Technical specification for simultaneous operation of drilling and grouting in vertical shaft
| Valid |
NB/T 11548-2024
|
Basic data | Standard ID | NB/T 11548-2024 (NB/T11548-2024) | | Description (Translated English) | Technical specification for simultaneous operation of drilling and grouting in vertical shaft | | Sector / Industry | Energy Industry Standard (Recommended) | | Classification of Chinese Standard | D01 | | Classification of International Standard | 73.020 | | Word Count Estimation | 17,147 | | Date of Issue | 2024-05-24 | | Date of Implementation | 2024-11-24 | | Issuing agency(ies) | National Energy Administration |
NB/T 11548-2024: Technical specification for simultaneous operation of drilling and grouting in vertical shaft ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 73.020
CCSD01
Energy Industry Standards of the People's Republic of China
Technical specification for parallel drilling and injection operation in vertical shaft
verticalshaft
Released on 2024-05-24
Implementation on November 24, 2024
The National Energy Administration released
Table of contents
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Drilling and injection parallel operation design 2
4.1 Design of time-space relationship between drilling and grouting 2
4.2 Grouting section design 2
4.3 Grouting hole layout 3
4.4 Ground facilities layout 4
4.5 Grouting hole trajectory design 4
4.6 Other grouting designs 4
4.7 Drilling Design 4
5 Drilling and injection parallel operation construction 4
5.1 Drilling operations 4
5.2 Drilling Mud Parameters 4
5.3 Drilling Mud Control 5
5.4 Well logging 5
5.5 Grouting hole construction 5
5.6 Grouting operation 5
5.7 Grouting end criteria 6
5.8 Drilling Mud Monitoring 6
5.9 Grouting drilling trajectory monitoring 7
5.10 Grouting process monitoring 7
6 Drilling Mud Grouting Slurry 7
6.1 Quality requirements for drilling mud for grouting 7
6.2 Drilling Mud Grouting Slurry Ratio 7
6.3 Preparation of drilling mud grouting slurry 7
7 Inspection 8
7.1 Inspection of the overlap section between drilling and grouting 8
7.2 Inspection of the overlap between the S-hole grouting section and the straight hole grouting section 8
7.3 Grouting ring diameter inspection 8
7.4 Grouting quantity inspection 8
7.5 Grouting final pressure test 8
7.6 Final grouting quantity inspection 8
7.7 Grouting effect inspection 8
7.8 Other routine inspections 8
Appendix A (Informative) Schematic diagram of the construction sequence of parallel drilling and injection operations in the vertical shaft 9
Appendix B (Informative) Drilling Mud Parameters Test Table 10
Appendix C (Informative) Grouting hole trajectory parameter calculation results Table 11
Reference 12
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Coal Industry Association.
This document is under the jurisdiction of the Coal Industry Coal Mine Safety Standardization Technical Committee.
This document was drafted by. Huaibei Mining Co., Ltd., Hefei University of Technology, Beijing China Coal Mine Engineering Co., Ltd., China Coal Industry
Industry Association Productivity Promotion Center, Kailuan Construction (Group) Co., Ltd., National Engineering Research Center for Deep Mine Construction Technology, Huaiwu Industry
Cheng Construction Supervision Co., Ltd.
The main drafters of this document are Wei Shengtian, Meng Yiping, Zheng Houfa, Yang Daozhao, Deng Lunzhu, Cao Longfei, Zuo Yongjiang, Liu Shujie and Zhu Jinlong.
Technical specification for parallel drilling and injection operation in vertical shaft
1 Scope
This document specifies the technical specifications for parallel operations of vertical shaft drilling and ground pre-grouting,
Requirements for drilling and injection parallel operation, drilling mud, grouting slurry and inspection, etc.
This document is applicable to mine shafts, and other similar underground engineering shafts can be used as a reference for implementation.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 50511-2022 Coal Mine Shaft and Tunnel Engineering Construction Standard
GB 50213-2010 Code for acceptance of coal mine tunnel engineering quality
GB 51227-2017 Specification for construction and acceptance of vertical shaft drilling method
MT/T 1057 Test method for water pressure test of pre-grouting effect on the ground of vertical shaft
MT/T 1150 Technical specification for grouting hole construction of vertical shaft ground pre-grouting project
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
A method of drilling a vertical shaft using a drilling rig.
[Source. GB/T 15663.2-2023, 7.1, modified]
3.2
Surface pre-grouting
Before the well is dug, a hole is drilled from the ground to the aquifer, and grouting facilities installed on the ground are used to inject slurry into the aquifer.
[Source. GB/T 15663.2-2023, 9.2]
3.3
A method in which drilling construction and ground pre-grouting construction are carried out simultaneously within a certain time and space during vertical shaft construction.
3.4
Drilling mud grouting slurry mudtogrout
During the parallel drilling and injection operation, the grouting slurry is made with drilling mud as the main material.
3.5
Vertical grouting hole
Grouting holes constructed in a straight hole manner before drilling and grouting parallel operations.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of NB/T 11548-2024_English be delivered?Answer: Upon your order, we will start to translate NB/T 11548-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of NB/T 11548-2024_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 11548-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|