US$479.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. NB/T 11118.5-2023: EtherNet/IP communication interface and protocol of mechanical and electrical equipment in fully mechanized coal mining face - Part 5: Fluid supply system device profile Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
NB/T 11118.5-2023 | English | 479 |
Add to Cart
|
4 days [Need to translate]
|
EtherNet/IP communication interface and protocol of mechanical and electrical equipment in fully mechanized coal mining face - Part 5: Fluid supply system device profile
| Valid |
NB/T 11118.5-2023
|
PDF similar to NB/T 11118.5-2023
Basic data Standard ID | NB/T 11118.5-2023 (NB/T11118.5-2023) | Description (Translated English) | EtherNet/IP communication interface and protocol of mechanical and electrical equipment in fully mechanized coal mining face - Part 5: Fluid supply system device profile | Sector / Industry | Energy Industry Standard (Recommended) | Classification of Chinese Standard | D90 | Classification of International Standard | 73.100.01 | Word Count Estimation | 23,246 | Date of Issue | 2023-02-06 | Date of Implementation | 2023-08-06 | Issuing agency(ies) | National Energy Administration |
NB/T 11118.5-2023: EtherNet/IP communication interface and protocol of mechanical and electrical equipment in fully mechanized coal mining face - Part 5: Fluid supply system device profile ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 73.100.01
CCSD90
Energy Industry Standards of the People's Republic of China
Coal mine fully mechanized mining face electromechanical equipment EtherNet/IP
Communication interfaces and protocols
Part 5.Liquid supply system equipment data sheet
Published on 2023-02-06
2023-08-06 Implementation
Released by the National Energy Administration
Table of contents
PrefaceⅠ
Introduction II
1 Scope 1
2 Normative reference documents 1
3 Terms and Definitions 1
4 Equipment Profile 2
4.1 Device type number 2
4.2 Device Object Model 2
4.3 Emulsion pump group object example 3
4.4 Spray pump group object instance 3
4.5 Emulsion tank group object example 3
4.6 Water tank group object instance 4
4.7 Filter Station Object Example 4
4.8 Liquid supply system I/O combination object example 4
4.9 Device data format 5
4.10 Device configuration 17
Reference 18
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
This document is Part 5 of NB/T 11118 "EtherNet/IP Communication Interface and Protocol for Mechanical and Electrical Equipment in Coal Mining Faces".
NB/T 11118 has published the following parts.
---Part 1.General provisions;
---Part 2.Extended Object Library;
---Part 3.Coal shearer equipment data sheet;
---Part 4.Hydraulic support equipment data sheet;
---Part 5.Liquid supply system equipment data sheet;
---Part 6.Scraper conveyor, transfer machine and crusher equipment data sheet;
---Part 7.Mobile substation equipment data sheet;
---Part 8.Low-voltage AC vacuum feed switchgear data sheet;
---Part 9.Multi-circuit low-voltage AC vacuum electromagnetic starter equipment data sheet;
---Part 10.Low-voltage AC vacuum electromagnetic starter equipment data sheet;
---Part 11.Lighting signal comprehensive protection device equipment data sheet.
Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents.
This document is proposed by the China Coal Industry Association.
This document is under the jurisdiction of the Standardization Expert Group of China Coal Industry Association.
This document was drafted by. Guoneng Shendong Coal Group Co., Ltd., Beijing Tianma Intelligent Control Technology Co., Ltd., China Coal Engineering
Industry Association Productivity Center.
The main drafters of this document. Li Shoubin, Wu Xiaoxu, Ning Yongan, Feng Xu, Fang Zhongxi, Dong Aiqing, Qu Bo, Wu Xiaohua, Guo Hongwei, He Haitao,
Wang Kai, Jin Xianping, Wang Bo, Zhang Fei, Wu Junqi.
