HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

JJG 569-2014 English PDF

US$439.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
JJG 569-2014: Verification Regulation of Electricity Meters with Maximum Demand Measurement Functions
Status: Valid

JJG 569: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
JJG 569-2014English439 Add to Cart 4 days [Need to translate] Verification Regulation of Electricity Meters with Maximum Demand Measurement Functions Valid JJG 569-2014
JJG 569-1988English239 Add to Cart 2 days [Need to translate] Verification Regulation of Alternating-Current Watt-Hour Meters with Maximum Demand Indicator Obsolete JJG 569-1988

PDF similar to JJG 569-2014


Standard similar to JJG 569-2014

JJF 1234   JJG 229   JJG 376   JJG 892   JJG 963   JJG 843   

Basic data

Standard ID JJG 569-2014 (JJG569-2014)
Description (Translated English) Verification Regulation of Electricity Meters with Maximum Demand Measurement Functions
Sector / Industry Metrology & Measurement Industry Standard
Classification of Chinese Standard A55
Classification of International Standard 17.220
Word Count Estimation 19,195
Date of Issue 8/1/2014
Date of Implementation 2/1/2015
Older Standard (superseded by this standard) JJG 569-1988
Quoted Standard JJG 596-2012; JJG 597-2005; GB/T 17215.352-2009
Regulation (derived from) AQSIQ Notice 2014 No. 89
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine
Summary This Standard applies to the reference frequency of 50Hz or 60Hz three-phase electronic energy meter maximum demand (for an abbreviated scale) initial verification and subsequent verification. For multifunction meter with a measurement of maximum demand f

JJG 569-2014: Verification Regulation of Electricity Meters with Maximum Demand Measurement Functions


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Verification Regulation of Electricity Meters with Maximum Demand Measurement Functions State verification procedures People's Republic of China Maximum demand meter Issued on. 2014-08-01 2015-02-01 implementation The State Administration of Quality Supervision, Inspection and Quarantine released Maximum demand meter testing procedures Replacing JJG 569-1988 Focal point. the National Technical Committee on Electromagnetic measurement Main drafting unit. Henan Institute of Metrology Zhengzhou three-hui Electric Co., Ltd. Participated in the drafting unit. Heilongjiang Electric Dragon Electric Co. The measurement procedure commissioned the National Technical Committee is responsible for interpreting electromagnetic The main drafters of this procedure. ROCKETS (Henan Institute of Metrology) Liu Pei (Henan Institute of Metrology) In Wenbiao (Zhengzhou three-hui Electric Co., Ltd.) Drafters participate. Chang Myon (Henan Institute of Metrology) Evergreen (Heilongjiang Dragon Power Electric Co., Ltd.)

table of Contents

Introduction (Ⅱ) 1 Scope (1) 2. References (1) 3 Overview (1) 4 metering performance requirements (1) 4.1 basic error (1) 4.2 creep (1) 4.3 Start (2) Constant of 4.4 (2) 4.5 output (2) 4.6 Display (2) 4.7 day clock timing error (2) 4.8 clock indication error (2) 4.9 Demand indication error (2) 5 General Requirements (2) Flag 5.1 (2) 5.2 AC voltage test (3) 6 Control of measuring instruments (3) 6.1 initial verification, subsequent verification (3) 6.2 test conditions (3) 6.3 Verification Project (4) 6.4 Verification Methods (4) Processing 6.5 Verification Results (6) 6.6 test cycle (6) Appendix A maximum demand meter calibration reference the original record format (7) Appendix B test certificates/test results in the notice page format (p. 2) (10) C calibration certificate/test results test results page notice Shape appendix (3) (11)

Introduction

This procedure based on JJF1002-2010 "national verification procedures write rules" establishment. This procedure reference GB/T 17215.301-2007 "multifunction energy meter special requirements", GB/T 17215.211- 2006 "AC measuring equipment General requirements, tests and test conditions Part 11. Measuring Device", JJF1245.6-2010 "installation of energy type evaluation outlining the special requirements meter functional class" and JJG 780-1992 "Digital AC Power Meter" and other technical specifications, for JJG 569-1988 "maximum demand meter (Meter) Trial test procedures "have been revised. Compared with JJG 569-1988, in addition to editorial changes to the Main Technical changes are as follows. --- Scope changes, for three-phase electronic energy meter maximum demand, the maximum does not apply to electromechanical Demand Meter; --- Basic error, creep, start, constant, AC voltage tests according JJG 596-2012 execution; --- Increased day clock timing error, the clock indication error test project, canceled the demand cycle test project; --- Increased demand indication error requirements. The previous versions of the release JJG 569 case. JJG 569-1988 "maximum demand meter (meter) Trial test procedures" Maximum demand meter testing procedures

1 Scope

The order applies to the reference frequency of 50Hz or 60Hz three-phase electronic energy meter maximum demand (referred Demand Table) initial verification and subsequent verification. For multifunction meter with a measurement of maximum demand function, the same verification procedure of the project implementation. This procedure does not apply to on-site inspection and the need to scale electromechanical scale required verification. 2. References This procedure references the following documents. JJG 596-2012 electronic AC power meter JJG 597-2005 AC power meter testing equipment GB/T 17215.352-2009 AC measuring equipment - Specific requirements - Part 52. Symbols For dated references, only the dated edition applies to this procedure; undated reference documents Member, the latest edition (including any amendments) applies to this procedure.

3 Overview

Demand is an average of a predetermined time interval in the power, which is the expression of formula (1). P = T0∫ T0 p (t) dt (1) Where. p --- instantaneous power, kW; T0 --- billing cycle, min; Average active power P --- T0 time, that demand, kW. Scale required by the energy measurement unit and data processing unit, etc., can simultaneously measure the three-phase active energy and maximum demand the amount. Maximum demand refers to demand the maximum period or the recorded billing period prescribed. Scale works need to issue at the beginning or end of each billing cycle by the time base circuit set billing cycle A control signal to obtain a set billing cycle current demand, the demand and maximum demand values recorded in the memory phase Compare, if more than the memory of maximum demand, to replace the memory of the original data, complete the maximum demand recorded.

4 metering performance requirements

4.1 basic error Scale should meet the needs JJG 596-2012 4.1 requirements. 4.2 Creeping Need to comply with the requirements JJG 596-2012 scale of 4.2.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of JJG 569-2014_English be delivered?

Answer: Upon your order, we will start to translate JJG 569-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of JJG 569-2014_English with my colleagues?

Answer: Yes. The purchased PDF of JJG 569-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version JJG 569-2014?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJG 569-2014 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.