems electromagnetic compatibility notes;
--- 3 footnote to the list in Table 1;
--- The reference document IEC 62278 was adjusted to IEC 62278.2002, by 4.9 cited specific provisions.
--- Original 7.2 to the next level number only 7.2.1, does not comply with the rule number, so the suspension segment increased 7.2 number "7.2.1 General"
Original 7.2.1 to 7.2.2, a similar number of other sub-level changes, editorial changes to treatment with 7.3 7.2;
--- Appendix B only one chapter number, so the cancellation number B.1;
--- Appendix C is only one chapter number, so the cancellation number C.1;
--- Increased by reference.
The standard proposed by the People's Republic of China Ministry of Railways.
This standard by the national electric traction equipment and systems Standardization Technical Committee (SAC/TC278) centralized.
This standard is mainly drafted by. Zhuzhou CSR Times Electric Co., Ltd., Beijing Research and Design Institute whole way communication signals.
Units involved in the drafting of this standard. CSR Qingdao Sifang Locomotive Co., Ltd., China CNR Datong Electric Locomotive Co., Ltd.
the company.
The main drafters of this standard. Yi-Min Wang, Shen Dachuan.
Participation drafters of this standard. Yan Hun Sen, Huxue Yong, Xie Qu Bo, Dai Xiaofeng.
Introduction
This standard gives the rolling stock to run on a particular line of work does not interfere with the train detection system processes.
And electromagnetic compatibility is determined by the physical aspects. Electromagnetic compatibility EMC, the maximum permissible level of interference not only common values, and
The need to establish a simple method to determine the work that can be allowed on the specified line interference levels.
The main factor interfering follows.
--- Current track;
--- Field;
--- Voltage difference between the axles.
As shown in Figure 1.
FIG. 1 source of electromagnetic interference
Electromagnetic sensitivity of the actual system is determined by the following factors.
--- Single device system electromagnetic sensitivity;
--- Use the device, the system configuration.
Related matters track circuits and axle counter or wheel detection system separate study.
To determine the electromagnetic sensitivity train detection system proposed laboratory/simulation test method and the "real line" Test Method, mold
Quasi most adverse conditions. According to experience, the use of specific test areas and test the required evidence. According to the experience of the railway, the establishment of this standard is determined
General Method electromagnetic sensitivity train detection system viable.
Before measuring the interference of rolling stock, the relevant staff should have extensive knowledge of the circuit power equipment, namely car static converter frequency conversion
Rate, the power converter to adjust the type, the resonant frequency of each filter, the power supply over/under voltage operating limits, demotion work mode.
Rail
Compatibility between rolling stock and train detection systems
1 Scope
This standard describes the mutual recognition of rolling stock in a particular line required to run the program, describes the interference current, electromagnetic train detection system
Sensitivity, traction power supply characteristics and methods of measurement procedures. The results of the accreditation process to become "compatibility case" has a canonical format to meet
Proof of the compatibility criteria.
Approval procedure also applies to affect the compatibility of rolling stock, traction power supply or improve train detection system.
Compatibility is limited to the scope of the case to prove rolling stock and train detection systems characteristics (ie limits) compatibility. This standard train detection
System involves only track circuits or wheel detector.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 21562-2008 rail reliability, availability, maintainability and safety norms and examples (IEC 62278.
2002, IDT)
ISO /IEC 17025 General requirements for testing and calibration laboratories (Generalrequirementsforthecompetenceof
testingandcalibrationlaboratories)
IEC 60850 Rail Traction system supply voltage (Railwayapplications-Supplyvoltagesoftraction
systems)
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Accreditation department acceptingbody
Compatibility case evaluation and approval certificate issued by the responsible departments, the authorities designated by national regulations.
3.2
Compatibility Case compatibilityofcase
Records prove prescribed railway line or provision in railroad rolling stock, traction power supply and the degree of compatibility between train detection systems
document.
3.3
Approval certificate certificateofacceptance
Approved department signed acceptance of the compatibility case, allow new or improved systems in use certificates. Its relationship with the law by the state
determine.
3.4
Degraded Mode degradedmodes
Design preset mode Locomotive failure. Degraded mode generally allow rolling stock to complete its journey.
...