Rules for the inspection of power generating equipments for export. Part 3: Micro hydro generator equipments(12 kW and below)
| Obsolete |
SN/T 1621.3-2013
|
PDF similar to SN/T 1621.3-2013
Standard similar to SN/T 1621.3-2013 GB/T 2820.9 GB/T 2820.7 GB/T 2820.1
Basic data | Standard ID | SN/T 1621.3-2013 (SN/T1621.3-2013) | | Description (Translated English) | Rules for the inspection of power generating equipments for export. Part 3: Micro hydro generator equipments(12 kW and below) | | Sector / Industry | Commodity Inspection Standard (Recommended) | | Classification of Chinese Standard | K52 | | Word Count Estimation | 8,874 | | Older Standard (superseded by this standard) | SN/T 0298-1993 | | Quoted Standard | GB/T 2828.1; GB 12350; GB 14711; GB/T 17522-2006; GB/T 17523; GB/T 17524 | | Regulation (derived from) | National quality recognition (2013) 569 | | Issuing agency(ies) | General Administration of Customs | | Summary | This standard specifies the sampling, testing and results export miniature (12kW and below) hydroelectric power equipment determination. This section applies to the output power of 12kw and below, from the turbine, generator, controller (non-mechanical sp |
SN/T 1621.3-2013: Rules for the inspection of power generating equipments for export. Part 3: Micro hydro generator equipments(12 kW and below) ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Rules for the inspection of power generating equipments for export.Part 3. Micro hydro generator equipments (12 kW and below)
People's Republic of China Entry-Exit Inspection and Quarantine Standards
Instead of the SN/T 0298-1993
Export inspection of power generation equipment - Part 3. Miniature
(12kW and below) hydroelectric power equipment
Part 3. Microhydrogeneratorequipments (12kWandbelow)
Issued on. 2013-11-06
2014-06-01 implementation
People's Republic of China
The State Administration of Quality Supervision, Inspection and Quarantine released
Foreword
SN/T 1621 "export of power generation equipment for the inspection," is divided into three parts.
--- Part 1. General requirements;
--- Part 2. Reciprocating internal combustion engine driven alternator group;
--- Part 3. Micro (12kW and below) hydroelectric power equipment.
This section SN/T 1621 Part 3.
This section drafted in accordance with GB/T 1.1-2009 given rules.
The partial replacement of SN/T 0298-1993 "mini-export (12kW and below) hydroelectric power equipment inspection procedures", and SN/T 0298-
Compared to 1993, the main technical changes as follows.
--- Standard structure, format and layout of the chapters, according to GB/T 1.1-2009 been modified;
--- Modify the normative references;
--- Modify the terms and definitions, increasing the sampling mode, compliance verification mode, type test mode, substandard classification;
--- Modify substandard classification and sampling plan failed Sort by A, B, C, D four categories adjusted to A, B, C categories;
--- Inspection and supervision mode increases compliance verification and type testing mode, and provides for specific content and requirements;
--- Modify the test items, the packaging inspection, visual inspection, safety checks, the main components of the performance check, check electrical performance tune
Rounded to the whole appearance, electrical safety, machine, mechanical safety, data and information, packaging, to distinguish between the sampling and testing out of the box
s project;
--- Increased qualified batch expiration date.
Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents.
This section proposed and managed by the National Certification and Accreditation Administration Committee.
This section was drafted by. People's Republic of China Jiangsu Entry-Exit Inspection and Quarantine Bureau.
The main drafters of this section. Marcus Chin, Zhang Hui, Xue Jiao A Trial, Xu Min, Zhang Xinliang.
This part of the standard replaces the previous editions are.
--- SN/T 0298-1993.
Export inspection of power generation equipment - Part 3. Miniature
(12kW and below) hydroelectric power equipment
1 Scope
This section SN/T 1621 specifies the sample outlet miniature (12kW and below) hydroelectric power equipment and test results to determine.
This section applies to the output power of 12kW and below by the turbine, generator, AC controller (non-mechanical speed type) consisting of miniature
Export inspection hydroelectric equipment, mechanical speed controller type can be implemented by reference.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2828.1 Sampling procedures for inspection Part I. batch inspection sampling plan by acceptance quality limit (AQL) retrieval
GB 12350 Safety requirements of small power motors
GB 14711 Safety requirements of small and medium rotary motor
GB/T 17522-2006 micro-hydro equipment basic technical requirements
GB/T 17523 Test methods for micro-hydro equipment
GB/T 17524 Quality inspection of micro-hydro equipment
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Sampling mode modeofsamplinginspection
According to the mandatory requirements of national technical specifications, import and export commodities random inspection lot or batch embodiment qualified sampling, testing and inspection
Assessment activities.
3.2
Compliance Verification mode modeofcomplianceverification
According to the mandatory requirements of national technical specifications, inspection certificate and inspection documents, goods are consistent with the random testing can be carried out when necessary, and real
Shi conformity assessment activities supervision.
3.3
Type Test mode modeoftypetest
According to a predetermined cycle based on the mandatory requirements of national technical specifications type testing, according to on-site inspection requirements for product pumping batch inspection
Inspection, supervision and implementation of the conformity assessment activities of the enterprise quality management system.
3.4
Inspection Lot inspectionlot
To carry out the inspection and collection of the same manufacturer, same specifications, models, under the same conditions of production per unit of product produced, called test
Batch, referred batch.
|