US$319.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JG/T 454-2014: On-site test method of sealed insulating glass units for doors, windows and curtain walls in buildings Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JG/T 454-2014 | English | 319 |
Add to Cart
|
3 days [Need to translate]
|
On-site test method of sealed insulating glass units for doors, windows and curtain walls in buildings
| Valid |
JG/T 454-2014
|
Standard similar to JG/T 454-2014 JGJ/T 454
Basic data Standard ID | JG/T 454-2014 (JG/T454-2014) | Description (Translated English) | On-site test method of sealed insulating glass units for doors, windows and curtain walls in buildings | Sector / Industry | Building & Construction Industry Standard (Recommended) | Classification of Chinese Standard | F31 | Classification of International Standard | 91.120.01 | Word Count Estimation | 12,164 | Date of Issue | 12/2/2014 | Date of Implementation | 5/1/2015 | Quoted Standard | GB/T 11944-2012; GB/T 18144 | Regulation (derived from) | Ministry of Housing and Urban-Rural Development Notice No. 633 | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China | Summary | This Standard specifies the building windows and doors, curtain wall hollow glass dew point gas spacer layer thickness, the inert gas content, the degree of bending wave, surface stress field detection method. This Standard applies to doors and windows, c |
JG/T 454-2014: On-site test method of sealed insulating glass units for doors, windows and curtain walls in buildings ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
On-site test method of sealed insulating glass units for doors, windows and curtain walls in buildings
ICS 91.120.01
P31
People's Republic of China building industry standards
Building doors and windows, curtain wall insulating glass performance
On-site testing methods
On-sitetestmethodofsealedinsulatingglassunitsfordoors, windowsand
2014-12-04 released
2015-05-01 implementation
Ministry of Housing and Urban-Rural Development, People's Republic of China released
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard proposed by the Ministry of Housing and Urban Standard and Design Institute.
This standard by the Housing and Urban-Rural Construction Products and Components Standardization Technical Committee.
This standard is drafted by. China Building Materials Inspection and Certification Group Co., Ltd., the national safety glass and quartz glass quality supervision
Inspection center.
Participated in the drafting of this standard. National Special Glass Quality Supervision and Inspection Center, Shanghai Institute of Building Research (Group) Co., Ltd.,
China Building Materials Inspection and Certification Group Beijing Tianyu Co., Ltd., China Building Materials Academy.
The main drafters of this standard. Wang Jing Jing, Bu Cong, Ding Guoqiang, Xiao Pengjun, Wen Yu Gang, Liang Hui Chao, Li Boye, left Hui Xia, Li Yang, Yue Peng,
Wang Ping, Gao Yonghui, Yao Hua, Zhang Chaojie, Xu Qinchang, Wang Dong, Wang Li, Qiu Juan, Wang Runmei, Dai Zheng, Zhang Yutang.
Building doors and windows, curtain wall insulating glass performance
On-site testing methods
1 Scope
This standard specifies the dew point of insulating glass for building windows and doors, curtain walls, gas barrier layer thickness, inert gas content, wave curvature,
Surface stress field detection methods.
This standard applies to the construction of windows and doors, curtain wall with insulating glass on-site testing. Among them, the surface stress on-site testing methods applicable to the float
Tempered glass made of glass, the test surface is float glass immersion tin surface; inert gas content of the field detection methods for inflatable hollow
glass.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 11944-2012 insulating glass
GB/T 18144 glass stress test method
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Inert gas content
In a fixed gas chamber, the inert gas volume ratio.
Note. The inert gas content of the current stage content, non-initial content.
4 dew point
4.1 detection principle
The low temperature characteristics of the dry ice will be used to cool the cold end of the adjustable temperature dew point meter. By controlling the distance between the dry ice and the cold end, the temperature of the cold end will be continuous
Controllable. On-site inspection, the cold end of the hollow glass surface with full contact, the cold end of the hollow glass surface to cool the local cooling. When gradually reduced
Cold-side temperature reaches the specified temperature and contact with the surface of the insulating glass to achieve the specified time, observe the hollow glass cavity is connected
Touch parts condensation or frosting.
4.2 detection equipment
4.2.1 Adjustable temperature dew point meter or other testing instruments that meet the requirements. Detection equipment temperature measurement range of -60 ℃ ~ 0 ℃, accuracy is
± 1 ℃.
4.2.2 Adjustable temperature dew point meter. The cold end, the temperature guide block, the barrel, the outer barrel, adjusting ring, spring, dial indicator and other components, the structure of the instrument shown in Figure 1
Show. The diameter of the cold side contact with the glass should be 25 mm.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JG/T 454-2014_English be delivered?Answer: Upon your order, we will start to translate JG/T 454-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JG/T 454-2014_English with my colleagues?Answer: Yes. The purchased PDF of JG/T 454-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|