Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
Database: 221581 (27 Mar 2026)
SEARCH
Path: Home > GB/T > Page546 > GB/T 17744-2020

GB/T 17744-2020 PDF English

Price & Delivery

US$1519.00 · In stock · Download in 9 seconds
GB/T 17744-2020: Petroleum and natural gas industries - Drilling and well servicing equipment
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 17744: Historical versions

Std IDVersionUSDBuyDeliver [PDF] inTitle (Description)
GB/T 17744-2020English1519 Add to Cart 9 days [Need to translate] Petroleum and natural gas industries - Drilling and well servicing equipment
GB/T 17744-2015EnglishRFQ ASK 10 days [Need to translate] Petroleum and natural gas industries -- Drilling and well servicing equipment
GB/T 17744-2008EnglishRFQ ASK 14 days [Need to translate] Petroleum and natural gas industries -- Drilling and well servicing equipment
GB/T 17744-1999EnglishRFQ ASK 11 days [Need to translate] Specification for drilling equipment

Click to Preview a similar PDF

Basic data

Standard ID GB/T 17744-2020 (GB/T17744-2020)
Description (Translated English) Petroleum and natural gas industries - Drilling and well servicing equipment
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard E92
Classification of International Standard 75.180.10
Word Count Estimation 82,856
Date of Issue 2020-12-14
Date of Implementation 2021-11-01
Older Standard (superseded by this standard) GB/T 17744-2015
Regulation (derived from) National Standard Announcement No. 28 of 2020
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 17744-2020: Petroleum and natural gas industries - Drilling and well servicing equipment



---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Oil and gas industry drilling and workover equipment) ICS 75:180:10 E92 National Standards of People's Republic of China Replace GB/T 17744-2015 Oil and gas industry drilling and workover equipment 2020-12-14 release 2021-11-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee

Table of contents

Preface Ⅴ 1 Scope 1 2 Normative references 1 3 Terms and definitions, abbreviations 3 3:1 Terms and definitions 3 3:2 Abbreviations 7 4 Design 8 4:1 Design conditions 8 4:2 Strength analysis 8 4:3 Size class code 9 4:4 Rating 9 4:5 The rated load value is based on 9 4:6 Design safety factor 9 4:7 Shear strength 10 4:8 Specific equipment 10 4:9 Design files 10 5 Design verification 10 5:1 General 10 5:2 Design verification function test 11 5:3 Design verification pressure test 11 5:4 Design verification load test 12 5:5 Determination of rated load 12 5:6 Alternative Design Verification Test Procedure and Rating Calculation 13 5:7 Load test device 13 5:8 Design changes 14 5:9 Record 14 6 Material requirements 14 6:1 General 14 6:2 Written specifications 14 6:3 Metallic materials 14 6:4 Non-metallic and composite materials 18 7 Welding requirements 19 7:1 General 19 7:2 Welding qualification 20 7:3 Written documents 20 7:4 Welding consumables control 20 7:5 Weld performance 20 7:6 Post-weld heat treatment (PWHT) 20 7:7 Quality control requirements 20 7:8 Specific requirements-group welding 20 7:9 Specific requirements-repair welding 20 8 Quality control 21 8:1 General 21 8:2 Qualification of quality control personnel 21 8:3 Test equipment 21 8:4 Quality control of specific equipment and parts 21 8:5 Dimension verification 25 8:6 Proof load test 25 8:7 Hydrostatic pressure test 26 8:8 Function test 26 8:9 Process for requiring confirmation 26 9 Equipment 27 9:1 General 27 9:2 Turntable 27 9:3 Turntable Filling the Heart 34 9:4 Slip seat 34 9:5 Turntable slip 35 9:6 Chuck 36 9:7 High-pressure drilling fluid hose and high-pressure cement hose 37 9:8 Piston drilling pump parts 45 9:9 Winch parts 51 9:10 Manual pliers 52 9:11 Safety slips not used as lifting equipment 53 9:12 Blowout preventer (BOP) transport systems and equipment 53 9:13 Pressure relief device of high pressure drilling fluid circulation system 60 9:14 pliers tail rope 62 9:15 Rolling bearings 63 10 Mark 63 10:1 Product marking 63 10:2 Marking requirements 64 11 File 64 11:1 Record keeping 64 11:2 Files saved by the manufacturer 64 11:3 Random files carried by the device 64

Appendix A

(Normative appendix) Additional requirements 66

Appendix B

(Informative appendix) Heat treatment/thermal operation equipment qualification guide 68

