Standard Briefing:Stadard ID: SB/T 10996-2013 Stadard Title: Silk. Manufacturing management practice for reeling mill Price (USD): 239 Lead day (Deliver True-PDF English version): 3 days [Need to translate] Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
SB/T 10996-2013 | English | 239 |
Add to Cart
|
3 days [Need to translate]
|
Silk. Manufacturing management practice for reeling mill
| Valid |
SB/T 10996-2013
|
PDF Samples:
Basic Data: Standard ID | SB/T 10996-2013 (SB/T10996-2013) | Description (Translated English) | Silk. Manufacturing management practice for reeling mill | Sector / Industry | Domestic Trade Industry Standard (Recommended) | Classification of Chinese Standard | W02 | Classification of International Standard | 03.100.50 | Word Count Estimation | 9,911 | Quoted Standard | GB/T 1797; GB/T 1798; GB/T 9111; GB/T 9176; GB 12348; GB 13271; GB 18599; GB/T 26380; GB 28936; GB 50425; GB 50477; CSC 9000-T | Issuing agency(ies) | People's Republic of China Ministry of Commerce | Summary | This standard specifies the terms and definitions reeling enterprises, production layout, production of basic conditions, production management, quality management and after-sales service, overall energy consumption, environmental protection and comprehen |
Contents, Scope, and Excerpt:SB/T 10996-2013
Silk.Manufacturing management practice for reeling mill
ICS 03.100.50
W02
Record number. 40323-2013
People's Republic of China domestic trade industry standard
Silk silk reel enterprise production management norms
Released on.2013-04-16
2013-11-01 implementation
Published by the Ministry of Commerce
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed and managed by the Ministry of Commerce of the People's Republic of China.
This standard is mainly drafted by. China Silk Association, Zhejiang Kaixiya International Co., Ltd., Zhejiang Silk Technology Co., Ltd., Jiangsu
Xinyuan Silk Group Co., Ltd., Anhui Yuanpai Industry (Group) Co., Ltd.
The main drafters of this standard. Yu Xinger, Qian Youqing, Liu Wenquan, Sun Jinhua, Liu Huaping, Wang Haitao.
Silk silk reel enterprise production management norms
1 Scope
This standard specifies the terms and definitions, production layout, basic production conditions, production management, quality management and after-sales service of silk reeling enterprises.
Comprehensive energy consumption, environmental protection and comprehensive utilization of resources, safety production and social responsibility and supervision and management requirements.
This standard applies to enterprises engaged in the production and operation of silk reel in the People's Republic of China.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 1797 raw silk
GB/T 1798 raw silk test method
GB/T 9111 silkworm cognac test method
GB/T 9176 silkworm cognac
GB 12348 Environmental noise emission standards for industrial enterprises
GB 13271 Boiler Air Pollutant Emission Standard
GB 18599 General industrial solid waste storage and disposal site pollution control standards
GB/T 26380 textile silk terminology
GB 28936 Filament Industry Water Pollutant Emission Standard
GB 50425 Environmental Protection Design Code for Textile Industry Enterprises
GB 50477 Design code for occupational safety and hygiene in textile industry enterprises
CSC9000-T China Textile Enterprise Social Responsibility Management System
3 Terms and definitions
The following terms and definitions as defined in GB/T 26380 apply to this document.
3.1
Silk reeling company reelingmil
The silkworm cocoons are used as raw materials, and the enterprises that produce silk by mixing, peeling, (sieving), selecting, boiling, twisting, reshaping, finishing, and testing are produced.
4 Production layout
4.1 The construction or reconstruction of the reeling project should be in line with the national industrial planning and industrial policies, ecological environment planning and overall land use planning.
Claim.
4.2 In the case of water shortage or poor water quality, no new silk reeling project will be established in principle. Newly reclaimed silk project in a relatively abundant water source, striving for industrial parks
Centralized construction in the district, centralized heating and centralized treatment of pollutants. In the absence of environmental capacity areas, new or rebuilt and expanded projects should be eliminated
In combination with backward production capacity in the region, in situ renovation and expansion projects cannot increase pollutant emissions.
......
|