DL/T 1492.1-2016 PDF English
Price & Delivery
US$279.00 · In stock · Download in 9 secondsDL/T 1492.1-2016: Technical guideline for optimized control system in fossil fuel power plant Part 1: Fundermental requirements
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
| Std ID | Version | USD | Buy | Deliver [PDF] in | Title (Description) |
| DL/T 1492.1-2016 | English | 279 | Add to Cart | 3 days [Need to translate] | Technical guideline for optimized control system in fossil fuel power plant Part 1: Fundermental requirements |
Click to Preview a similar PDF
Basic data
| Standard ID | DL/T 1492.1-2016 (DL/T1492.1-2016) |
| Description (Translated English) | Technical guideline for optimized control system in fossil fuel power plant Part 1: Fundermental requirements |
| Sector / Industry | Electricity & Power Industry Standard (Recommended) |
| Classification of Chinese Standard | F24 |
| Classification of International Standard | 27.100 |
| Word Count Estimation | 12,195 |
| Date of Issue | 2016-01-07 |
| Date of Implementation | 2016-06-01 |
| Quoted Standard | GB/T 26863; DL/T 659; DL/T 701; DL/T 5175; DL 5190.4 |
| Regulation (derived from) | National Energy Board Announcement No. 1 of 2016; Industry Standard Record Announcement No. 2016 of 2016 (No. 197) |
| Issuing agency(ies) | National Energy Administration |
| Summary | This standard specifies the control objectives, composition framework, hardware configuration, software functions and the signal interaction mode of the conventional control system of the unit, etc., of the optimized control system of the individual power plant. This standard is applicable to the product configuration and technical application of the single optimization control system which is used together with the conventional control system of the thermal power generating set. For other non-individually configured optimization control system can refer to the implementation. |