Appendix C

(Informative appendix) Load limit design of manual tongs 70

Appendix D

(Informative appendix) Product order information 73 References 76

Foreword

This standard is in accordance with GB/T Drafting of the rules given in 1:1-2009: This standard replaces GB/T 17744-2015 "Petroleum and natural gas industry drilling and workover equipment", with GB/T 17744-2015 phase The main technical changes are as follows: ---In the "scope", 7 types of equipment have been deleted and 3 types of equipment have been added (see Chapter 1, Chapter 1 of the:2015 edition); ---Delete the requirements for power tongs and other equipment in the design, and increase the requirements for turntable slips, slip seats, etc: (see 4:1, 4:4, 4:6,:2015 Version 4:1, 4:4, 4:6); --- Modify the formula (3) in the design verification load test to Table 3 (see 5:4:3, 5:4:3 of the:2015 edition); ---Added the requirements for non-metallic materials (see 6:4); ---Added the requirements of acceptance criteria for non-metallic parts (see 8:4:7:5); ---The process of requiring confirmation has been added (see 8:9); ---Modified some of the requirements in the heart of the turntable (see 9:3, 9:3 in the:2015 edition); ---Deleted the content of standard turntable slips and non-standard turntable slips (see 9:4 and 9:5 in the:2015 edition); ---The contents of slip holder, turntable slip and chuck are added to the equipment (see 9:4~9:6); ---Working pressure is less than or equal to 51:7 The test pressure of MPa drilling hose and hose is changed from 2 times to 1:5 times (see Table 10, Table 9 of the:2015 edition); ---Modify the hydrostatic test pressure of the hose and damping hose to 1:5 times the working pressure (see 9:7:7:1,:2015 edition 9:6:7:1); ---Delete the manufacturer's name or trademark and standard number in the content of the equipment logo (see the:2015 version of 9:7, 9:8, 9:10, 9:12, 9:13, 9:14); ---The requirements for manual chucks, pneumatic or hydraulic chucks, and power tongs are deleted from the equipment (see 9:9~9:12 and 9: 15); --- SR2A in Appendix A is changed to only metal parts, and SR2B non-metal parts requirements are added (see Appendix A); --- Deleted the piston drilling pump term recommended in the original Appendix C (see Appendix C of the:2015 edition); ---Added Appendix C manual tongs load limit design (see Appendix C); ---Added Appendix D product order information (see Appendix D): This standard is approved by the National Petroleum Drilling Equipment and Tools Standardization Technical Committee (SAC/TC 96) Propose and focus: Drafting organizations of this standard: Baoji Petroleum Machinery Co:, Ltd:, National Engineering Research Center for Oil and Gas Drilling Equipment, Nanyang Erjishi Oil Equipment Group Co:, Ltd:, Lanzhou Lanshi Petroleum Equipment Engineering Co:, Ltd:, oil industry well control device quality supervision and inspection Xin, Sichuan Honghua Petroleum Equipment Co:, Ltd:, Sinopec Siji Petroleum Machinery Co:, Ltd: The main drafters of this standard: He Genliang, Jia Bingyan, Hao Jianxu, Wang Chunchun, Yu Lijun, Wei Kongcai, Liu Jiong, Yan Xiaoni, Liao Jiang, Tang Hao, Wang Xiaotong, Xu Jun: The previous versions of the standard replaced by this standard are as follows: ---GB/T 17744-1999, GB/T 17744-2008, GB/T 17744-2015: Oil and gas industry drilling and workover equipment

1 Scope

This standard specifies the design, manufacturing and quality control requirements of drilling and workover equipment and main load-bearing replacement parts: This standard applies to the following equipment: a) Turntable; b) Turntable to fill the heart; c) Slip seat; d) Manual and power turntable slips; e) Manual and power chuck; f) High-pressure drilling fluid and cement hose; g) Piston drilling pump parts; h) Winch parts; i) Manual pliers; j) Safety slips not used as lifting equipment; k) Blowout preventer (BOP) transport system; l) Pressure relief device for high pressure drilling fluid circulation system; m) The pliers tail rope:

2 Normative references

The following documents are indispensable for the application of this document: For dated reference documents, only the dated version applies to this article Pieces: For undated references, the latest version (including all amendments) applies to this document: GB/T 228:1 Tensile test of metallic materials Part 1: Room temperature test method GB/T 229 Charpy pendulum impact test method for metallic materials GB/T 8423 (all parts) Oil and gas industry terminology GB/T 8834 Determination of the physical and mechanical properties of fiber ropes GB/T 9253:2 Processing, measurement and inspection of casing, tubing and line pipe threads in the oil and gas industry GB/T 9445 Qualification and certification of non-destructive testing personnel GB/T 15169 Steel Fusion Welding Welder Skill Evaluation GB/T 16825:1 Inspection of static uniaxial testing machine Part 1: Inspection and test of force measuring system of tensile and (or) compression testing machine calibration GB/T 20174 Oil and gas drilling equipment drilling through equipment GB/T 22513 Oil and gas industry drilling and production equipment, wellheads and Christmas trees JB/T 8727 hydraulic hose assembly SY/T 5170 Steel wire rope for oil and gas industry SY/T 6666 Recommended practices for the selection and maintenance of steel wire ropes for the oil and gas industry SY/T 6727 Oil Rig Hydraulic Disc Brake
...

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 17744-2020_English be delivered?


Answer: Upon your order, we will start to translate GB/T 17744-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 17744-2020_English with my colleagues?


Answer: Yes. The purchased PDF of GB/T 17744-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 17744-2020?


Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 17744-2020 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
Refund Policy     Privacy Policy     Terms of Service