HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

JJG 314-2010 English PDF

US$489.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
JJG 314-2010: Verification Regulation of Instrument Voltage Transformers
Status: Valid

JJG 314: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
JJG 314-2010English489 Add to Cart 4 days [Need to translate] Verification Regulation of Instrument Voltage Transformers Valid JJG 314-2010
JJG 314-1994English839 Add to Cart 6 days [Need to translate] Verification Regulation of Voltage Transformers of Measuring Service Obsolete JJG 314-1994
JJG 314-1983EnglishRFQ ASK 3 days [Need to translate] (Chinese Industry Standard) Obsolete JJG 314-1983

PDF similar to JJG 314-2010


Standard similar to JJG 314-2010

JJF 1234   JJG 229   JJG 376   JJG 892   JJG 843   JJG 313   

Basic data

Standard ID JJG 314-2010 (JJG314-2010)
Description (Translated English) Verification Regulation of Instrument Voltage Transformers
Sector / Industry Metrology & Measurement Industry Standard
Classification of Chinese Standard A55
Classification of International Standard 17.220
Word Count Estimation 21,283
Date of Issue 2010-11-05
Date of Implementation 2011-05-05
Older Standard (superseded by this standard) JJG 314-1994
Quoted Standard JB/T 5473-1991; GB/T 16927.1-1997
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine
Summary This standard applies to rated frequency 50HZ (or 60HZ) of 0. 001 ~ 0. 5 for measuring voltage transformer initial verification, testing and use of follow-up inspection.

JJG 314-2010: Verification Regulation of Instrument Voltage Transformers

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Verification Regulation of Instrument Voltage Transformers State verification procedures People's Republic of China Measuring voltage transformer Issued on. 2010-11-05 2011-05-05 implementation The State Administration of Quality Supervision, Inspection and Quarantine released Measuring voltage transformer test procedures Voltag eTransformers Replacing JJG 314-1994 The regulations by the State Administration of Quality Supervision, Inspection and Quarantine approved on November 5, 2010, and from From May 5, 2011 implemented. Focal point. the National Technical Committee on Electromagnetic measurement The main drafting units. the national high voltage metering station Participated in the drafting. Guangdong Electric Power Research Institute Jiangsu Provincial Power Company Henan Institute of Metrology Hunan Electric Power Test & Research Institute The measurement procedure commissioned the National Technical Committee is responsible for interpreting electromagnetic The main drafters of this procedure. Wang Qin (the national high voltage metering station) Man Ray (the national high voltage metering station) Wangle Ren (the national high voltage metering station) Drafters participate. Zhou Shangli (Guangdong Electric Power Research Institute) Huang Qifeng (Jiangsu Provincial Power Company) STAFF time (Henan Institute of Metrology) Zhou Weihua (Hunan Electric Power Test & Research Institute)

table of Contents

1 Scope (1) 2. Referenced Documents (1) 3 metering performance requirements (1) 3.1 basic error (1) Lift variation 3.2 (2) 3.3 Stability (2) 4 General Requirements (2) 4.1 Appearance (2) 4.2 insulation (2) 5 control of measuring instruments (2) 5.1 verification Conditions (2) 5.2 Verification Project (3) 5.3 Verification Methods (4) 5.4 Verification Results Processing (9) 5.5 test cycle (10) Appendix A test record format (11) Appendix B test certificate page format (13) Appendix C test results in the notice page format (15) Measuring voltage transformer test procedures

1 Scope

Measuring 0.001 ~ 0.5 of this Regulation applies to the rated frequency of 50Hz (or 60Hz) with a voltage mutual Sensor (hereinafter referred to as voltage transformer) the initial verification, subsequent verification and in-service inspection.

2 Citations

The regulations cited the following criteria. JB/T 5473-1991 Instrument voltage transformers GB/T 16927.1-1997 high voltage test techniques Part 1. General test requirements When using this procedure, it should pay attention to using the currently valid version of the referenced standard.

3 metering performance requirements

3.1 basic error When the ambient temperature is 0 ℃ ~ 40 ℃, relative humidity less than 80%, ambient electromagnetic interference and mechanical vibration can be ignored Murillo, measuring voltage transformer rated frequency, rated power factor and load secondary rated secondary load When any value between 25% to 100% of each accuracy level of error should not exceed the limits in Table 1. The actual error curve voltage transformer should not exceed the scope of Table 1 lists a line formed by connecting the error limits. Table 1 Measuring voltage transformer error limits Accuracy level Error ratio (±) Magnification Factor Rated voltage percentile 205080100120 Phase error (±) Magnification Factor Rated voltage percentile 205080100120 0.5 0.2 0.1 0.05 0.02 0.01 - - 0.5 0.5 0.5 0.4 0.3 0.2 0.2 0.2 0.20 0.15 0.10 0.10 0.10 0.100 0.075 0.050 0.050 0.050 0.040 0.030 0.020 0.020 0.020 0.020 0.015 0.010 0.010 0.010 ( ') - - 20 20 20 10.0 7.5 5.0 5.0 5.0 4.0 3.0 2.0 2.0 2.0 1.2 0.9 0.6 0.6 0.6 0.60 0.45 0.30 0.30 0.30 0.005 0.002 0.001 × 10-6 10075505050 4030202020 × 10-6 (Rad) 10075505050 4030202020 Note. The rated secondary load 0.2VA or less, the lower limit of the load by 0VA assessment.