HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

SH/T 3098-2011 English PDF

US$1719.00 ยท In stock
Delivery: <= 10 days. True-PDF full-copy in English will be manually translated and delivered via email.
SH/T 3098-2011: Specification for design of column in petrochemical engineering
Status: Valid

SH/T 3098: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
SH/T 3098-2011English1719 Add to Cart 10 days [Need to translate] Specification for design of column in petrochemical engineering Valid SH/T 3098-2011
SH 3098-2000EnglishRFQ ASK 14 days [Need to translate] Specification for the design of petrochemical column Obsolete SH 3098-2000

PDF similar to SH/T 3098-2011


Standard similar to SH/T 3098-2011

SH/T 3164   SAMR 43   HG/T 20513   SH/T 3106   SH/T 3103   SH/T 3105   

Basic data

Standard ID SH/T 3098-2011 (SH/T3098-2011)
Description (Translated English) Specification for design of column in petrochemical engineering
Sector / Industry Petrochemical Industry Standard (Recommended)
Classification of Chinese Standard P72
Classification of International Standard 75.180
Word Count Estimation 70,715
Date of Issue 2011-05-18
Date of Implementation 2011-06-01
Older Standard (superseded by this standard) SH 3098-2000
Quoted Standard GB 150; GB 713-2008; GB 3531-2008; GB 24511-2009; GB 6479-2000; GB/T 8163-2008; GB/T 8165-2008; GB 50009; GB 50011; GB 50017; GB 50160-2008; HG/T 21512-1995; HG/T 21574; HG/T 21618-1998; HG/T 21639; JB/T 4710; JB 4732; NB/T 47015-2011; NB/T 47018-2011; NB/T 47002.1-2009; SH/T 3074; SH/T 3075; SH/T 3088; SH/T 3096; SH/T 3515; SH/T 3524; SH/T 3525; SH/T 3526; SH/T 3527; TSG R0004; GB 9948-2006; GB/T 14976-2002
Regulation (derived from) Ministry of Industry and Information Technology Bulletin No. 13 of 2011
Issuing agency(ies) Ministry of Industry and Information Technology
Summary This standard specifies the petrochemical steel tower vessel (hereinafter referred to as towers) the selection, design, and design for manufacturing, testing and acceptance requirements. This standard applies to the design pressure of not more than 35MPa, height greater than 10m, and height to diameter ratio greater than 5 skirt self-supporting tower design. This specification does not apply to tower design: (a) with pull-pull device tower, (b) non-metallic lining tower, (c) by the operating platform into one row of towers and towers, (d) jacketed tower.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of SH/T 3098-2011_English be delivered?

Answer: Upon your order, we will start to translate SH/T 3098-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 10 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of SH/T 3098-2011_English with my colleagues?

Answer: Yes. The purchased PDF of SH/T 3098-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version SH/T 3098-2011?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version SH/T 3098-2011 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.