Introduction
NB/T 11118 "EtherNet/IP Communication Interface and Protocol for Mechanical and Electrical Equipment of Coal Mine Fully Mechanized Mining Face" establishes the fully mechanized coal mine working face machine
Technical specifications for electrical equipment using EtherNet/IP Ethernet communication, which can be regarded as a reference to GB/Z 26157 (all parts) "Measurement and Control Digital
Fieldbus type 2 for data communication industrial control systems. Extensions of ControlNet and EtherNet/IP specifications, mainly reflected in. Logarithmic
According to the provisions of the link layer wireless interface, the object library and device profile are expanded, and the data types are expanded. NB/T 11118 by
Composed of eleven parts.
---Part 1.General principles. The purpose is to determine the physical layer and data link of EtherNet/IP communication for electromechanical equipment in fully mechanized coal mining working faces.
The road layer, network layer, transport layer, presentation layer, and application layer stipulate the security requirements and data types of the equipment.
---Part 2.Extending the object library. The purpose is to define an object model library suitable for electromechanical equipment in coal mine fully mechanized mining faces.
---Part 3.Shearer equipment data sheet. The purpose is to determine the equipment object model composition, object interface and access of the shearer
specification.
---Part 4.Hydraulic support equipment data sheet. The purpose is to determine the equipment object model composition, object interface and access of the hydraulic support.
Ask about specifications.
---Part 5.Liquid supply system equipment data sheet. The purpose is to determine the equipment object model composition, object interface and access of the liquid supply system.
Ask about specifications.
---Part 6.Scraper conveyor, transfer machine and crusher equipment data sheet. The purpose is to determine the scraper conveyor and transfer machine and
The equipment object model composition, object interface and access specification of the crusher.
---Part 7.Mobile substation equipment data sheet. The purpose is to determine the equipment object model composition and object interface of the mobile substation.
and access specifications.
---Part 8.Low-voltage AC vacuum feed switchgear data sheet. The purpose is to determine the equipment for low voltage AC vacuum feed switches
Object model composition, object interfaces and access specifications.
---Part 9.Multi-circuit low-voltage AC vacuum electromagnetic starter equipment data sheet. The purpose is to determine the multi-circuit low-voltage AC vacuum
The device object model composition, object interface and access specification of the electromagnetic starter.
---Part 10.Low-voltage AC vacuum electromagnetic starter equipment data sheet. The purpose is to determine the performance of low voltage AC vacuum electromagnetic starter
Device object model composition, object interface and access specification.
---Part 11.Lighting signal comprehensive protection device equipment data sheet. The purpose is to determine the equipment for comprehensive protection devices for lighting signals
Object model composition, object interfaces and access specifications.
Coal mine fully mechanized mining face electromechanical equipment EtherNet/IP
Communication interfaces and protocols
Part 5.Liquid supply system equipment data sheet
1 Scope
This document specifies the liquid supply system equipment data sheet, describing the standard objects and behavior of the equipment.
This document applies to liquid supply system equipment running on an EtherNet/IP network.
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations
For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to
this document.
GB/Z 26157.6 Fieldbus type 2 for measurement and control of digital data communication industrial control systems. ControlNet and
EtherNet/IP Specification Part 6.Object Model
GB/Z 26157.7 Fieldbus type 2 for measurement and control of digital data communication industrial control systems. ControlNet and
EtherNet/IP Specification Part 7.Device Profiles
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
fluidsupplysystem fluidsupplysystem
A system composed of emulsion pump group, spray pump group, emulsion tank group, water tank group, filter station and connecting hose to provide pressure to the working surface.
Complete system for emulsion and water.
3.2
spray pump set spraypump
A device that provides a power source for spray dust extinguishing, consisting of a spray pump, a drive motor, a base frame and other components installed on the same base frame.
3.3
Water box group waterbox
A device for storing spray water consisting of a water tank and components mounted on the water tank.
3.4
filterstation filterstation
It is a device used to filter liquid conveying media, consisting of a cylinder, a filter screen, a sewage discharge part, a transmission device and an electrical control part.
3.5
Variable-frequency drive
A power control device that controls an AC motor by changing the frequency of the motor's operating power supply.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of NB/T 11118.5-2023_English be delivered?Answer: Upon your order, we will start to translate NB/T 11118.5-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of NB/T 11118.5-2023_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 11118.5-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|