HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

NB/T 10728-2021 English PDF

US$269.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
NB/T 10728-2021: Technical specification for paste filling roadway retaining in coal mine
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
NB/T 10728-2021English269 Add to Cart 3 days [Need to translate] Technical specification for paste filling roadway retaining in coal mine Valid NB/T 10728-2021

PDF similar to NB/T 10728-2021


Standard similar to NB/T 10728-2021

YS/T 514.1   MT/T 1091   NB/T 51022   

Basic data

Standard ID NB/T 10728-2021 (NB/T10728-2021)
Description (Translated English) Technical specification for paste filling roadway retaining in coal mine
Sector / Industry Energy Industry Standard (Recommended)
Classification of Chinese Standard D18
Word Count Estimation 11,125
Issuing agency(ies) National Energy Administration

NB/T 10728-2021: Technical specification for paste filling roadway retaining in coal mine

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for paste filling roadway retaining in coal mine ICS 73.020 CCSD15 People's Republic of China Energy Industry Standard Technical specification for mining of coal mine paste filling entry retaining Published on 2021-11-16 2022-02-16 Implementation Released by the National Energy Administration directory Preface I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Technical requirements 1 5 Process flow 3 6 Main process control and safety technical requirements 4 7 Evaluation of filling mining effect 5

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed and managed by the Science and Technology Development Department of China Coal Industry Association. This document is drafted by. Shandong Kangge Energy Technology Co., Ltd., China University of Mining and Technology, Zibo Mining Group Co., Ltd. The main drafters of this document. Sun Xikui, Chang Qingliang, Cao Zhong, Zhao Qingmin, Sun Gang, Li Xiushan, Shi Xianyuan, Li Min, Guo Shougang, Chang Xiandong, Xuan Zhaojun, Xu Chunhua, Su Yanbing, Wu Dongliang. Technical specification for mining of coal mine paste filling entry retaining

1 Scope

This document specifies the technical requirements, technological process, main process control and safety technical requirements for the mining technology of coal mine paste filling and retaining. Filling mining effect evaluation, etc. This document is applicable to the mining of coal mine paste backfill entry retaining.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. GB/T 35056-2018 Technical Specification for Bolting Support of Coal Mine Roadway NB/T 51070-2017 Coal mine paste filling material test method NB/T 51071-2017 Monitoring technology and method of coal mine paste backfill

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 pastefillingmaterial Materials such as coal gangue, fly ash, slag, harmless construction waste, aeolian sand, river sand, loess, tailings and other materials that will be broken during paste filling mining It is mixed with cementitious material and water (may contain additives or admixtures) in appropriate proportion, and filled into the goaf after uniform stirring without causing the downhole environment. Contaminated composites. 3.2 enrichmentrate The ratio of the volume of the backfill to the volume of the goaf, or the ratio of the average height of the backfill to the average mining height of the coal seam. 3.3 Initial slump initialslump The slump value of the prepared paste was measured immediately. 3.4 Initial settingtime initialsettingtime Refers to the time for the paste filling material to be stirred with water until it loses its fluidity. 3.5 paste-filingbody The solidified body of the paste filling material left in the gob.

4 Technical requirements

4.1 Requirements for roadway support The support of the roadway to be protected should be in good condition, with no gangway or empty roof, and the support should meet the requirements of GB/T 35056-2018.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of NB/T 10728-2021_English be delivered?

Answer: Upon your order, we will start to translate NB/T 10728-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of NB/T 10728-2021_English with my colleagues?

Answer: Yes. The purchased PDF of NB/T 10728-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.