HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

NB/T 20133.3-2012 English PDF

US$209.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
NB/T 20133.3-2012: Specifications for protective coatings used in pressurized water reactor nuclear power plants. Part 3: Standard test method for effects of gamma radiation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
NB/T 20133.3-2012English209 Add to Cart 3 days [Need to translate] Specifications for protective coatings used in pressurized water reactor nuclear power plants. Part 3: Standard test method for effects of gamma radiation Valid NB/T 20133.3-2012

PDF similar to NB/T 20133.3-2012


Standard similar to NB/T 20133.3-2012

NB/T 20015   NB/T 20332   NB/T 20325.1   NB/T 20133.2   NB/T 20133.4   NB/T 20133.1   

Basic data

Standard ID NB/T 20133.3-2012 (NB/T20133.3-2012)
Description (Translated English) Specifications for protective coatings used in pressurized water reactor nuclear power plants. Part 3: Standard test method for effects of gamma radiation
Sector / Industry Energy Industry Standard (Recommended)
Classification of Chinese Standard F63
Classification of International Standard 27.120.20
Word Count Estimation 8,864
Older Standard (superseded by this standard) EJ/T 1111-2000
Quoted Standard GB/T 700; GB/T 1766; GB 8076; GB 8923-1988; GB/T 9271-2008
Regulation (derived from) National Energy Board Notice No. 2 of 2012; industry standard for filing Notice No. 4 of 2012 (No. 148 overall)
Issuing agency(ies) National Energy Administration
Summary This standard specifies the test method for the laboratory to evaluate the influence of the coating system on the normal operation of the plant during the design life of the nuclear power plant and the influence of gamma radiation on the design basis accident. This standard is applicable to the evaluation of the dose rate and the cumulative dose of radiation produced by the coating system for PWR nuclear power plants.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of NB/T 20133.3-2012_English be delivered?

Answer: Upon your order, we will start to translate NB/T 20133.3-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of NB/T 20133.3-2012_English with my colleagues?

Answer: Yes. The purchased PDF of NB/T 20133.3-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.