Technical guidelines for smart power system in coal mine
| Valid |
NB/T 11115-2023
|
PDF similar to NB/T 11115-2023
Basic data Standard ID | NB/T 11115-2023 (NB/T11115-2023) | Description (Translated English) | Technical guidelines for smart power system in coal mine | Sector / Industry | Energy Industry Standard (Recommended) | Classification of Chinese Standard | F23 | Classification of International Standard | 27.100 | Word Count Estimation | 19,187 | Date of Issue | 2023-02-06 | Date of Implementation | 2023-08-06 | Issuing agency(ies) | National Energy Administration |
NB/T 11115-2023: Technical guidelines for smart power system in coal mine---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 27.100
CCSF23
Energy Industry Standards of the People's Republic of China
Technical Guidelines for Coal Mine Intelligent Power Supply Systems
Published on 2023-02-06
2023-08-06 Implementation
Released by the National Energy Administration
Table of contents
PrefaceⅠ
Introduction II
1 Scope 1
2 Normative reference documents 1
3 Terms and Definitions 2
4 Technical principles 3
5 Architecture 4
6 Functional requirements of power centralized control center 4
7 Main equipment and functional requirements of smart substation 7
8 Communication network equipment and functional requirements 12
Appendix A (informative) Coal mine intelligent power supply system structure diagram 13
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents.
This document is proposed by the China Coal Industry Association.
This document is under the jurisdiction of the Standardization Expert Group of China Coal Industry Association.
This document was drafted by. Guoneng Shendong Coal Group Co., Ltd., China University of Mining and Technology, Jiangsu Guangshi Electric Co., Ltd., China Coal
Carbon Industry Association Productivity Promotion Center, Anbiao National Mining Product Safety Marking Center Co., Ltd., Guoneng Ordos Engineering Design Co., Ltd.
company.
The main drafters of this document. He Haitao, Liu Jianhua, Wang Taiji, Wen Liang, Li Shan, Shan Jie, Xu Nan, Wei Wei, Li Fei, Liu Jian, Zheng Houfa,
Yang Yang, Zhang Yong, Wan Menghe, Yuan Pengsheng.
Introduction
Coal mine intelligent power supply system is an important part of intelligent mine construction. Coal mine intelligent power supply system can improve the reliability of coal mine power supply
It is of great significance to ensure the safety, efficiency and green production of coal mines. In order to standardize the construction of intelligent power supply systems in coal mines, in accordance with the "unified planning, unified
This document is specially formulated based on the principle of "standard and unified construction".
Based on the characteristics of the intelligent power supply system and the actual situation of the coal mine power supply system, this document discusses the technical principles and technical principles of the coal mine intelligent power supply system.
The system structure, substation intelligent equipment and functional requirements, and centralized control center functional requirements were standardized.
This document is a technical guidance document for the construction of intelligent power supply system in coal mines. For actual project implementation, it is based on referring to this document.
On the other hand, relevant design specifications will be formulated separately.
Technical Guidelines for Coal Mine Intelligent Power Supply Systems
1 Scope
This document defines relevant terms and definitions of coal mine intelligent power supply systems, and clarifies the technologies for the construction and transformation of coal mine intelligent power supply systems.
The principles and system structure stipulate the requirements for the equipment functions and system functions of the coal mine intelligent power supply system.
This document is applicable to the intelligent power supply of coal mines composed of surface and underground substations in underground coal mines with voltage levels of 110kV and below.
system.
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations
For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to
this document.
GB/T 2900.50 Electrical Terminology General Terminology for Power Generation, Transmission and Distribution
GB/T 2900.57 Electrical terminology for power generation, transmission and distribution operations
GB/T 14285 Technical regulations for relay protection and safety automatic devices
GB/T 19862 General requirements for power quality monitoring equipment
GB/T 25931 Precision clock synchronization protocol for network measurement and control systems
GB/T 30155 Technical Guidelines for Intelligent Substations
GB/T 34121 Technical specifications for relay protection configuration tools for smart substations
GB/T 37546 Technical specifications for unattended substation monitoring system
GB/T 40435 Technical specifications for substation data communication gateways
GB/T 40773 Technical Specifications for Substation Auxiliary Facilities Monitoring System
GB 50070 Mine Power Design Standard
DL/T 283.1 Power video surveillance system and interface Part 1.Technical requirements
DL/T 478 General technical conditions for relay protection and safety automatic devices
DL/T 553 General technical conditions for power system dynamic recording devices
DL/T 860 (all parts) Substation communication networks and systems
DL/T 1100 Time synchronization system for power systems
DL/T 1230 Power system graphical description specification
DL/T 1403 Technical Specifications for Intelligent Substation Monitoring System
DL/T 1404 Technical Specification for Preventing Electrical Misoperation of Substation Monitoring System
DL/T 1708 Technical specifications for power system sequence control
DL/T 5044 Technical regulations for design of DC power supply system for power engineering
DL/T 5491 Technical regulations for design of AC uninterruptible power supply system for electric power engineering
MT/T 570 Special graphic symbols for coal mine electrical diagrams
MT/T 1007 Mining Information Transmission Interface
MT/T 1081 Mining Network Switch
MT/T 1114 General technical conditions for coal mine power supply monitoring system
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of NB/T 11115-2023_English be delivered?Answer: Upon your order, we will start to translate NB/T 11115-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of NB/T 11115-2023_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 11115-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|