HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

NB/T 11429-2023 English PDF

US$399.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
NB/T 11429-2023: Technical specifications for coal mine TBM installation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
NB/T 11429-2023English399 Add to Cart 4 days [Need to translate] Technical specifications for coal mine TBM installation Valid NB/T 11429-2023

PDF similar to NB/T 11429-2023


Standard similar to NB/T 11429-2023

SJ/T 11890   DZ/T 0216   GB/T 2007.4   NB/T 11751   NB/T 11120   NB/T 11430   

Basic data

Standard ID NB/T 11429-2023 (NB/T11429-2023)
Description (Translated English) Technical specifications for coal mine TBM installation
Sector / Industry Energy Industry Standard (Recommended)
Classification of Chinese Standard D01
Classification of International Standard 73.020
Word Count Estimation 18,118
Date of Issue 2023-12-28
Date of Implementation 2024-06-28
Issuing agency(ies) National Energy Administration

NB/T 11429-2023: Technical specifications for coal mine TBM installation

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
NB/T 11429-2023 English version. Technical specifications for coal mine TBM installation ICS 73.020 CCSD01 Energy Industry Standards of the People's Republic of China Technical Specifications for TBM Installation in Coal Mines Released on 2023-12-28 2024-06-28 Implementation The National Energy Administration released

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Ground Installation Site Requirements 2 5 Requirements for underground installation chamber 2 6 Pre-installation preparation 2 7 Lifting equipment requirements 2 8 Assembly Technical Requirements 2 8.1 Mechanical Assembly 2 8.2 Hydraulic assembly 3 8.3 Electrical assembly 3 9 Coal Mine TBM Assembly 4 9.1 Assembly Procedure 4 9.2 Assembly preparation 4 9.3 Coal Mine TBM Mainframe Assembly 4 9.4 Coal Mine TBM Post-Assembly System Assembly 7 10 Equipment Debugging 7 10.1 Coal Mine TBM Commissioning Requirements 7 10.2 Preparations before commissioning 8 10.3 Power supply system commissioning 8 10.4 Hydraulic system debugging 8 10.5 Cooling system commissioning 8 10.6 Lubrication system commissioning 9 10.7 Main drive system commissioning 9 10.8 Debugging of each cylinder's movements 9 10.9 Belt Conveyor System Debugging 9 10.10 Communication and monitoring system debugging 9 10.11 Emergency stop system debugging 9 10.12 Gas Detection System Debugging 9 10.13 Water supply and drainage system commissioning 9 10.14 Guidance System Debugging 9 10.15 Other requirements 10 11 Installation acceptance 10 Reference 11

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Coal Industry Association. This document is under the jurisdiction of the Standardization Expert Group of China Coal Industry Association. This document was drafted by. Shaanxi Zhengtong Coal Industry Co., Ltd., Huaibei Mining Co., Ltd., Shanxi Inspection and Testing Center, Shandong Energy Group Northwest Mining Co., Ltd., Jiangsu Aegis Engineering Machinery Co., Ltd., Shandong Energy Group Co., Ltd., China Coal Industry Association Productivity Promotion Center, China Pingmei Shenma Holding Group Co., Ltd., Anhui University of Science and Technology, and Xi'an University of Science and Technology. The main drafters of this document are. Wang Hongtao, Zhu Lezhang, Li Hongyu, Zhu Youheng, Qin Lixue, Guo Xiaosheng, Zheng Houfa, Song Xiaolin, Zhao Chuanxiang, Zhang Ling, Wang Duochun, Ma Shitao, Ji Liuting, Wang Man, Ren Dengjun, Zhou Changkuan, Li Huitong, Liu Fujun, Han Tairan, Cui Guogang, Chen Xiao, Kong Kai, Yang Zhanbiao, Cui Aixia, and Zhao Anxin. Technical Specifications for TBM Installation in Coal Mines

1 Scope

This document specifies the ground installation site requirements, underground installation chamber requirements, pre-installation preparations, lifting equipment requirements, and other requirements for coal mine TBMs. Requirements, assembly technical requirements, coal mine TBM assembly, equipment commissioning, and installation acceptance. This document applies to the installation, commissioning and acceptance of TBM in coal mines.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. Coal Mine Safety Regulations [Ministry of Emergency Management (2022 Edition)] Standard for the integrity of electromechanical equipment in coal mines [Ministry of Coal Industry of the People's Republic of China (1987 edition)]

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 coal mine TBM coalmine TBM By rotating the cutterhead and pushing it forward, the roller cutter squeezes and crushes the rock, and the entire section of the coal mine tunnel can be excavated and formed at one time, integrating exploration, excavation, support and transportation. A general term for a complete set of equipment. 3.2 Assembly tunnel According to the design requirements, it meets the requirements of TBM assembly and stepping, and is equipped with lifting equipment, ventilation, water supply, gas supply facilities and lighting. Alley. 3.3 Launch tunnel It can accommodate the TBM main machine so that its support shoes can support a section of the tunnel wall. 3.4 Front shield frontshield The front section of the shield of a shield-type coal mine TBM is mainly used to support the main drive. 3.5 Telescopic shield Located between the front shield and the support shield, it consists of two parts, the inner and outer parts, which move relative to each other and can protect the safety of equipment and personnel in the area. Ring housing. [Source. GB/T 41056-2021, 3.10] 3.6 supportshield A shield used to hold the cave wall tight.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of NB/T 11429-2023_English be delivered?

Answer: Upon your order, we will start to translate NB/T 11429-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of NB/T 11429-2023_English with my colleagues?

Answer: Yes. The purchased PDF of NB/T 11429-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.