US$719.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. JJF 1245.4-2019: Program of Pattern Evaluation of Fixed AC Electricity Meters - Special Requirements and Safety Requirements Status: Valid JJF 1245.4: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JJF 1245.4-2019 | English | 719 |
Add to Cart
|
5 days [Need to translate]
|
Program of Pattern Evaluation of Fixed AC Electricity Meters - Special Requirements and Safety Requirements
| Valid |
JJF 1245.4-2019
|
JJF 1245.4-2010 | English | 959 |
Add to Cart
|
5 days [Need to translate]
|
Program of pattern evaluation of electricity meters. Particular requirements. Electromechanical meters for reactive energy(Classes 2 and 3)
| Obsolete |
JJF 1245.4-2010
|
PDF similar to JJF 1245.4-2019
Basic data Standard ID | JJF 1245.4-2019 (JJF1245.4-2019) | Description (Translated English) | Program of Pattern Evaluation of Fixed AC Electricity Meters - Special Requirements and Safety Requirements | Sector / Industry | Metrology & Measurement Industry Standard | Classification of Chinese Standard | A55 | Classification of International Standard | 17.220 | Word Count Estimation | 33,372 | Date of Issue | 2019 | Date of Implementation | 2020-03-31 | Issuing agency(ies) | State Administration for Market Regulation |
JJF 1245.4-2019: Program of Pattern Evaluation of Fixed AC Electricity Meters - Special Requirements and Safety Requirements ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Outline of Type Evaluation of Installed AC Energy Meters-Special Requirements and Safety Requirements)
National Measurement Technical Specification of the People's Republic of China
Outline of Type Evaluation of Installed AC Energy Meter
Special requirements and safety requirements
Published on December 31,.2019
2020-03-31 Implementation
Issued by the State Administration of Market Supervision and Administration
Outline of Type Evaluation of Installed AC Energy Meter
Special requirements and safety requirements
Partial replacement
JJF 1245.1~6-2010
Centralized unit. National Electromagnetic Measurement Technical Committee
Main drafting unit. Jiangsu Academy of Metrology
Zhejiang Academy of Metrology
Participated in the drafting unit. State Grid Zhejiang Electric Power Company Electric Power Research Institute
This specification entrusts the National Electromagnetic Measurement Technical Committee to interpret
The main drafters of this specification.
Deng Lingxiang (Jiangsu Institute of Metrology)
Li Bo (Jiangsu Institute of Metrology)
Jiang Yang (Zhejiang Institute of Metrology)
Participating drafters.
Shao Yuda (Jiangsu Institute of Metrology)
Li Baoting (Jiangsu Institute of Metrology)
Yao Li (State Grid Zhejiang Electric Power Research Institute of Electric Power)
Zhu Zhongwen (Zhejiang Institute of Metrology)
table of Contents
Introduction (Ⅱ)
1 Scope (1)
2 References (1)
3 Terminology (2)
4 Overview (3)
5 Legal management requirements (3)
6 Metrology and technical requirements (4)
6.1 Rated working conditions (4)
6.2 Accuracy requirements (4)
6.3 Permitted influence (5)
6.4 Permissible interference (6)
6.5 Power consumption (6)
6.6 Radio interference suppression (7)
6.7 Safety requirements (7)
7 Type evaluation item list (11)
8 Technical data and test prototypes to be submitted by the applicant (11)
9 Test methods and conditions of type evaluation items (11)
9.1 General test conditions (11)
9.2 Accuracy requirements (12)
9.3 Permitted influence (13)
9.4 Permissible interference (15)
9.5 Power consumption (16)
9.6 Radio interference suppression test (18)
9.7 Safety requirements (19)
10 Type evaluation record format (25)
Appendix A List of Test Items (26)
Introduction
"Type Evaluation Outline of Installed AC Watt-hour Meter" refers to international recommendations OIMLR46-1/-2.2012 and
GB/T 17215 series of national standards, and in accordance with JJF 1016-2014 "Outline of Type Appraisal Outline of Measuring Instruments"
Prepared by the requirements of "Guide to Writing." Contains the following 5 parts.
---JJF 1245.1-2019 "Type Evaluation Outline of Installed AC Energy Meter Active Energy Meter";
---JJF 1245.2-2019 "Software Requirements for Type Evaluation Outline of Installed AC Energy Meter";
---JJF 1245.3-2019 "Reactive Reactive Energy Meter for Type Evaluation Outline of Installed AC Energy Meter";
---JJF 1245.4-2019 "Special Requirements and Safety Requirements for Type Evaluation Outline of Installed AC Energy Meters";
---JJF 1245.5-2019 "Functional Requirements for Type Evaluation Outline of Installed AC Energy Meter".
When using the "Type Evaluation Outline of Installed AC Watt-hour Meter" for the type evaluation test of the AC Watt-hour meter, the
According to the characteristics of the energy meter, select the corresponding part of the outline.
This series outline replaces the original series outline JJF 1245.1~6-2010, compared with JJF 1245.1~6-2010,
The main changes are as follows.
