US$289.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. NB/T 32015-2013: Technical rule for distributed resources connected to distribution network Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
NB/T 32015-2013 | English | 289 |
Add to Cart
|
3 days [Need to translate]
|
Technical rule for distributed resources connected to distribution network
| Valid |
NB/T 32015-2013
|
PDF similar to NB/T 32015-2013
Basic data Standard ID | NB/T 32015-2013 (NB/T32015-2013) | Description (Translated English) | Technical rule for distributed resources connected to distribution network | Sector / Industry | Energy Industry Standard (Recommended) | Classification of Chinese Standard | F12 | Classification of International Standard | 27.160 | Word Count Estimation | 11,112 | Quoted Standard | GB 2894; GB/T 12325; GB/T 12326; GB/T 14285; GB/T 14549; GB/T 15543; GB/T 15945; GB/T 17215.322; GB/T 19862; GB/T 24337; DL/T 448; DL/T 584; DL/T 614; DL/T 634.5101; DL/T 634.5104; DL/T 645 | Regulation (derived from) | National Energy Board Notice 2013 No. 6; industry standard for filing Notice No. 2 of 2014 (No. 170 overall) | Issuing agency(ies) | National Energy Administration | Summary | This standard specifies general principles and technical requirements for access to distributed power grid operation should be followed. This standard applies to 35kV voltage level through access to the power grid construction, reconstruction and expansio |
NB/T 32015-2013: Technical rule for distributed resources connected to distribution network---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical rule for distributed resources connected to distribution network
ICS 27.160
F12
Record number. 43499-2014
Energy Industry Standard of the People 's Republic of China
Technical specification for distributed power supply distribution networks
2013-11-28 release
2014-04-01 implementation
National Energy Board released
1 Scope
This standard specifies the general principles and technical requirements for distributed power supply access to the grid.
This standard applies to 30kV and below the voltage level access to the new grid, alteration and expansion of distributed power supply.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. This is the latest version of the book, including all modifications.
GB 2894 Safety signs and guidelines for their use
3 terms and definitions
The following terms and definitions apply to this document.
3.1
Distributed power
Access 35kV and below the voltage level, located near the user, local consumption-based power, including synchronous generators, asynchronous generators,
Converter and other types.
3.2
Converter
An electrical device for converting electrical power into electrical power for one or more forms suitable for use by a grid or a user. Including rectifiers,
Inverters, AC converters and DC converters.
3.3
Converter type power supply converter-type power supply
All or part of the power supply connected to the grid through the converter.
Synchronous generator type power supply
Asynchronous left motor type power supply
Through the asynchronous generator directly connected to the power grid.
Point of interconnection
For a distributed power supply with a booster station, it refers to the high voltage side bus or node of the booster station. For distributed power supplies without booster stations, refer to distributed
Power output summary point. The definition of the dotted network can be found in Appendix A of this standard.
Public connection point of common coupling
User access to the public grid connection.
Island islanding
Including the load and power of some of the grid, from the main network after the separation from the state to continue to run alone. Isolated islands can be divided into unplanned islands and planned islands.
Note. Unplanned islands are unscheduled and unregulated. Planned islands are planned to occur in a planned control strategy.
4 power quality
4.1 General requirements
4.1.1 The quality of the distributed power supply, in terms of harmonics, voltage deviation, voltage imbalance, voltage fluctuation and flicker, etc.
Related national standards.
4.1.2 through the voltage level of the converter network type of distributed power supply should be installed at the public connection to meet GB/T 19862
Required level A power fil on-line monitoring device, power quality. n. monitoring historical data should be kept for at least one year.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of NB/T 32015-2013_English be delivered?Answer: Upon your order, we will start to translate NB/T 32015-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of NB/T 32015-2013_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 32015-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|