|
US$489.00 ยท In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. SN/T 3023.2-2021: (Import and Export Commodity Weight Appraisal Regulations - Part 2: Water Gauge Weight Measurement) Status: Valid SN/T 3023.2: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| SN/T 3023.2-2021 | English | 489 |
Add to Cart
|
5 days [Need to translate]
|
(Import and Export Commodity Weight Appraisal Regulations - Part 2: Water Gauge Weight Measurement)
| Valid |
SN/T 3023.2-2021
|
| SN/T 3023.2-2012 | English | 759 |
Add to Cart
|
5 days [Need to translate]
|
Rules for the weight survey. Part 2: Draft survey on import and export commodities
| Obsolete |
SN/T 3023.2-2012
|
PDF similar to SN/T 3023.2-2021
Basic data | Standard ID | SN/T 3023.2-2021 (SN/T3023.2-2021) | | Description (Translated English) | (Import and Export Commodity Weight Appraisal Regulations - Part 2: Water Gauge Weight Measurement) | | Sector / Industry | Commodity Inspection Standard (Recommended) | | Classification of Chinese Standard | A50 | | Word Count Estimation | 21,272 | | Issuing agency(ies) | General Administration of Customs |
SN/T 3023.2-2012: Rules for the weight survey. Part 2: Draft survey on import and export commodities ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Rules for the weight survey.Part 2. Draft survey on import and export commodities
People's Republic of China Entry-Exit Inspection and Quarantine Standards
Instead of the SN/T 0187-1993
Weight authentication procedures Import and Export
Part 2. Draft Survey
Part 2. Draftsurveyonimportandexportcommodities
Issued on. 2012-12-12
2013-07-01 implementation
People's Republic of China
The State Administration of Quality Supervision, Inspection and Quarantine released
Foreword
SN/T 3023 "Importers weight authentication procedures commodity" is divided into two parts.
--- Part 1. General Cabin static weight;
--- Part 2. Draft Survey.
This section SN/T 3023 Part 2.
This section drafted in accordance with GB/T 1.1-2009 given rules.
The partial replacement of SN/T 0187-1993 "Import and Export Commodity weight authentication procedures Draft Survey."
This section compared with the SN/T 0187-1993, the main technical changes are as follows.
--- An increase of some terms and definitions related to the Draft Survey;
--- Increased Draft Survey basic requirements of content;
--- The original formula was appropriate increase or decrease.
This part by the National Certification and Accreditation Administration Committee under the jurisdiction and approval.
This section was drafted by. People's Republic of China Liaoning Province Exit Inspection and Quarantine.
The main drafters of this section. Yin Wenzhong, Tang Hongbing, OF CRITICAL Lilian Jun, Xiao-Feng Song, Bichong Bo.
Weight authentication procedures Import and Export
Part 2. Draft Survey
1 Scope
SN/T 3023 provisions of this part of the Draft Survey requirements, procedures and methods.
This section applies to ships carrying weight identification bulk import and export of goods.
2 Terms and definitions
The following terms and definitions apply to this document.
2.1
Draft Survey draftsurvey
Based on "Archimedes' principle", and carrying ship loading or unloading before and after the draft observations, and based on accurate chart of the ship, by
Necessary correction in lookup ship displacement, combined with ship ballast water, fresh water, fuel oil, marine materials and weight calculation of non-cargo, determining means
One kind of load or unload cargo weight weight method.
2.2
Water gauge draft, draught
In the bottom of the ship to the keel line edge zero bottom-symmetrically marked on the bow, stern, amidships on both sides, a digital representation of the ship draft
The mark, which is the water line to the lower edge of the keel of the ship vertical distance.
2.3
Displacement displacement
The weight of the carrying vessel water discharge. The water volume of the product of its density which is numerically equal to the ship row.
2.4
Deadweight deadweight
Load refers to cargo and the ship is fully loaded weight of the non-goods, that summer load line of the ship's displacement (usually the standard water density
1.025 calculated) light ship displacement after deducting the weight of.
2.5
Forward perpendicular foreperpendicular
Vertical intersection made in the ship longitudinal central sectional view through the summer load line with ships heading column in the leading edge of a summer load line straight.
2.6
After perpendicular aftperpendicular
On the ship longitudinal central sectional view through the summer load line with the intersection after the ship stern edge vertically to the summer load line straight.
Note. Under normal circumstances, the centerline of the rudder for stern perpendicular.
2.7
Length between perpendiculars LBP lengthbetweenperpendiculars
Ship longitudinally through the summer load line located in the bow, stern horizontal distance between the vertical line.
2.8
Overall Length LOA lengthoveral
Ship longitudinal bow, stern maximum horizontal distance between the two endpoints.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of SN/T 3023.2-2021_English be delivered?Answer: Upon your order, we will start to translate SN/T 3023.2-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of SN/T 3023.2-2021_English with my colleagues?Answer: Yes. The purchased PDF of SN/T 3023.2-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version SN/T 3023.2-2021?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version SN/T 3023.2-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|