---Adopt a new frame structure. no longer use general requirements-special requirements structure. With international recommendations OIML
R46-1/-2.2012 is the main part, adding relevant content of GB/T 17215 series of national standards. JJF 1245.1-2019
And JJF 1245.2-2019 basically covers the content of OIMLR46-1/-2.2012; JJF 1245.3-2019
According to the content of reactive energy meter measurement and technical requirements in the national standard, it is compiled according to the architecture of JJF 1245.1-2019
Write; JJF 1245.4-2019 according to JJF 1245.1-2019 and JJF 1245.3-2019 not covered but national standards
Contains the content preparation of measurement and technical requirements and safety-related requirements; JJF 1245.5-2019 in JJF
Revised on the basis of 1245.6-2010.
--- Added software requirements. JJF 1245.2-2019 refers to international recommendations OIMLR46-1/-2.2012
The content of the quantitative performance protection chapter, combined with the technical characteristics and management requirements of my country's electric energy meter, proposes software requirements for the electric energy meter
Seeking, and give the verification method.
--- Added and revised measurement and technical requirements. increased durability, higher harmonics, differential mode current interference, electricity
Rapid changes in current, ringing wave and other items, modified voltage and current harmonics, constant magnetic field, radio frequency electromagnetic field radiation, electricity
Pressure drop and short-term interruption, vibration, sunlight radiation protection, waterproof and other test items.
The previous releases of this series of outlines are.
JJF 1245.1-2010 "General Requirements for Type Evaluation Outline of Installed Energy Meter"
JJF 1245.2-2010 "Specification Requirements for Type Evaluation Outline of Installed Watt-hour Meter" Electromechanical Active Watt-hour Meter
(Level 0.5, 1 and 2)
JJF 1245.3-2010 "Specification Requirements for Type Evaluation Outline of Installed Watt-hour Meter" Static Active Watt-hour Meter
(0.2S, 0.5S, level 1 and 2)》
JJF 1245.4-2010 "Specification Requirements for Type Evaluation Outline of Installed Watt-hour Meter" Electromechanical Reactive Watt-hour Meter
(Levels 2 and 3)
JJF 1245.5-2010 "Specification Requirements for Type Evaluation Outline of Installed Watt-hour Meter" Static Reactive Watt-hour Meter
(Levels 2 and 3)
JJF 1245.6-2010 "Special Requirements for Installed Energy Meter Type Evaluation Outline Functional Energy Meter"
Special instructions for this specification.
This specification is mainly compiled with reference to the contents of GB/T 17215.211 and IEC 62052-31.
Outline of Type Evaluation of Installed AC Energy Meter
Special requirements and safety requirements
1 Scope
This specification applies to single and three-phase installed active and reactive energy meters with a frequency of 50Hz or 60Hz (hereinafter referred to as
Type evaluation of special requirements and safety requirements of instrument).
This specification does not apply to instruments whose nominal voltage exceeds 600V (multiphase instruments are line-to-neutral voltage)
Instrument connected to electronic transformer (GB/T 20840.8-2007), used to connect low-voltage current sensor
(IEC 61869-10.2017) The data interface of instrument, portable instrument, standard electric energy meter and instrument register.
2 Reference documents
This specification refers to the following documents.
JJF 1245.1-2019 installation type AC energy meter type evaluation outline active energy meter
JJF 1245.3-2019 type-installed AC energy meter type evaluation outline reactive energy meter
GB/T 5169.11-2017 Fire hazard testing for electrical and electronic products. Part 11.Glow wire/hot wire base
Glow wire flammability test method for finished products of this test method (GWEPT)
GB/T 16927.1-2011 High voltage test technology Part 1.General definition and test requirements
GB/T 17215.211 General requirements, tests and test conditions for electrical measuring equipment (AC) Part 11.
measuring equipment
GB/T 17626.12-2013 Electromagnetic compatibility test and measurement technology Ring wave immunity test
GB/T 17626.29-2006 electromagnetic compatibility test and measurement technology DC power input port voltage temporary
Immunity test for voltage drop, short interruption and voltage change
GB/T 20840.8-2007 Transformers Part 8.Electronic current transformers
IEC 60068-2-75.2014 Environmental testing for electrical and electronic products. Part 2.Test methods Test Eh.
Hammer test (Environmental testing-Part 2-75.Tests.TestEh.Hammertests)
IEC 61000-4-8.2009 Electromagnetic Compatibility (EMC) Part 4-8.Test and Measurement Technology Power Frequency
Electromagnetic interference test (Electromagneticcompatibility (EMC)-Part 4-8.Testingandmeas-
urementtechniques-Powerfrequencymagneticfieldimmunitytest)
IEC 61000-4-19.2014 Electromagnetic Compatibility (EMC) Part 4-19.Test and measurement technology
Differential mode conducted interference test (Electromagnetic) of the signal frequency range of the streaming power port from 2kHz to 150kHz
compatibility(EMC)-Part 4-19.Testingandmeasurementtechniques-Testforim-
munitytoconducted,differentialmodedisturbancesandsignalinginthefrequencyrange
2kHzto150kHzata.c.powerports)
IEC 61869-10.2017 Instrument transformers Part 10.Additional requirements for low-power passive current transformers
(Instrumenttransformers-Part 10.Additionalrequirementsforlow-powerpassive
currenttransformers)
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JJF 1245.4-2019_English be delivered?Answer: Upon your order, we will start to translate JJF 1245.4-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JJF 1245.4-2019_English with my colleagues?Answer: Yes. The purchased PDF of JJF 1245.4-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version JJF 1245.4-2019?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version JJF 1245.4-2019 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|