US$489.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. JJG 314-2010: Verification Regulation of Instrument Voltage Transformers Status: Valid JJG 314: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| JJG 314-2010 | English | 489 |
Add to Cart
|
4 days [Need to translate]
|
Verification Regulation of Instrument Voltage Transformers
| Valid |
JJG 314-2010
|
| JJG 314-1994 | English | 839 |
Add to Cart
|
6 days [Need to translate]
|
Verification Regulation of Voltage Transformers of Measuring Service
| Obsolete |
JJG 314-1994
|
| JJG 314-1983 | English | RFQ |
ASK
|
3 days [Need to translate]
|
(Chinese Industry Standard)
| Obsolete |
JJG 314-1983
|
PDF similar to JJG 314-2010
Basic data | Standard ID | JJG 314-2010 (JJG314-2010) | | Description (Translated English) | Verification Regulation of Instrument Voltage Transformers | | Sector / Industry | Metrology & Measurement Industry Standard | | Classification of Chinese Standard | A55 | | Classification of International Standard | 17.220 | | Word Count Estimation | 21,283 | | Date of Issue | 2010-11-05 | | Date of Implementation | 2011-05-05 | | Older Standard (superseded by this standard) | JJG 314-1994 | | Quoted Standard | JB/T 5473-1991; GB/T 16927.1-1997 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine | | Summary | This standard applies to rated frequency 50HZ (or 60HZ) of 0. 001 ~ 0. 5 for measuring voltage transformer initial verification, testing and use of follow-up inspection. |
JJG 314-2010: Verification Regulation of Instrument Voltage Transformers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Verification Regulation of Instrument Voltage Transformers
State verification procedures People's Republic of China
Measuring voltage transformer
Issued on. 2010-11-05
2011-05-05 implementation
The State Administration of Quality Supervision, Inspection and Quarantine released
Measuring voltage transformer test procedures
Voltag
eTransformers
Replacing JJG 314-1994
The regulations by the State Administration of Quality Supervision, Inspection and Quarantine approved on November 5, 2010, and from
From May 5, 2011 implemented.
Focal point. the National Technical Committee on Electromagnetic measurement
The main drafting units. the national high voltage metering station
Participated in the drafting. Guangdong Electric Power Research Institute
Jiangsu Provincial Power Company
Henan Institute of Metrology
Hunan Electric Power Test & Research Institute
The measurement procedure commissioned the National Technical Committee is responsible for interpreting electromagnetic
The main drafters of this procedure.
Wang Qin (the national high voltage metering station)
Man Ray (the national high voltage metering station)
Wangle Ren (the national high voltage metering station)
Drafters participate.
Zhou Shangli (Guangdong Electric Power Research Institute)
Huang Qifeng (Jiangsu Provincial Power Company)
STAFF time (Henan Institute of Metrology)
Zhou Weihua (Hunan Electric Power Test & Research Institute)
table of Contents
1 Scope (1)
2. Referenced Documents (1)
3 metering performance requirements (1)
3.1 basic error (1)
Lift variation 3.2 (2)
3.3 Stability (2)
4 General Requirements (2)
4.1 Appearance (2)
4.2 insulation (2)
5 control of measuring instruments (2)
5.1 verification Conditions (2)
5.2 Verification Project (3)
5.3 Verification Methods (4)
5.4 Verification Results Processing (9)
5.5 test cycle (10)
Appendix A test record format (11)
Appendix B test certificate page format (13)
Appendix C test results in the notice page format (15)
Measuring voltage transformer test procedures
1 Scope
Measuring 0.001 ~ 0.5 of this Regulation applies to the rated frequency of 50Hz (or 60Hz) with a voltage mutual
Sensor (hereinafter referred to as voltage transformer) the initial verification, subsequent verification and in-service inspection.
2 Citations
The regulations cited the following criteria.
JB/T 5473-1991 Instrument voltage transformers
GB/T 16927.1-1997 high voltage test techniques Part 1. General test requirements
When using this procedure, it should pay attention to using the currently valid version of the referenced standard.
3 metering performance requirements
3.1 basic error
When the ambient temperature is 0 ℃ ~ 40 ℃, relative humidity less than 80%, ambient electromagnetic interference and mechanical vibration can be ignored
Murillo, measuring voltage transformer rated frequency, rated power factor and load secondary rated secondary load
When any value between 25% to 100% of each accuracy level of error should not exceed the limits in Table 1.
The actual error curve voltage transformer should not exceed the scope of Table 1 lists a line formed by connecting the error limits.
Table 1 Measuring voltage transformer error limits
Accuracy
level
Error ratio (±)
Magnification
Factor
Rated voltage percentile
205080100120
Phase error (±)
Magnification
Factor
Rated voltage percentile
205080100120
0.5
0.2
0.1
0.05
0.02
0.01
- - 0.5 0.5 0.5
0.4 0.3 0.2 0.2 0.2
0.20 0.15 0.10 0.10 0.10
0.100 0.075 0.050 0.050 0.050
0.040 0.030 0.020 0.020 0.020
0.020 0.015 0.010 0.010 0.010
( ')
- - 20 20 20
10.0 7.5 5.0 5.0 5.0
4.0 3.0 2.0 2.0 2.0
1.2 0.9 0.6 0.6 0.6
0.60 0.45 0.30 0.30 0.30
0.005
0.002
0.001
× 10-6
10075505050
4030202020
× 10-6
(Rad)
10075505050
4030202020
Note. The rated secondary load 0.2VA or less, the lower limit of the load by 0VA assessment.
|