Technological conditions of rack installation and acceptance
| Valid |
WB/T 1066-2017
|
PDF similar to WBT1066-2017
Basic data | Standard ID | WB/T 1066-2017 (WB/T1066-2017) | | Description (Translated English) | Technological conditions of rack installation and acceptance | | Sector / Industry | Chinese Industry Standard (Recommended) | | Classification of Chinese Standard | J83 | | Classification of International Standard | 53.080 | | Word Count Estimation | 10,122 | | Date of Issue | 2017-11-08 | | Date of Implementation | 2017-12-01 | | Regulation (derived from) | National Development and Reform Commission Notice 2017 No. 19 | | Issuing agency(ies) | National Development and Reform Commission of the People's Republic of China |
WBT1066-2017: Technological conditions of rack installation and acceptance---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technological conditions of rack installation and acceptance
ICS 53.080
J83
People's Republic of China Logistics Industry Standard
Shelf installation and acceptance technical conditions
Published on.2017-11-08
2017-12-01 implementation
The National Development and Reform Commission of the People's Republic of China released
Directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Installation and Acceptance Process 1
5 Installation Condition 2
6 Installation and Adjustment 3
7 Test 4
8 debugging 4
9 Acceptance 4
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the China Federation of Logistics and Purchasing.
This standard is under the jurisdiction of the National Logistics Standardization Technical Committee (SAC/TC269).
This standard was drafted by Nanjing Yinfei Storage Equipment (Group) Co., Ltd. and Jiangsu Liuwei Intelligent Logistics Equipment Co., Ltd.
Fujian Haoli Intelligent Technology Co., Ltd., Nanjing Product Quality Supervision and Inspection Institute, Hubei Materials Distribution Technology Research Institute, Shicang Intelligent Storage
Equipment (Shanghai) Co., Ltd.
The main drafters of this standard. Jin Yueyue, Sheng Lin, Xu Zhenglin, Wang Feng, Du Li, Li Tianyuan, Xiang Xiaowei, Lin Mingxiao, Su Kunxue, Xiao Jun, Yang Dewei,
Jia Meng and Fan Rui.
Shelf installation and acceptance technical conditions
1 Scope
This standard specifies the installation and acceptance procedures for storage racks, installation conditions, installation and adjustment, testing, commissioning and acceptance.
This standard is applicable to the installation and acceptance of assembled storage shelves with pillars, beams, cantilever beams, and guide rail beams as main load-bearing components. this
The standard does not apply to automated three-dimensional shelves, nor does it apply to unique structural shelves, such as rotating shelves and drawer shelves.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 30673-2014 Specification for Installation and Maintenance of Automated Stereoscopic Warehouses
GB/T 30675-2014 Attic shelves
GB 50205-2001 Specification for Construction Quality Acceptance of Steel Structure Engineering
JB/T 9018-2011 Automatic Stereo Warehouse Design Specification
JB/T 11270-2011 Three-Dimensional Warehouse Combined Steel Structure Shelf Specifications
WB/T 1042 shelf terms
WB/T 1044-2012 Tray Shelf
WB/T 1045-2012 Drive-in Shelf
3 Terms and Definitions
The terms and definitions defined in WB/T 1042, JB/T 11270-2011 apply to this document.
4 Installation and Acceptance Process
The installation and acceptance process of the shelf is shown in Figure 1.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of WBT1066-2017_English be delivered?Answer: Upon your order, we will start to translate WBT1066-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of WBT1066-2017_English with my colleagues?Answer: Yes. The purchased PDF of WBT1066-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|