HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

SN/T 4651.6-2017 English PDF

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
SN/T 4651.6-2017English239 Add to Cart 2 days [Need to translate] IT service management specification of inspection and quarantine--Part 6: Release management Obsolete SN/T 4651.6-2017

PDF similar to SN/T 4651.6-2017


Standard similar to SN/T 4651.6-2017

GBZ 57   GB/T 31989   SN/T 4652.1   SN/T 4652.2   SN/T 4636   

Basic data

Standard ID SN/T 4651.6-2017 (SN/T4651.6-2017)
Description (Translated English) IT service management specification of inspection and quarantine--Part 6: Release management
Sector / Industry Commodity Inspection Standard (Recommended)
Classification of Chinese Standard C62
Word Count Estimation 6,673
Date of Issue 2017-08-29
Date of Implementation 2018-04-01
Regulation (derived from) National Quality Inspection (2017) 384
Issuing agency(ies) General Administration of Customs

SN/T 4651.6-2017: IT service management specification of inspection and quarantine--Part 6: Release management


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Inspection and Quarantine IT Service Management Specification Part 6. Release Management) People's Republic of China Entry-Exit Inspection and Quarantine Industry Standard Inspection and Quarantine IT Service Management Specification Part 6. Release management Part 6. Releasemanagement Published on.2017-08-29 2018-04-01 implementation People's Republic The General Administration of Quality Supervision, Inspection and Quarantine issued Entry and exit inspection and quarantine Industry Standard Inspection and Quarantine IT Service Management Specification Part 6. Release Management China Standard Press Publishing First edition in March.2018

Foreword

SN/T 4651 "Inspection and Quarantine IT Service Management Specification" is divided into the following seven parts. --- Part 1. General; --- Part 2. Problem Management; --- Part 3. Event Management; --- Part 4. Configuration Management; --- Part 5. Change Management; --- Part 6. Release Management; --- Part 7. Knowledge Management. This part is the sixth part of SN/T 4651. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part is proposed and managed by the National Certification and Accreditation Administration. This section is mainly drafted by. Information Center of the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Zhejiang Province Entry-Exit Inspection and Quarantine Bureau, Liaoning Entry-Exit Inspection and Quarantine Bureau of the People's Republic of China, Jiangsu Entry-Exit Inspection and Quarantine Bureau, Beijing Xinchengtong Digital Technology Co., Ltd. and Jiangxi Provincial Quality and Technical Supervision Bureau of the People's Republic of China. The main drafters of this section. Wei Yingxi, Li Jing, Song Yi, Ou Baozhu, Qi Yiying, Wang Xinqiang, Fa Yong, Yan Shasha, Zhou Yang, Chen Meihan, Yan Wu. Inspection and Quarantine IT Service Management Specification Part 6. Release Management

1 Scope

This part of SN/T 4651 specifies the overall requirements, process requirements, personnel requirements, and requirements for the release management of IT services management in inspection and quarantine. Specific requirements for implementation requirements, work log requirements, and release interfaces. This section applies to the guidance and evaluation of IT service management in inspection and quarantine institutions.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 24405.1 Information technology service management - Part 1. Specification

3 Terms and definitions

The terms and definitions defined in GB/T 24405.1 apply to this document. For ease of use, the following is a list of GB/T 24405.1 Some terms and definitions in . 3.1 Service management servicemanagement Management of services to meet business needs. [GB/T 24405.1-2009, definition 2.14] 3.2 Service level agreement servicelevelagreement; SLA An agreement between the service provider and the customer that describes the service and agreed service levels. [GB/T 24405.1-2009, definition 2.13] 3.3 Release release A collection of new configuration items and/or changed configuration items that have been tested and introduced into the actual operating environment. [GB/T 24405.1-2009, definition 2.10]

4 General requirements

The overall requirements for release management are as follows. a) The release management process should be developed in conjunction with the inspection and quarantine operation and maintenance requirements, and continuous improvement; b) should include the design of the release package, the formation of the release package, the test of the release package, the organization of the user training, the business preparation of the release, and the actual Post-deployment verification testing and update of IT resource configuration status; c) The contents of the release items included in the distribution package should be authorized and tested, and the hardware and software for making changes to them are traceable; d) Ensure that the historical version of all software is saved in the final software repository and that configuration data is configured through configuration management