HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

TB/T 2824-2008 English PDF

US$389.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
TB/T 2824-2008: Circular prestressed concrete pole for sub station of electrified railway
Status: Valid

TB/T 2824: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
TB/T 2824-2008English389 Add to Cart 3 days [Need to translate] Circular prestressed concrete pole for sub station of electrified railway Valid TB/T 2824-2008
TB/T 2824-1997English479 Add to Cart 4 days [Need to translate] (Electrified Railway Substation prestressed concrete round bar) Obsolete TB/T 2824-1997

PDF similar to TB/T 2824-2008


Standard similar to TB/T 2824-2008

TB/T 3111   TB/T 2809   TB/T 3159   TB/T 2805   TB/T 3517   

Basic data

Standard ID TB/T 2824-2008 (TB/T2824-2008)
Description (Translated English) Circular prestressed concrete pole for sub station of electrified railway
Sector / Industry Railway & Train Industry Standard (Recommended)
Classification of Chinese Standard S81;S82
Classification of International Standard 29.280
Word Count Estimation 15,154
Date of Issue 2008-01-25
Date of Implementation 2008-01-25
Older Standard (superseded by this standard) TB/T 2824-1997
Quoted Standard GB 175; GB/T 700-2006; GB/T 701; GB 748; GB 1499; GB/T 1596; GB/T 4623-2006; GB/T 5223; GB 8076; GB 13013; GB/T 14684; GB/T 14685; GB/T 18046; GB 50081-2002; GB 50204-2002; GB 50205-2001; GBJ 82; GBJ 107; JGJ 63; TB/T 3054-2002; YB/T 5294-2006
Regulation (derived from) Industry standard filing Notice 2010 No. 8 (No. 128 overall)
Issuing agency(ies) Ministry of Railways of the People's Republic of China
Summary This standard specifies the electrified railway substation prestressed concrete rod product classification, technical requirements, test methods, inspection rules, signs and factory certificate, custody and transportation. This standard applies to electric railway substation with prestressed concrete rod (hereinafter referred to as round rod), of urban rail transit using similar substation rod may refer to this standard.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of TB/T 2824-2008_English be delivered?

Answer: Upon your order, we will start to translate TB/T 2824-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of TB/T 2824-2008_English with my colleagues?

Answer: Yes. The purchased PDF of TB/T 2824-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version TB/T 2824-2008?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version TB/T 2824-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.